Laserfiche WebLink
COWACTINFO <br />LUANNE BE^ PR <br />loonoo.bimn@nvS.com <br />940.585.'0477 <br />CorIstructio, Manager <br />... . . ....................... ..... <br />EVERIENOE <br />. ...... 1.1� .......... ...... ........ <br />Me. Bean has morathan Soyeare otoxperiance inthwdesign and Management of <br />waterand wastewater projects, HOrtochfildall skills Inoludestructural analysis and <br />EDUCATION <br />design, mechanical analysis, InStrUmeritation and Control, the Preparation of plans, <br />MS. CIVII EnIginearing <br />spWilloatio% and Cost estimates as well as construction m apagemont, She has <br />field various. positions with mary-public agencies Including the Long Beach Water <br />Dopartmen� Victor Valley WastOwater Recfapiaticii�k6fh6rlty. Indic Water Authority, <br />LICENSF-S <br />Metropolitan Waterfilstrict, and FEMA, Ms. Resn's teClIftleal experience inoludes large <br />CIA1 tinglInser (OA) <br />scale publio works prdlom The Capital Impfovement Prograrrminduding construction <br />"a. SQ129 <br />-qYe.Wg4t,,Pdntractadmi�istrationdocumentoonb*oL ula 0 n <br />Qt1QIItYMrItMI, Structural analysis, and design, <br />FEMA M <br />Propot Experlerfee <br />IfAZ list Rotpohd&l <br />............ . .. . . ... ........ .. .......... .. ........ .... ....... ...... ................ .................. <br />Allay Water Main Conversl6p, Floose IVLqwjs Lemon <br />D& Offtsof Bulk <br />LONG BEACH WATER DEPARTMENT I LONQBWH� C-A <br />AnOJ4qn-6uIk,1jAZMAT: <br />Oanstruction Mifnager/1'"POO40r, Ms. Dean completed full service Construction <br />�&08196?hft <br />P� OROO" <br />snd Iflkifttion SdiVidso.for (he Phase If Alls <br />y Wator Main Oorivereon <br />'on, <br />*0100t. 7140 services Included full time,construction observat M (I at"Ung, <br />J at djai <br />Nuclear Waste Safety <br />h#vIO* of CoAtractorks Progreas,poymants. resciudon of d ealga Issues, shop drawing <br />. <br />f6rWoriors <br />review, RF1 resolution, change orderfrianagerpoht and lagofution, meefing% public <br />notifications and LSWD coordination fo�&hutdcwna toy this p jeotourec <br />to natruction <br />Managoiri6nt team resolved public cornplAftita and problems f6m the local businesses <br />and residence before thoy Necome Problems for City H611 and LOWD. Me; Bean also <br />Checked NPDES end BMP measures, tratfib control, arid sstaiY MOOsvred during <br />consixaction, <br />J. K Johnson Reservoir Facility Valve Replacements and Site <br />Improvements Project <br />LONG 13EACH WATER DEPARTMENT I COMPTOK CA <br />Resident Montag ae. Ms. Hean was responsible for mrseelng <br />this Prolect, which Involved rePI8c;Omdnt of four underground water main valves, <br />Installation of five storm drain Inlets, Construction of a containment cell for an Indoor <br />abov.e-ground chlorine tank, construction of a large concrete rainibroed storage pad, <br />trenching for the Installation Of electrical Conduit and re-pavingbf surface areas to <br />allow for proper drainage. <br />Group 12 CIPP Sewer Rallning Program <br />LONG BEACH wATER DEPARTMENT I LONG BEACH, CA <br />Oonstruction Manager. Ms. Bean was the Construction Manager for the Long Beach <br />Water Department's Group 12 CIPP sewer relining program. This involved providing <br />construction oversight and observation of LBWOs contractor to Install almost 16,000 <br />of,94nah, 10-inch, and 12-Inch curOd4n-place sewer cleanln& pre -lining video, lining, <br />NIV15and post -lining video, Point repairs and manhole rehabilitations were also undertaken. <br />Once the Installation of the CIPP Oegan, Ms. Bean coordinated with the LBWD for <br />shutting off Waterservioes, for the various residents and businesses along the sewer <br />line routes, Once curing was completed, a post lining video was run, followed by ra� <br />Installation of the. laterals and top hat Installation on select laterals; <br />25E-479 <br />