My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO <br />davId.nIknsfs*nvScom DAVID NIKNAFS, Pe <br />949.58MD477 Project Manager <br />EXPERIENCE <br />so yactia <br />EDUCATION <br />MS. Civil Engineering <br />B.S. C <br />� . . Ivil Engineering <br />LICENSES <br />Civil Engineer (CA) <br />No. 42697 <br />AFFILIATIONS <br />Amorloan Public'Works <br />Association (APWA) <br />American Society of Civil <br />Englnears (ASCE) <br />TransportatIon & <br />Development Institute <br />Mr. Nlknafs has moralhan 30 years of civil engineering aq*rleme In the public <br />and private sectors working on various capital Improvement ptcjecta and has <br />OxteftivO 09peftece Working as a project manager and senior anglofter. 1-14 has <br />managed numerous publIo works and development PrPISOPS Including roadways, <br />bridges, drainage, saw% water undOrg found utilities, building facilities and related <br />Infrastructure ImprOverneort.projects, <br />He Is in charge of providing overall project direction to the ptjoattachnical team <br />mid providing resource allocation: preparing and admirilstering budgets, preparing <br />end monitoring projeat schedules: mansging production of prellminarydesIgn <br />and final deslgrr proparing.varlous detailed technical reports,, providing oversight <br />and performing quality control, nianagingand monitoring oonstruntiori activities, <br />0614biloing, coordinatirig and maintaining working relationships with owners, <br />developers, Ohd.other agencies. <br />Project Experlorice <br />—1 ....... 11 .... V� ....... ...... ..... . ..... .. ... ......... ........... 1. . ........ "-- .......... . . ..... . ..... -w-� ......... <br />'H*.%roet Widening Project <br />UTY OF SAN 13ERNARDINO I SAN BERNARDINO, CA <br />Project Marrager. Me, NUMIS is responsible for providing professional deal&, <br />engineering services including Plans, specifications, cost estimates and related bid <br />documents foe the Widening of OW Street from Kendall brive to 40thr Street; The <br />project will Increase H $tftOt from two lanes to four lanes and upgrade the existing <br />traffic 8191nals at 40th Street and Kendall Drive. The plans will froluda roadway, <br />drainage, sewer, signing and striping, street lighting, modification W traffic signals, and <br />d�rlbllklcin plans, We are coordinating wlth.uUllty companies, Identifying existing ftht- <br />of-way, conducting pavement investigation and preparing a rep6rt, and preparing all <br />required environmental studies and documents for clearance under 0EQA. The street <br />Improvements will Include ADA�oompllant curb ramps. <br />Pacific l3bast Highway Arterial Improvements <br />CITY OF REDONDO BEACH I REDONDO BEACH, CA <br />Project Manager. Mr. Nlknsla Is managing a comprehensive traffic analysis and <br />the preparation of preliminary design recommendations to reduce congestion <br />and Increase safety oft Pacific Coast Highway. Our team Is preparing final plans, <br />specifications and cast estimates for the Intersection wideninglar a right-turn.only lane <br />on southbound Pacific Coast Highway and Torrance Boulevard, We Will also provide <br />design and support services durtng bidding and construction phases. <br />Jamboree Road and Intersection Widening <br />CITY OF IRVINE I IRVINE, CA <br />N I V Project Manager/Contract Manager, Mr. 1111nafe Is responsible for providing program <br />and contract management service$ foe the Widening of Jamboree Road from Main <br />Street to Sarranqs Parkway, The project will widen Jamboree Road from four to five <br />through lanes In each direction. intersection improvements at jamboree/Main and <br />Jamboree/Sarranca are currently In the design and tight of way phases and will be <br />constructed along with the widening, Mr. Niknafe is also responsible for coordination and <br />15 monitoring required for all phases of work, <br />25E-524 <br />
The URL can be used to link to this page
Your browser does not support the video tag.