My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
addition, the plans will Include the sidewalk and parkway <br />Improvements. *Me bike lane, signing and striping plans <br />Will be Prepared at a I" = 41Y scale. The" designs will <br />be supplemented by our flold review of the project area <br />to visually confirm and same the Project condition and <br />Identify specific Improvements to be included in the <br />Project. These plans Will then be used to evaluate the cost <br />of the proJeM and ascertain the Impact on the adjacent <br />Property Owners Other Private Improvements. <br />G. MEETINGS/SCHEDULES <br />We Will be available to attend team meetings, City Counall <br />m "finge and any other meetings with L$tqff, agencies, and <br />the pmbllo as Tequirad,,Uillizing Microsoft Software project, <br />we will maintain uPd1aW Project design schedules for use <br />by the cityst;pIf. <br />Final Design: Plans, Specifications <br />and Estirnates <br />This task Involves the completion of construction <br />documents In the fbrm of final PS&E. <br />A. FINAL IMPROVEMENT PLANS <br />Upon Cilyapproval of the Preliminary. design, wowill <br />Proceed with the Preparation of final design plans,, <br />specifications and cost esti, mate for submittal to the city <br />at the preliminary and final completion levels process,.All <br />Plans, reports, and documents milli be submitted In the <br />format acceptable to the city. <br />The plans, will be prepared to conform to th6 general <br />requirements Of the City with consideration for the needs <br />Of the contractor's construction operations. We will <br />deliver completed and approved construction drawings <br />on or ahead of.approved schedules, Ail designs shall <br />be prepared and submitted In a manner that ensures a <br />complete design approved by the City. Where applicable, <br />the construction drawingswill oonform to.the appropriate <br />qpplioeble standards such as City, county, state standard <br />plans and specifications, APWA Standard Speofficationafqr <br />Public WOrks Construction 461reenbook" and Manual of <br />Traffic Uniform Control bevicea. <br />The following draWIngg will be Prepared for the project and <br />will be part of the plan set: <br />o Title Sheet <br />4 Detail Sheet <br />Street Widening and Rehabilitation Plans & Profiles <br />Sidewalk and Parkway Improvelnent plans <br />Bike Lane, SIgning and Striping Plans <br />B. SPECIFICATIONS <br />WO Will Prepare complete PrOjed specifications, hioluding <br />$001al Provislons.thatapecifies troffw control, construction <br />nofification and posting Information per CdYs format and <br />direction. Copies of the Standard General Provisions and <br />Construction Contfoot Agreement shall be supplied by the <br />City to Incorporate Into the construction documents, <br />C. QUANTITY AND COST ESTIMATES <br />We Will provide complete construction quantity and.�ccst <br />sometas for the project. Wmotaa W . III be Provided <br />at preliminary arid final COMP10tion submittals, and a <br />final estimate with the final $UbyWttAl. Emel files will be <br />sularnitted Witheeah submittal, Quafttitles will match the <br />Bid Proposal final quantities. <br />Bidding and Construction Services <br />We will provide support services during Wristruction, <br />A. BIDDING SERVICES <br />Once the plans are approved and advertisedwe will assist <br />CIV staff with bid/sward activities, Including responding <br />to bidder questions, We Will be available to attend Prebld <br />FrO0tIr1gs and Other meetings with staff as required. We <br />will also 09 available to clarify design -related Issues stall <br />times, <br />B. CONSTRUCTION SERVICES <br />We will be available to attend PWOOnstinuction meetings <br />and other meefl%s With Staff, agencies, and the public; <br />08 required, We will provide responses to Requests for <br />Information, We will attend any required site Meetings and <br />we will,incorpotste all redllne comments prepared bythe <br />Contractor and Project Inspector and provide the as -built <br />plans, <br />25E-517 <br />
The URL can be used to link to this page
Your browser does not support the video tag.