My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACTINFO <br />KYLE HILTONt EIT <br />949.686,0477 <br />PmJect Engineer <br />EXPERIENCE <br />..... ............ ...... . . .......... -1-1. ......... ...... .. . . ......... <br />Mr� fillton has more-thim glx yews of experience In publiaworks Improverrielft <br />6 years <br />Including planning arid OpsIgn of starile, arterial str86ts, rlght-of-wtly engineering, and <br />EDUCATION <br />storm drain desigp. I'lls:pmfiessional exp erlanife also Includes CAD drafting, bridge <br />IS.& civil & Environmental <br />ratitig, water-Nality, Maria.pment Plans (WQMP), Envit-Ohrins"ritsl Impact Reports (EIR), <br />EnWri0irlog <br />end Stoon Mister Pollution Preveritioff PlglIng ($WPPP). He site has also served various <br />LICENSES/CERTIFIcAM <br />-miss for staff atigmerftatonessIgnrilepts, <br />.Civil <br />Project Experience <br />......... .. . ........ ...... ........ ...... .. .... . . . . ................. <br />flancho Palos Vardes Area V Now Striping andSigning- <br />an OF RANWQ PALOS VERM$ I RANCHO PALOS VENDra, CA <br />Design Engineer. Mr. Hilton was responalbleftir AtIrIPIng slid signing plans for a large <br />no <br />neighborn. od community. The.pro1w.conalsted Of adding how signs and striping Oil <br />the.streft of a neighboftod"min4nity. <br />Brietbi Street Widen Ing from 3rd Street to Olvia Center <br />CO -OF SANTA ANA 1 SANTA ANA, CA <br />Wdooffig <br />plans, 16 n0pape Plans and Irrigation plans for this proJeot, The! Pro Iftoonsista.d of <br />. <br />addifigan additional lahein each direction. Also; a median WasoOnstiructed with <br />a <br />decomposed granite walkway and a dry Westin bed Was constructed In place ofe <br />gutler. <br />Grand Street Widening from Ist to 4th Streat <br />C11YOF SANTA ANA I swrA ANA, CA ' <br />Design Engineer. Mr� Hilton Was responsitile for the design Of the street widening <br />0ana, ifindsoape Plfliris, and irrigation plans, for thli Project Thif PrOlett consisted of <br />adding an additional lane In each direction, Also, a medlan was constructed With a dry <br />atfogirn bed In the middle to allow for runoff. to percolate Into the soil. <br />Memorial Park Walkway, Basketball Courts, and Volleyball Courts <br />Renovation <br />CITYOFSANTAANK 15ANTAANACA <br />Design Engineer. Mr, Hilton was responsible for the design of the walkway, basketball <br />courts, and volleyball courts riedOnStrUOtIon Plans for this projeaL <br />ExPo, Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SAWA MONICA, CA <br />00619" 121`191111180f- Our team Was selected to provide engineering design services. and <br />Mr, Hilton Is responsible for providing the final design ofthe bus stops while satisfying <br />the needs of multiple government agencies, Phase 11 of the, Expo Line is expected to <br />be completed In late 2015and will ex . tend the line to Santa Monica, As a result, Big <br />Blue Bus Is Implementing a comprehensive redesign of its transit system to connect <br />Passengers with the EXPO Line stations In attempt to create a more efficient commute <br />for passengers: these initiatives also Include the If ioluslon of algriage, bus berths <br />and overall pedestrian Improvements. Specifically, our team Is Providing preliminary, <br />schematic and final design, to Include construction documents detailing bus pads, <br />NIV15 ADA-oompliant wheelchair pada� sidewalk extensions and the location of bus stop <br />25E-469 <br />
The URL can be used to link to this page
Your browser does not support the video tag.