My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tim* decision -making by our clients and the entire project <br />team, Cost control techniques Include: program budget <br />analysis; value engineering; life -cycle cost analysis: and <br />quantity -based estimating. We rely on an open -book, <br />inclusive process that demonstrates the costs and benefits <br />of varying design options. This budget confirmation <br />process starts in the earliest stages of the projeot� when <br />design and engineering alternatives have the greatest <br />potential impact on costs. Our design teams analyze <br />client goals, technical requirements, alternative building <br />concepts, construction costs and Iong4erM operational <br />costs to define the optimum scope within the budget <br />ensuring long4erm flexibility and value, <br />Schedule Control <br />The key to effective schedule control is to measure actual <br />progress and compare It to planned progress on a regular <br />basis and to take necessary corrective action immediately. <br />We propose to supplement each major task as Identified in <br />the master project schedule with a supplemental schedule <br />to keep careful track of where each Individual component <br />stands. We identify problem that may result from delays <br />and readily provide the opportunity to modify the schedule, <br />as required. This process ensures the completion of your <br />projects on schedule. <br />innovative and Successful Approaches <br />Our team focuses on providing safe, cost-effective, reliable, <br />and sustainable improvements using Innovative design <br />and contracting techniques that meet the needs of the <br />taxpayers, meet or exceed the minimum standards based <br />on design Improvements, and minimizes impacts to <br />adjacent properties and vehicular and pedestrian traffic. <br />Our experience engineering staff provides lower -cost or <br />lower -impact alternatives in order to develop the least <br />disruptive and least expensive designs. <br />In addition, the NV5 team utilizes the latest in civil <br />engineering design software to facilitate timely, efficient, <br />and Innovative engineering solutions for our clients, Our <br />team relies on a host of computer resources, including <br />up-to-date, state-of-the-art technology that is In use today <br />throughout the engineering industry. We make maximum <br />use of PC -based GADD systems that allow for the storage <br />of typical details, establish similarity of plan layout$, and <br />enable rapid duplications for the efficient preparation of <br />plan sheets. <br />Our team also provides construction management for <br />public works projects to several kxcaI agencies. We will <br />have our in-house construction management staff review <br />plans and specifications for constructatillity. This is a good <br />opportunity to obtain the view of time from the field and <br />reduce potential difficulfies that may be encountered <br />during the construction of a project. <br />Quality Assurance/Quality Control <br />For every design project our team uses a time-lested and <br />proven project quality manual, which describes the project <br />quality process to be followed duringthe development of <br />the design documents and other project doliverables. In <br />general, we undergo the following quality reviews! <br />Project Concept RevIsw4 Reviews basic concepts <br />for feasibility and conformance to project criteria <br />and evaluates engineering decisions based on cost, <br />constructability and risk management. <br />Discipline Review. Verifies the work for each of the <br />technical disciplines, Including subconsultants. Each <br />subconsultant discipline has a review checklist for each <br />submittal to ensure technical accuracy and that there are <br />no conflicts with the civil design and other disciplines. <br />Graphics/CAD Standards Review: Verifies that drawings <br />meet graphic and CAD standards for each prqJect, taking <br />into consideration: color; weight; level style; and level. <br />Project Manager Review. Confirms that project <br />deliverables conform to the scope of work and that <br />documents supplied by others (i.e., cllenL subconsultants, <br />etc,) are properly incorporated. <br />Irt-House Constructability Review. In-house construction <br />managers and inspectors review the plans to ensure <br />feasibility of construction and coordination of drawings. <br />Client Comment Review: Assures that client comments <br />have been addressed; we will either use our standard <br />comment letter response or one provided by the City. <br />Coordiriation Review Meeting, Coordinate all work of the <br />disciplines. <br />QA/QC Review: Independent review to verify the accuracy, <br />completeness and coordination of drawings, specifications <br />and cost estimates for all design disciplines, <br />ff, <br />I <br />I <br />U <br />I <br />25E-442 <br />
The URL can be used to link to this page
Your browser does not support the video tag.