Laserfiche WebLink
PROJECT UNDERSTANDING <br />WATER RESOURCES (OPTION A) <br />we vn(leraamd'thatft CIVIt $00kingthodesIgnand <br />construction support services for the Santa Ann Water <br />PrejoaL This project Includes the rehabilitation of an <br />existIng water well approximately So years old, and the <br />design of 160"eet of i2-Ifth PVC water main and the <br />construotionof 000-fest of :1,15-inch sewer main on an <br />arterial street. The City would like for the consultant to <br />provide feedback regarding the materlal of choloe, for the <br />sewer main Improvements. Also, the City would like to <br />connect this well to the water system, as of right now it <br />does connect toen existing onsits, reservoir. This well Is <br />a send produoer, end currently th 6 capacity has dropped <br />by approximately 35% of its rrmximurn yield of 2000 GPM. <br />The depth of the well 10 approximately 11,00-10F4 it has <br />a vertical turbine pump with a 2,%Ohp motor. In addition, <br />the soreens are made of Mild steel. No video or any other <br />preventive maintenance has been done In the past 0 <br />years, <br />Well Rellabilitation <br />Our proposed scope of work is divided Into a tw(>Phaao <br />approach. Phase I will Include reconnaissance of the <br />welf.to characterize the current WilditlOh and develop <br />a eehabilitation plan. Phase 11 will be to parfor M- the <br />rehabilitation necessary to restore the well to proper <br />working order. <br />Since the rehabilitated well Is to be connected to <br />the distributl6n,system, NVS's design will Include <br />considerations for the following teluired appurtsihances; <br />• Flow control valve <br />• Pump to. waste system <br />• Chlodnatlon <br />• SCADAeonnection <br />It Is assumed that the well will be to-eqUipped with it <br />new pump, motor, Me. 0, and appurtenances, <br />Water and Sewer Mains <br />Both the water main and sower extensions will be <br />designed according to Cilystandards. NV5 would typically <br />specify high -strength VCP for the proposed 16-Inch sewer. <br />PROJECT UNDERSTANDING <br />GENERAL ENGINEERING (OPTION B) <br />We understand that the City Is seeking the design and <br />construction support services for the Mile One Street <br />Project. This project will follow a complete street concept. <br />The length of the project Is approximately 1,000 linear <br />feet. Both Intersections at the outer limits of the project <br />have been modified as part of the complete street project <br />under previous phase. The proposed project consists of <br />street rehobilitation, bicycle lane, sidewalk, and parkway <br />Improvements. The sidewalks ore 6 fast wide. and th . a <br />parkways are 4 feet w1de. Thape0joet also Includes <br />widening of the east side of the street to accommodate <br />a now bicycle lane, The right of way 15 approximately 12 <br />fealwlds with three traffic lann In each,dirpotion with a <br />14 foot wid a Median, The required right of way her, been <br />aovlred by the City. <br />GENERAL APPROACH <br />Work Breakdown Structure <br />Upon issuance of P notice to proceed, our project manager <br />will Meet With team members to review the requirements, <br />prepare a Work Breakdown Structure and make team <br />assignments for maximum efficiency of resources. The <br />detailed WSS Will describe all of the work tasks necessary <br />'to complete the project. A mastat project schedule will <br />be prepared following the WBS to.show the relationship <br />between tasks, the expected start date and duration <br />for each Item. This schedule will serve as a guide to <br />conducting and monitoring the progress of the work and <br />to ensure projects ore completed on time and within <br />budget. To ensure accurate monitoring and tracking of <br />documents, nevisions and progress, a document tracking <br />and control system will be developed. We will meet <br />with City project representatives regularly end maintain <br />constant communication to ensure successful and timely <br />delivery of the ptoject. Meeting minutes will be distributed <br />within one week of the mesting Identifying actions, Items, <br />assignments and due dates, <br />Cost Control <br />We are able to continually review and evaluate a, projeors <br />cost through all Project phases to enablo Informed and <br />25E-503 <br />