CONTAOTINPO
<br />PETER SALGADO, PE
<br />ote Corlftqtlon Man4ge
<br />"th more then 20 years of experience,, Mr, Satodo has managed anddelwrad a,
<br />EXPERIENCE va rJety of"pubile works projam Incl QdIrg street Imorovemnis; vertical construction
<br />20years and tenant Improvements, p4rhapnq laridsoapinig Improvement0i and waftrgewer,
<br />and storm drain fraproveMents. Working with a varfety of Agandies, he' Is thorought
<br />EDUCATION fAM1114twith focal, state, -and federal proceoprep,
<br />13.& Civil Eronebrifig
<br />ILICEWS Project Experlence
<br />Civil Engineer (CA) ... ................. . -.- .............. . ..... ......
<br />No. 63159 STREET IMPROVEMENTS
<br />NIV15
<br />Blellfievver Boulevard Pedestrian Eriftenoomenits
<br />,0FWbr-WLCFLOWER I BELVLOWER, CA
<br />00ndmOtIOU MAR490r. Mr. S81gado managed this $1�21iil street trafficS.1griiiij and
<br />psrl�weyA Iffiprovornonts pn�jeot Jbo e0opect, worj( Ihd(Wed too. dWay reccnstlVctil�n,
<br />'and resuffOOIng, fWh4truation of sidewalks (Inoludingdeograt . 10 pay.160: drivemp,
<br />buft, guttOrai dross.gutters, and ADA curb ramps; Installation ot traiffid slipals,
<br />001`1401teir 66binats, and ffashing beacon; lawd8caft and Irrigation; and traffic shiping
<br />and signage (I nefudirig the Intersectional,
<br />FY20i32014, and FY 2015-2016 Annual Pavement Rehabilitation
<br />dITYOFYOR6AUNDA I YORBALINPA, CA
<br />Mr. Salgadomanaiged this 0.15M cityw1destreet improvement
<br />WgrQrm, SPadficallY, the scope of work -Included reconstruction ofe[daW.alke,
<br />driveways, ourbi gutter, and ADA curb ramps: roadway section repairs and resurfacing;
<br />track goal end slurryseal; andi traffillo stripingand sigAage,
<br />Colrilorate Center Drive. Street Lights Project
<br />CITY Or POMONA I POMONA, CA
<br />Construction Manager. Me, Salgado managed this $250,000 street lights project
<br />that Included the removal and installation of approximately 60 street lights In several
<br />residential areas,
<br />FY 2008 through 2016 Annual CItywids, & Street Improvement Projects
<br />CITY OF SANTA MONICA I SANTA MONICA, CA
<br />Construction Manager. Mr. Salgado provided construction manag6ment,
<br />Inspection, and public outreach for this annual citywida, project Work consisted of
<br />pavement resurfacing of strests And parking lots (Including sl urry seat and crack
<br />seal treatments); full pavement reconstruction; traffic signal modifications; and,
<br />construction of now sidewalks, driveways and ADA ramps, Key services Included all
<br />fAcels of construction Management and Inspection Including: utility and multiple
<br />agency coordination: project budget and a9countt tracking: engineering plan and
<br />specification review; traffic management and control; submittal, schedule, request
<br />for Information (RFI), Pr6grOSs payment review and Processlnjr� field observation;
<br />negotiating and processing change orders; document control; and project cloeeout,
<br />which consisted of warranties, guarantees, recommending notices of completion slid
<br />tht release of retention,'16tal aonstftiotlon cost varied between $1M and $9M.