PROJECT UNDERSTANDING <br />WATER RESOURCES (OPTION A) <br />We understand that the City is seeking the design and <br />construction support services for the Santa Ana Water <br />Project. This project includes the rehabilitation of an <br />existing water well approximately 30 years old, and the <br />design of:L500-feet of 12-Inch PVC water main and the <br />construction of 600-fast of 15-Inch sewer main on an <br />arterial street. The City would like for the consultant to <br />provide feedback regarding the material of choice for the <br />sewer main improvements. Also, the City would like to <br />connect this well to the water system, as of right now It <br />does connect to an existing onsite reservoir. This well is <br />a sand producer, and currently the capacity has dropped <br />by approximately 35% of its maximum yield of 2000 GPM. <br />The depth of the well Is approximately ItOO-feet, It has <br />a vertical turbine pump with a 250hp motor. In addition, <br />the screens are made of mild steel, No video or any other <br />preventive maintenance has been done in the past 15 <br />year& <br />Well Rehabilitation <br />Our proposed scope of work Is divided Into a two-phase <br />approach. Phase I will Include reconnaissance of the <br />well to characterize the current condition and develop <br />a rehabilitation plan, Phase 11 will be to perform the <br />rehabilitation necessary to restore the well to proper <br />working order. <br />Since the rehabilitated well is to be connected to <br />the distribution system, NV5's design will Include <br />considerations for the following required appurtenances: <br />• Flow control valve <br />• Pui np to waste systerri <br />• Chlorination <br />• SCADA connection <br />It Is assumed that the well will be re-eqUipped with a <br />now pump, motor, MCC, and appurtenances, <br />Watei and Sewer Mains <br />Both the water main and sewer extensions will be <br />designed according to City standards. NV5 would typically <br />specify high -strength VOP for the proposed 15-Inch sewer. <br />PROJECT UNDERSTANDING <br />GENERAL ENGINEERING (OPTION B) <br />We understand that the city is seeking the design and <br />construction support services for the mile Ono Street <br />Project, This project will follow a complete street concept. <br />The length of the project Is approximately 1,000 linear <br />feet. Both intersections at tile outer limits of the project <br />have been modified as part of the oomplete street project <br />under previous phase. The proposed project consists of <br />street rehabilitation, bicycle lane, sidewalk, and parkway <br />improvements, The sidewalks are 6 feet wide and the <br />Parkways are 4 feet wide. The project also includes <br />widening of the east side of the street to accommodate <br />a new bicycle lane, The right of way is approximately 12 <br />feet wide with three traffic lanes In each direction with a <br />14 foot wide median. The required right of way has been <br />acquired by the City. <br />GENERAL APPROACH <br />Work nlr(, <br />.akdown Structure <br />Upon Issuance of a notice to proceed, our project manager <br />will meet with team members to review the requirements, <br />prepare a Work Breakdown Structure and make team <br />assignments for maximum efficiency of resources. The <br />detailed WBS will describe all of the work tasks necessary <br />to complete the project. A master project schedule will <br />be prepared following the WBS to show tile relationship <br />between tasks, the expected start date and duration <br />for each Item, This schedule will serve as a guide to <br />conducting and monitoring the progress of the work and <br />to ensure projects are completed on time and within <br />budget. To ensure accurate monitoring and tracking of <br />documents, revisions and progress, a document tracking <br />and control system will be developed. We will meet <br />with City project representatives regularly and maintain <br />constant communication to ensure successful and timely <br />delivery of the project, Meeting minutes will be distributed <br />within one week of the meeting identifying actions, items, <br />assignments and due dates. <br />Cost Connol <br />We are able to continually review and evaluate a project's <br />cost through all project phases to enable informed and <br />25E-441 <br />