Laserfiche WebLink
A) Research - Perform research of records including <br />utilIVAS, 9ftfAgency records as necessary tosebure <br />information required to Identify, 100te, i.m . d Occurs , te.1y <br />layout all existing'utillitles, !MPMVojn . ents, eo,"Ment% <br />and rights-oftV Within p"ject limits that jn�y Interfere <br />MM the propa , ad lmpr&6ments. The Information to be <br />P8600101100*11 00, aa a frinimum,Ahe followirg <br />1. RevIeW %fain utility and $treat record drawing <br />9 <br />Plans, <br />2. Perform ilViilylht)ogogatlon/UtilitycDordfnaton <br />and Provide utility relocation MonlMendatlons, If <br />necessary. <br />3. perform AM investigation and measurement to <br />OseWexisting site conditions, <br />4. Pirovde.4 COPY 0 till utility nothloatjohtend <br />H <br />rasPOh"OP ort0firr-t�PMgre%$PtWrfiOhtrOAUO$t. <br />6) Smrvoying - Perform 0100010alchlb s4rv�y alonythe <br />Pipaefignmentiolholu "follow1h <br />-do <br />I. PrOvIde1QPO&A0hh3uFVay U$In$401ty standard. North <br />American Datur.n.1983. <br />Z Provide 0000)466t C.Ontoursbased on City of Santa <br />Ana Vertical datum (NM agy� <br />31 Provide spot elevations lit Critical locatlons along the <br />alignment to VOWY vertical control, check exisjir� <br />9 <br />Allitibs, such asitewer manholes and ZtOmA drain <br />Jonotion structures. <br />4. Survey flow -line elevations of existirig underground <br />sewerand etorm drain utilities crossing Proposed <br />pipeline, . ; <br />5, Provide spot elevations at all locations where existing <br />-utilities are patholed. <br />6� Show Surface features and visible indications <br />of MdOl:11% utilities to Include Curbs And gutters, <br />sidewalks, and Other Olam$nts fOlovant to prepare <br />comprehensive topographic Map suitable for pipeline <br />design and construction, <br />7. EstabNah street edritorlines, dght�of-way lines, and <br />08semOAts from available record Information. <br />S. Provide the,,basis-of-boPrIng and benchmark <br />Information used for the survey and necessary for <br />construction. <br />1P) Utility Locating/Potholfing - Perform necessary <br />research to Identify all existingAllitles and potential <br />confflcts� Pothole existing utilities to verify depth and <br />location lassume:1.5 Potholes), Measure and Identify in the <br />potholing report the depth Of P' avoment and base material <br />at each location patholed, Provide all requited traffic <br />control and surface repair necessary for potholing work. <br />TASK 3 - ]PACLIMINARY DMJGN <br />Develop a preliminary design Of the project site to <br />review withOlty4off, An,approximate 30% design love <br />will-corMlItuts et Pre.11minaryDesigii for this-projeot <br />PhOlirrinatYclOsIgn will1nolude, but not Iftnitedtotha <br />following. <br />- Existing utilities <br />a Existing pavement, purt), &"r, sldeWafk, <br />drivaways <br />Permitilngrequiramorpip <br />Traffic Inipacts <br />PtOPOSO'd pipe Ofignmord and connections <br />PrOPOsOd PaYsment, OL!rb, Outter., sldswall�vrlveways <br />Based on survey.nMultO 800 MY Inp4 NV5 will <br />design Proposed ivater And saw6r improvements <br />Preliminary construction cpst estimate <br />Spheaule. <br />TASK 4 - FINAL ENOINCERINd AND, PREPARMON <br />OF CQN$TRUCTION CONTR40T DOCUMENTS <br />Mnal Engineering WIN include detailed engineering <br />calculations, desigm.construcion Plans, and anginser's <br />construction Cost 691mate-for <br />� the MOO that Will enable <br />the City to advertise and award the construotion contract <br />for the Prolect, 0OMPOnOnts of this task ind ude. <br />A) Plan and Project RocMentO Preparation$ (75%, <br />1JDO%, and Final) - N'V5 will submit One 4) 60 Of 244noh <br />x 36-Inch and two (2) sets of li-Inch x -17-Inch plans on <br />bond paper for eacKsubmitfial, Paper submittals will be <br />accompanied by a CD with scanned image$ (PDF flies) of <br />submittals, The final submittal WIN include one (1) set of <br />244nch x 364noh original signed/seated Plans on bond <br />Paper, One (1) set of bid form, opinion of 0onstructipri cost, <br />and electronic MOO as described heroin, <br />MY will review and return 60% Plane With comments <br />pertaining to required Improvements for the pvcjecA. plans <br />and Prolect documents submitted as 100% wNI incorporate <br />Oil COMmehts. NVI5 Will Provide a digital copy of the <br />OPProved PrOffict Plans in MicrOstation V81 and PDF tothe <br />City on a Compact disc, <br />B) Engineers Construction Cost Opinion <br />i. Engineer's construction cost opinion and quantity <br />takeoff (In MS Excel format) for use by the Cky to <br />advertise for bid, <br />2� Bid SChOdUle/measurement and payment, <br />25E-451 <br />