Laserfiche WebLink
Harbor Boulevard Street, Median and Landscape Improvements <br />CITY OF COSTA MESA I COSTA MESA, CA <br />Project Mahagen Mr. Niknafia managed the preparation of Plains, 4peolliqations,'bOd cost salmeteefor the'design of <br />Imlorovernents on Harbor Boulevard, Includin-941'Iset Ohd 111001an l0ndeft1hill ImPiWoments. The City weamwarded Federal <br />Hljhway Safety improvement Program funds toinstall Madlans.6 landscaping, and associated Improvan.)Wits to Improw <br />pedestrian end traffic safely, A traffic g na�lyals was conducted to establish median oponIngs and turn pocket lane length, a, <br />Our team d000dinated with stakeholders Including the residents end business owners, and public outreach community <br />me6tlh94 were scheduled so the conceptual planscouid be presented to. the" community, <br />East 19th Street Design Improvements <br />PITY OF COSTA MESA I COSTAMESA, CA <br />Project Manager. Mr. Nikylafswas roptinsible for the design Of this roadway, median and parkway landscaping <br />irnpro"!Pents,prglW.The,Pyojoot;l,ngfuftdlho�removalofteoonstructionofpavomelit, ndr ut f b, <br />a ownstr c km c our , guitW, <br />or%$ gutteri sidewalk, Wheelchair ramp ard driveway, His responsibilities Included managing the preparation of. the pianpi <br />Opeoftationa4nd cost estimates; andassisting the City with the preparation of PESa , nd E-76 certification, as well es with <br />the tUbmittaland processing through Caltrang, <br />Wilmington Avenue Pedestrian and Blpyclo improvement$ <br />C" OF COMPTON I COMPTON, CA <br />Project Manager. Mr. (0nalis was responsible for providing engineering services Including pJa. ns, <br />SPOC111001:10r1% cost estimates 0 nd related Old clo6uments for the. Wiln-dnifon Avenue Safe Sinsets Fedostrtoraky* <br />ImpOvOM611A POJ60t, The Orpieet Included pavement rehabilitation on Wilmington Avenue from ElSogvindtl pculd�a�d to <br />RoaftrOnsAyerrup. Scope of work consisted of various pedestdariand WOO$ . h0rWamerft Wo Installation.6f wIder and <br />colored crosswalks; countdown pedestrian SiginElls; efthahoeq) pa00%lna�n Ilghtint, the Installation of Class 11 bike lane%with <br />wa�llndlng signage and Class I bike paths', and the Installation of four 01sr-powered speed feedback sips for speodcon"I <br />and attainment <br />FY 2017-18 Annual Street Rehabilitation <br />CITY OF VILLA PARK VILU PARK, CA <br />Project Manager. Mr; Nlknsfs Is responsible for ProvidingPlans, specifications, and estimates for the annual rehabilitation <br />project The Impirpvarneots May Include the removal and replacement of deteriorated $actions ofthe 9'reeto by repaving <br />or slurry seat the strests; construction of curb and gutler or AC burm at certain locations of these streets: and the <br />replacement of curb and gutters as needed to provide adequate drainage, <br />Colonial Avenue.Alley Pavement Project <br />CITY OF CULVER CITY I CULVER CITY, CA <br />Project Manager. Mr. Nii to responsible lot PrWiding professional design services for the Colonial Avenue Alleyway, As <br />part of the Community'Development Block Grant(ODIRG) program, theColonlal Avenue Alleyway Paving project includes the <br />paving of approximately 800 LP by 20 feet wide of the alleyway. The scope of work also involves field revl* t000graphic <br />survey, design plans, Wd schedule and technical S130011108tions, quantity and cost estimates. <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SAWA MONICA, CA <br />Project Manager. Ourteam Was selected to Provide.onginearing design services for the Expo Line Bus Stop Enhancement <br />Project In Santa Monica, Phase 11 of the Expo Line extends the line to Santa Monica, As a result, Big Blue Bus is <br />Irnplomenting a comprehensive redesign of Its transit system to connect passengers with the Expo Line stations in <br />eMmpt to create N more efficlant commute for passengers, These Initiatives also Include the Inclusion of signage, bus <br />berths and overall pedestrian Improvements. Our team Is providing preliminary, sohomatic and final design to Include <br />construction documents detailing bus pads, ADA-compliant wheelchair pads, sidewalk extensions and the location of Our, <br />stops. The work consisted of coo(dination with various agencies and Utility organizations, <br />25E-463 <br />