Laserfiche WebLink
CONTACTINFO <br />CHARLIE McKINLEY, PE <br />Project Manager <br />EXPERIENCE <br />. ........ . ....... <br />Mf� McKinley has more thanS 0 ye4f$ of experience as a Professional ensipear for <br />36yeals <br />both lafg"CSIO Capital ImPrOVOMentprojocts and small infrastructure improvement <br />EDUCATION <br />PwJeOts. He -has a broad range of project experience with 8 focus on pipeline$, pump <br />0.1 010qedloal - <br />statfOM; resetvolirs, and trestmem Mr McKinley brings' an enthUslMstlo approach to <br />-Engineering <br />planning regulatory permitting detailed design and operations review to facilitate civil <br />ifftd OffillmnImOntal engineering prolaots. <br />Civil EhorieorfCA) <br />Projeot EXparlence <br />;40� C38484 <br />AFRUATIONS <br />...... ....... . .. <br />CoronadozOdysSawage Lift Station <br />membera4ard of <br />CITYbF.00RONADO I COA64AD6, CA <br />btreefora,,gociefty <br />Task Leader. Mr. Moill I'lley woo the-takkiander for the design of a complete overhaul <br />Of fiandrican Mliftery <br />of an 670 gpm submersible pump station. pumn wetwell configuration; and <br />Engineers, Orange CounW <br />post <br />various facility 010miants were replaced with current toohriologyas, part of the projact, <br />,Member, American PuOpq <br />Back Basin storm watbe Pump Station <br />Works Association <br />ELISINORE VALLEY MUNIUpAL WArEg J)ISTRIOT I LAKE ELSINORE, CA <br />Project Mahager. This project consWed of the I)MIMInufY and finaf design of a 2 Boo <br />Inland Empke-Chaptof <br />presidem Wotokou" <br />gPm stommaterOYMP station to accommodate the evacuation Of stormwaterfrom' via <br />back basin wetlands dvrin <br />-Association <br />Mountain 80110 Pump Station and Water Meiin <br />V15TA IRRIGATION DISTRICT I VISTA. CA <br />Pr0JQ(d Engineer. As Pmlea�anglneer, Mr. McKinley was responsible for the design <br />, <br />of an Inter-zong transmiftion main. Challenging terrain alignme, rdr; and steep slope <br />installations were Valuated, as well as surge and hydraulics. <br />Fullerton Road Grade Separation-SIOMTwater and Groundwater Pump <br />Stations <br />ROWLAND WATER DISTRlar I INDUSTRY, CA <br />PrQ100t MOnOgOr- Responsible for the design (if a 20,500 gpm Stormwater pump <br />station and a 200 gpm groundwater pump station Ibr the depression of Fullerton Road <br />. <br />under UPRR railroad trooks. The Project Included a hydraulic analyse 8 of storm and <br />groundwater inflow conditions to. Match vith outflow hydrogr4phs, and mechanical, <br />electrical, and structural design. Main pump station weft Permitted by tha.LACDM <br />Dudley Sewer Cornmisslon Consulting <br />TOWN OF DUDLEY I DUDLEY, MA <br />Project Manager. Development of design plans and specifications for three separate <br />sewer extension projects Involving approx]motaly 18,000 feet of gravity sewer, 7,000 <br />feet of force Main, and four duplex submersible PUMP stations with emarganoy power, <br />odor control, and several low-pressure service areas with Individual grinder pumps and <br />diameter <br />small force mains. Also completed a town -wide COMPreheruilve Wastewater <br />Management Plan, Including obtaining State Revolving Fund loans and performance of <br />NIV 15 <br />hydraulic modelingof the seweraystern, as well as an on-sitesystern survey. <br />25E-464 <br />