Laserfiche WebLink
CONTACT INFO <br />KEVIN SALEN, PEr PMP <br />.949.585.0477 <br />Projopt Engineer <br />EXPERIENCE <br />24aars <br />.......... 1� . ..... ....... .. .. . . ............ — . .......... . . .... ...... . ........ <br />Mr.Saleh has 24 years clexppdonsWosa 0tvil engineer. lils professional, Xp r e <br />e 0 lone <br />Includes Planning, design, construction monagament� wid constructionsupport <br />E15UCAIION <br />services for a Variety of public works projeolls, with speolflo oreasi of . Practice In water <br />B.S.Olvil Engineering <br />and wastewater HIS relevant experience ftioludes; water distAbutlon and treatment <br />iiiant,M)"/procassest roservolist Pressure, <br />Pro gleffinling <br />reducing and surgahollitles', blending kPilltres, dlafinfactlo�,_pnd law_ <br />a4Qwftt0l`P 00tisInoludevorivoyancesys.tems Pumping <br />LICENSES <br />stations, aniftroatmentPlarlt'fi 9 and processes. <br />Civil Epilinser,(JIVID) <br />No. 36159 <br />Pro)ed Monallament, <br />PY0166t Experience <br />Prolesslonal <br />......... .... . ........ . ... ...... . .... . ....... <br />UCI Recycled W_atcrr1In6 <br />AFFILIATION$ <br />IRVINE RANCH WATER DISMICir I IRVINE. CA <br />Mernherof-crigillipers <br />SbnlQr PrOlect Engineer., Mr Sateh, I& currently, provid . Ing the plans, specifications, <br />without bord e UCI <br />slid qathindisis-fOr the design zVw011as PrOV11311119 6110,160119 construction services <br />chapter <br />fbrsipprD)dMataIy5,'?OO'LFofd -inob.zfrid22-ino.holpolineinCallfGmlaAypno <br />'Am erloan MenjonMOL <br />from University Via y and P,aItasorI.QrJvqfrom <br />VOIOT60017Y Lane ard on Academy We <br />Tachnolow *00100on <br />Callfbmia Avenue to tilitO 001iritt6WOrs. 16 additlen, anew , meterf I ng vault will be, <br />frisialled0t tho Intersection 0 Caillibmia-Avenue:arld Academy Way, <br />Downtown Anaheim. ReoYoled Water Expansion petign-Build Project <br />CITY OFANAHEIM 1: AN&HEIM, CA <br />Senlop PrejOrt Engineer, Mr. Saleh was the designer fbi-thIsAiseign-bulld effort In <br />d6n)(Inetion with Arnaz Engineering tot a new Pump and tank system to replace the <br />existing irrigation Pump 80PPIY %letehi. The now system Is designed to store (On-slte) <br />recycled water in generated froth th'O'Wh6F and will irrigate Pearseri'pirk.' The new <br />PUMP and tank system wili conneot to and operate with the existing Irrigation sprinkler <br />and. controller system. <br />S-Inch and S-Inch Water Main Replacement In Westford Street, Ardmore <br />Street and Calla del Norte Street <br />CITY OF ANAHEIM I ANAHEIM, CA <br />S011101' Py0lect Engineer, Mr, Seleh was responsible for the design of abandonment <br />and replacement of existing, aging 4-itch and S-Inch DIP main with now 6-1noh slid <br />8-Inch PVC 6-900 located In Westford, Ardmore and Calla del Norte Streets, Designs <br />also Include the replacement of several service lines, metals, appurtenances, hydrants <br />and valvd$, <br />Oulver Boulevard Area Main Replacement <br />GOL6EN STATE WATER cOMPANY I cuLvER CITY, CA <br />Senior PrOJOCt Engineer. Mr Saleh was responsible for the design of replacement of <br />I <br />existing, aging 4-Inch and 6-Inch cast Iron water main with 8-1r)oh DIP or PVC In Culver <br />Boulevard from Sepulveda Boulevard 16 Overland Avenue and In Wagner Street from <br />NIV15 <br />Sepulveda Boulevard to Coombs Avenue (approximately 7,000 feet). The pro)ent also <br />Includes relocation Of 1-Inch and Zhich services and fraters and abandonment of the <br />existing water mains In the alley east 01'Culver Boulevard and in Wagner Street, <br />25E-470 <br />