COWACTINFO
<br />LUANNE BE^ PR
<br />loonoo.bimn@nvS.com
<br />940.585.'0477
<br />CorIstructio, Manager
<br />... . . ....................... .....
<br />EVERIENOE
<br />. ...... 1.1� .......... ...... ........
<br />Me. Bean has morathan Soyeare otoxperiance inthwdesign and Management of
<br />waterand wastewater projects, HOrtochfildall skills Inoludestructural analysis and
<br />EDUCATION
<br />design, mechanical analysis, InStrUmeritation and Control, the Preparation of plans,
<br />MS. CIVII EnIginearing
<br />spWilloatio% and Cost estimates as well as construction m apagemont, She has
<br />field various. positions with mary-public agencies Including the Long Beach Water
<br />Dopartmen� Victor Valley WastOwater Recfapiaticii�k6fh6rlty. Indic Water Authority,
<br />LICENSF-S
<br />Metropolitan Waterfilstrict, and FEMA, Ms. Resn's teClIftleal experience inoludes large
<br />CIA1 tinglInser (OA)
<br />scale publio works prdlom The Capital Impfovement Prograrrminduding construction
<br />"a. SQ129
<br />-qYe.Wg4t,,Pdntractadmi�istrationdocumentoonb*oL ula 0 n
<br />Qt1QIItYMrItMI, Structural analysis, and design,
<br />FEMA M
<br />Propot Experlerfee
<br />IfAZ list Rotpohd&l
<br />............ . .. . . ... ........ .. .......... .. ........ .... ....... ...... ................ ..................
<br />Allay Water Main Conversl6p, Floose IVLqwjs Lemon
<br />D& Offtsof Bulk
<br />LONG BEACH WATER DEPARTMENT I LONQBWH� C-A
<br />AnOJ4qn-6uIk,1jAZMAT:
<br />Oanstruction Mifnager/1'"POO40r, Ms. Dean completed full service Construction
<br />�&08196?hft
<br />P� OROO"
<br />snd Iflkifttion SdiVidso.for (he Phase If Alls
<br />y Wator Main Oorivereon
<br />'on,
<br />*0100t. 7140 services Included full time,construction observat M (I at"Ung,
<br />J at djai
<br />Nuclear Waste Safety
<br />h#vIO* of CoAtractorks Progreas,poymants. resciudon of d ealga Issues, shop drawing
<br />.
<br />f6rWoriors
<br />review, RF1 resolution, change orderfrianagerpoht and lagofution, meefing% public
<br />notifications and LSWD coordination fo�&hutdcwna toy this p jeotourec
<br />to natruction
<br />Managoiri6nt team resolved public cornplAftita and problems f6m the local businesses
<br />and residence before thoy Necome Problems for City H611 and LOWD. Me; Bean also
<br />Checked NPDES end BMP measures, tratfib control, arid sstaiY MOOsvred during
<br />consixaction,
<br />J. K Johnson Reservoir Facility Valve Replacements and Site
<br />Improvements Project
<br />LONG 13EACH WATER DEPARTMENT I COMPTOK CA
<br />Resident Montag ae. Ms. Hean was responsible for mrseelng
<br />this Prolect, which Involved rePI8c;Omdnt of four underground water main valves,
<br />Installation of five storm drain Inlets, Construction of a containment cell for an Indoor
<br />abov.e-ground chlorine tank, construction of a large concrete rainibroed storage pad,
<br />trenching for the Installation Of electrical Conduit and re-pavingbf surface areas to
<br />allow for proper drainage.
<br />Group 12 CIPP Sewer Rallning Program
<br />LONG BEACH wATER DEPARTMENT I LONG BEACH, CA
<br />Oonstruction Manager. Ms. Bean was the Construction Manager for the Long Beach
<br />Water Department's Group 12 CIPP sewer relining program. This involved providing
<br />construction oversight and observation of LBWOs contractor to Install almost 16,000
<br />of,94nah, 10-inch, and 12-Inch curOd4n-place sewer cleanln& pre -lining video, lining,
<br />NIV15and post -lining video, Point repairs and manhole rehabilitations were also undertaken.
<br />Once the Installation of the CIPP Oegan, Ms. Bean coordinated with the LBWD for
<br />shutting off Waterservioes, for the various residents and businesses along the sewer
<br />line routes, Once curing was completed, a post lining video was run, followed by ra�
<br />Installation of the. laterals and top hat Installation on select laterals;
<br />25E-479