Laserfiche WebLink
CONTACT INFO <br />DEREK WIESKE, PE <br />derek.wlaskeonvS,com <br />946,6ss.om <br />QuallitY Assuronoe/Quallity Control <br />FXPERIEJNI�E <br />.. . ....... <br />W Wieshe has,more than26 years 00400.0h e*peoertcs in the development, <br />design and construction Of Capitol ftrovemeiht prcjeot�for public agencies. His <br />EDUCATI.ON <br />vast catak)g'0f`PrQJeM IMIU008 1`03dwayband pedestrian Improvementai parks and <br />NIZ.A. <br />landscaping, water and seWer lnfrastructura4 and buildings, Mr.. Wleske has served in a <br />v0rl* Of r0e$ from City Engineer to Director of Public Wbirksibir agOftdles throughout <br />MA. 0101 Engineering <br />94uthorn California including the oldes of Long $each, Laguna Beach, and Lake Forest <br />LJCENSI�s <br />Civil EnohoerJOA) <br />AFRUATJONS <br />Membar,,AroedcanSoo <br />ofcIvIltngineers <br />Member <br />Standan%dSettlng <br />of Registfatton4ar. <br />Prolasslanal gi1ginobrs <br />and (�nd surveyors <br />member (2002), <br />Countryw1loo New <br />Construction Water Quality <br />Task Force <br />Project Experience <br />... . ........... .... . . ............ .......... . ................ . ... <br />Downtown Area Resurfacing. <br />CITY Or LAGUNA BMCH I LAGLNA� EWXH, OA <br />ftolsct MR090f. Mir, WleftpVoisawtho design and construction of the resurmoing <br />of the downtown area Of Laguna Beach. and coordinated,wlth logal.butinft.ses to. <br />MWIT11*60nomfo. Impacts of construction. In addition to StrOat resUlUnIng, the <br />pi4e0tincluded installation of various traffl"pirning teatgres, such as bulboutr� <br />Mr. Wleske Introduced a bbrms.,olausp into the spadficatJohs, which significantly - <br />accelerated project constructon, resulting in of <br />successful project . also from local shop ownomfor a <br />Storrnwatot Diversion Systoring installation <br />CITY OF LAGUNA BEAC[4 I LAGUNA 8FACK'CA <br />PMJW MIRnsg6r. Mr Wleft was responsible for the design end construction of <br />storarivatqrseosirstora (OW Units) to divert urban runoff from roadways,, and the City <br />stormdrain system to the municipal sawer c6lleotlpr) system. Challenges Included <br />working with sewer sysigms without disrupting service, and the design of a system that <br />can ba maintained With relative ease. <br />Lexington Drive Road Improvements <br />CITY OF LOSAIAMITOSJ WS ALAMITOS, CA <br />ROJect M10nagor. Mr. Wlaske was responsible for the Installation ofa nalf-Mile <br />section of arterial hIghwayfroin Katella Avenue to Cerritos Avenue. Hd reviewed <br />and approved plans and specifications and oversaw all oonstructlon managemenV <br />Inspection activitlesfor this Project. The project Involved close coordination with the <br />representatives from the City of Cypress and an adjacent community church that was <br />funding the roadway Improvements. <br />Ball Road and Bloomfield Strisot intersection and Drainage Improvements <br />CITY OF LOS AL-AMITOS I LOS ALAMITOS, CA <br />Pro)"t MIAR890r, Mr, WleskO served as the Project Manager for the Installation or <br />1,400 LF of storm drain and roadway rehabilitatlon. The design aligninentof the <br />storm drain conflicted witli multiple Utilities, Including sewer, water, gas, ofactrio, <br />and oil pipelines. He oversaw the design of the project, Including significant value <br />engineering, plan and specification quality control, bidding process, and coordination <br />with Partnering funding agency, The project required extensive 000rdlnktion with utility <br />agencies to either relocate or adjust conflicting Utilities, <br />25E-466 <br />