My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Rehabilitation and Reconstruction study <br />CRY Or COMPTON I COMPTON, CA <br />P101410t E69111601. Work consisted of hydra is an <br />d physical AVOlvatlOrs Of the City$ major sewerstap <br />(firingSew., <br />feet of 8-to 124hch pipe). The oWacfl�o VOS to prc0ms.taiy46;000 <br />on <br />COW date was reviewed, andlotarvtows. were conducWv�ltk operatfongenlri maintenance psrzQnftaLSpraadsh6fetS we - no <br />developed to prioritize the Improvements for a multiyear program, finally, Qpinlons.of probable oosw worp ptevideo, and, <br />the work WAs.presemed In a Project Study Report <br />Wastewater Colifecilon Systern Upgrade Program <br />CITY OF TORRANCE I TORRANCECA <br />PfolOct MRITA90r; Workwns6,Wd of the completion OfSOVOMI Prolects WuPgade the GIVs sewers <br />. Aft0n. The program <br />Included sewer rehabilitation Initiated byasyrg0t"IdO video PrOgr8mi. preparation Of sewer MAlaoiament and extension: <br />desIgns, and development of a o9nosot design for alley sawarx. A grease control ordinance was also developed th QI <br />Code. for � ty <br />FlUrnore Sewer Interceptors <br />CITY OF P14MDRE I FILLIVORE, CA <br />P"oJect MOnaor. Mr. McKinley was responsible W t0fconceptuall ddsign of newsewarintetcaptom to roIft all tow to a <br />new w0a*Water treatment plant site. Associate <br />0160dosigned as Part ofthIs prplest, 0 and roadway (0firastrUctuft for the new sl*merit were <br />Mentore, Bottlevard Sower <br />CITY OIF�REDLANDS I REDLANDSj CA <br />PYO)Oct Manager. AS project ihaqA§&, Mr. MbRinleyllead1he Planning And 06SIgn Of a sewer extension on Meotone <br />Boulevard (SW38), which Is a majoreacess mute to ArrowheSd/eg Boar. Utility coordination and traffic control were key <br />challenges addressed. At a separate project, he also cbmpleted the design of 5, faej of a at <br />000 ow eXtpnslon. ft)est <br />components included. the Sewer Master Men Update, Prdliblnary Design Report, andplans; Specifications, and estimates. <br />Duahard Trunk Sewer <br />ORANGE QOUNTYSANITATJON DISTRICT I FOUNTAIN VALLEY, CA <br />N0180t Manager, Work consisted of the design and construction management Of IrePlacingthe existing 54-inah pipeline <br />with approAmately 22,000 LF of new 108-Inch c0ncrOte-relnforoed pipe. The Oroject Included geatechnicai and structurel <br />pipe design, and coordination with Involved cities for traffic control. <br />University of Connecticut WWTP Upgrade and Sewer System recliftles plan <br />UNIVERSITY OF CONNECTICUT I SM.RRS, CT <br />PF00011 Faglft6r4ornpletlon of a sewer system evaluation surye <br />, Y to Identify reaches with exessive inflow end Infiltration <br />In the University collection system. An analysis of flows at the treatment plant was completed, as well as a projection of <br />future flows within the Study period. A treatment Plant UP9fade conceptual plar, was also dsvelope�, <br />Lakewood Boulevard Recycled Water Mpollne <br />CITY OF D"EY I DOWNEv� CA <br />I'V016at Manager. Installation of a recycled water main, polable water meter adjustments, and other miscellaneous utility <br />relocations Arid adjustments associated with the design and construction Of street Improvements and enhancements <br />along Lakewood Boulevard from Florence Avenue to Telegraph Road, Project was divided Into two segments: Lakewood <br />Boulevard between Florence Avenue and Gallatin Road (2,800 feet); and Lakewood Boulevard between Gallan Road and <br />Telegraph Road (2,700 feet). <br />25E-465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.