Laserfiche WebLink
Harbor Boulevard Street, Median and Landscape Improvements <br />CITY OF COSTA MESA I COSTA MESA, CA <br />Project ManagerMr. Nilmats managed the preparation of plans, cost estimates forthe design of <br />Improvements on fiarbor BOU10081d, Including street and Median landscaping Impruvaments. F <br />TheCitywas-swarded ederal <br />Highway Safely IMPromftnt Prograrn funds to Install Medians, landscaping, and assocleted Improvements to impreve, <br />Pedestrian and traffic balety. A trafft analysis was conducted to establish Median openings and turn Pocket lone lengths. <br />Our team coordinated with stakeholders Including the residents and busln6sa ownets. and public outreach community <br />meetings were scheduled so the conceptual plans could be presented to the community. <br />East i9th Street Design Improvements <br />Oily OF 009TA MESA I COSTA MEk CA <br />Project Manager. Mr, NlkWa was responsible for tile design Of this roadway, Median and parkway landscaping <br />ImPrwelrOrrts Project ThO project Ingluded the removal of reconstruction of Pavement, and'reconstrucupri of curb, gutter, <br />cross gutter, sidewalli, whoolcho)r ramp and.drivoway, His responsibilities Included mAnAglng the Preparation of the Plans, <br />sPealfivatiOneand cost estimates; andaselsting the City with the preparation of PES and 6-70 certification, as wall as wlth <br />the submittal and processing through Ostbans, <br />Wilmington Avenue Pedestrian and Bicycle Improvements <br />My OF COMPTON 1 COMPTON, CA <br />PrOjeOt Managen Mr. 141knafis was responsible for proviclin9profirissional design enginaeriqliservIcas including plat <br />SPS0111040006, cost estimates and related bid documents for the Wilmington Avenue Set *eats PedWrIgn/Sicycle <br />Improvement Project. The Project Included Pavement rahablItiation on Wilmingion'Avenue from El s mra <br />q elpUnrio Bout rd to <br />RosebransAVentre.,$00pe of work consisted of various pedestrian and bicycle Iftstallation.d wider and <br />colored. crosswalks; countdown pedestrian signals: enhanced pectestria I n lighting,, the Installation of Class 11 bike lanes with <br />wayfindingsignage and Class I bike paths, and the installation of four eolar-OWered speed feedback signs for speed control <br />and attainment. <br />FY 2017-18 Annual Street Rehabilitation <br />CITY OF VILLA PARK VILLA PARK, CA <br />Project Manager. Mr. Nilulats Is responsible for provi * dingplans, specifications, and estim4toslor the annual rehabilitation <br />Project The Improvements may Include the removalend replacement of daterforat one 0 a streets by repaving <br />.ad secti fth <br />orslurrysealthe streets; construction of curb and gutterorAC burmat certain locations oftheseetreets; and the <br />replacement of curb and gutters as needed to provide adecloate drainage, <br />Colonial Avenue Alley Pavement Project <br />CITY OF CULVER C4TY I CULVER CITY, CA <br />Project Manager. Mr. Nlknaft Is responsible for providing Professional design services for the Colonial Avenue Alleywa—y As <br />Part of tile Community Development Block Grant (CD13G) Program, tile Colonial Avenue Alleyway Peving PmJed Includes the <br />Paving of approximately 800 LF by 20 feet wide of the alleyway. The scope of work stop Involves field review, topographic <br />survey, design plans, bid schedule end technical specifications, quantity and cost ostlinates. <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SAWA MON16A, CA <br />Project Manager. Our team was selected to provide engineering design services for the ExPo Line Bus Stop Enhancement <br />Project In Santa Monica, Phase It of the Expo Line extends the line to Santa Monica. As a result, Big Blue Bus is <br />imPlemeAtIng a comprehensive redesign of Its transit system to connect Passengers with the. Expo Line stations In <br />attempt to mate a more efficient commute for passengers. These initiatives also Include the Inclusion of signage, bus <br />berths and overall. pedestrian Improvements. Our team Is providing Preliminary, schematic and final design to include <br />construction documents detalling bus pads, ADA-compliant wheelchair pads, sidewalk extensions and the location of bus <br />stops. The work consisted of coordination with various Pgenclos and utility orilanizatlons. <br />25E-525 <br />