A) Research - Perform research of records including
<br />utilIVAS, 9ftfAgency records as necessary tosebure
<br />information required to Identify, 100te, i.m . d Occurs , te.1y
<br />layout all existing'utillitles, !MPMVojn . ents, eo,"Ment%
<br />and rights-oftV Within p"ject limits that jn�y Interfere
<br />MM the propa , ad lmpr&6ments. The Information to be
<br />P8600101100*11 00, aa a frinimum,Ahe followirg
<br />1. RevIeW %fain utility and $treat record drawing
<br />9
<br />Plans,
<br />2. Perform ilViilylht)ogogatlon/UtilitycDordfnaton
<br />and Provide utility relocation MonlMendatlons, If
<br />necessary.
<br />3. perform AM investigation and measurement to
<br />OseWexisting site conditions,
<br />4. Pirovde.4 COPY 0 till utility nothloatjohtend
<br />H
<br />rasPOh"OP ort0firr-t�PMgre%$PtWrfiOhtrOAUO$t.
<br />6) Smrvoying - Perform 0100010alchlb s4rv�y alonythe
<br />Pipaefignmentiolholu "follow1h
<br />-do
<br />I. PrOvIde1QPO&A0hh3uFVay U$In$401ty standard. North
<br />American Datur.n.1983.
<br />Z Provide 0000)466t C.Ontoursbased on City of Santa
<br />Ana Vertical datum (NM agy�
<br />31 Provide spot elevations lit Critical locatlons along the
<br />alignment to VOWY vertical control, check exisjir�
<br />9
<br />Allitibs, such asitewer manholes and ZtOmA drain
<br />Jonotion structures.
<br />4. Survey flow -line elevations of existirig underground
<br />sewerand etorm drain utilities crossing Proposed
<br />pipeline, . ;
<br />5, Provide spot elevations at all locations where existing
<br />-utilities are patholed.
<br />6� Show Surface features and visible indications
<br />of MdOl:11% utilities to Include Curbs And gutters,
<br />sidewalks, and Other Olam$nts fOlovant to prepare
<br />comprehensive topographic Map suitable for pipeline
<br />design and construction,
<br />7. EstabNah street edritorlines, dght�of-way lines, and
<br />08semOAts from available record Information.
<br />S. Provide the,,basis-of-boPrIng and benchmark
<br />Information used for the survey and necessary for
<br />construction.
<br />1P) Utility Locating/Potholfing - Perform necessary
<br />research to Identify all existingAllitles and potential
<br />confflcts� Pothole existing utilities to verify depth and
<br />location lassume:1.5 Potholes), Measure and Identify in the
<br />potholing report the depth Of P' avoment and base material
<br />at each location patholed, Provide all requited traffic
<br />control and surface repair necessary for potholing work.
<br />TASK 3 - ]PACLIMINARY DMJGN
<br />Develop a preliminary design Of the project site to
<br />review withOlty4off, An,approximate 30% design love
<br />will-corMlItuts et Pre.11minaryDesigii for this-projeot
<br />PhOlirrinatYclOsIgn will1nolude, but not Iftnitedtotha
<br />following.
<br />- Existing utilities
<br />a Existing pavement, purt), &"r, sldeWafk,
<br />drivaways
<br />Permitilngrequiramorpip
<br />Traffic Inipacts
<br />PtOPOSO'd pipe Ofignmord and connections
<br />PrOPOsOd PaYsment, OL!rb, Outter., sldswall�vrlveways
<br />Based on survey.nMultO 800 MY Inp4 NV5 will
<br />design Proposed ivater And saw6r improvements
<br />Preliminary construction cpst estimate
<br />Spheaule.
<br />TASK 4 - FINAL ENOINCERINd AND, PREPARMON
<br />OF CQN$TRUCTION CONTR40T DOCUMENTS
<br />Mnal Engineering WIN include detailed engineering
<br />calculations, desigm.construcion Plans, and anginser's
<br />construction Cost 691mate-for
<br />� the MOO that Will enable
<br />the City to advertise and award the construotion contract
<br />for the Prolect, 0OMPOnOnts of this task ind ude.
<br />A) Plan and Project RocMentO Preparation$ (75%,
<br />1JDO%, and Final) - N'V5 will submit One 4) 60 Of 244noh
<br />x 36-Inch and two (2) sets of li-Inch x -17-Inch plans on
<br />bond paper for eacKsubmitfial, Paper submittals will be
<br />accompanied by a CD with scanned image$ (PDF flies) of
<br />submittals, The final submittal WIN include one (1) set of
<br />244nch x 364noh original signed/seated Plans on bond
<br />Paper, One (1) set of bid form, opinion of 0onstructipri cost,
<br />and electronic MOO as described heroin,
<br />MY will review and return 60% Plane With comments
<br />pertaining to required Improvements for the pvcjecA. plans
<br />and Prolect documents submitted as 100% wNI incorporate
<br />Oil COMmehts. NVI5 Will Provide a digital copy of the
<br />OPProved PrOffict Plans in MicrOstation V81 and PDF tothe
<br />City on a Compact disc,
<br />B) Engineers Construction Cost Opinion
<br />i. Engineer's construction cost opinion and quantity
<br />takeoff (In MS Excel format) for use by the Cky to
<br />advertise for bid,
<br />2� Bid SChOdUle/measurement and payment,
<br />25E-451