My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACt INFO <br />kYIe.hIIton*nv6.00rn <br />949.686.0477 <br />EXPERIENCE <br />years <br />EDUCATION <br />B.S. Civil & Environmental <br />Engineering <br />LICENSP/CEIRTIFICATES <br />CM! Engfnear4n-Ulning <br />KYLE HILTON, EIT <br />Project EnSineer <br />... I ............. . .. ... ".- .......... . ........ ............. ........ .......... . ............... ........... <br />Mr Hlton has more than six Yeats of experience In publio-works Improvements, <br />Includingplannirig and de.silift of street$, artorialstreets, right-of-wayeriginearing, and, <br />storm dtoln design. His professional experience also ItiCludes CAD drafting, bridge <br />mitift Waiter Quality Management Plans (WQMP), Environmental Impac, t Reports (EIR), <br />and Storm Water Pollution Prevention Plans (SWPPP). HO also has also served various <br />roles fbr staff augmentation assigntrients. <br />Project Experience <br />..... ............ .... ........ ... ......... .... .......... .......... ......... . ..... .. <br />Rancho Palos Verdes Area 9 Now Striping and Signing <br />CITY OF RANCHO PALOS VERDES I RANCHO PALOS VERDES, CA <br />Dosignfaiginoer. Mr. Hilton was responsible for striping andailghing plans for a. large <br />neighborhood community, The project co <br />nsIsted crackling how signs and abiping on <br />the streets of a neighborhood corn hiluntly! <br />Bristol Street Widening from 3ro Street to civic ceptneir <br />CITY OF SANTA ANA I SANTA ANA, CA <br />DOMgmgugl"eDfMr.Hiltdtt*Asr.psOonsible.forthe.dWpofihestre witioning- <br />at <br />Plot*, landscape plans And Irrigation plans ficrthis project, The Project consisted of <br />addifigan additional lsna�n each direction. Also, a median was constnucted with a <br />deco-mPosed granite walkway and a dry stream No Wes constructed in place ofa <br />gutter, <br />Grand Street Widening from 1et to 4th Street� <br />CITYOF SANTA ANA I SANTA ANA, CA <br />Design Engineer. Mr; Hilton was responsible forthe design of the street widening <br />plans, landscape Plains and Irrigation Plans for this projecL The pitijact consisted of <br />adding an additional lone in each direction, Also, a median was Qonstr , ucted with a dry <br />stream bed In the middle to allow for runoff to Percolate Into the sell. <br />Memorial Park Walkway, Basketball Courts, and Volleyball Courts <br />Renovation <br />CITY OF SANTA ANA I SANTAANA, CA <br />Design Eng!"08r. Mr, Hilton was regOori�lblo forthe design of the walkway, basketball <br />courts, and volleyball courts reconstruction plans for this project, <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Design Engineer. Our team was selected to Provide engineering design $e"!Oes. and <br />Mr. Hilton Is responsible for providing the final design of the bus stops while satisfying <br />the needs of multiple government Agencies. Phase 11 of the Expo Line Is expected to <br />te COMPILted In late 2015 and will extend the line 10 Santa Monlea. As a result Big <br />Blue Bus Is Implementing a comprehensive redesign Of Its trOnalt system to connect <br />Passengers With the Expo Line stations in attempt to create a More effiolgrit com u <br />for passengers; these Initiatives also Include the Inclusion of signage, bus berths M to <br />and overall pedestrian Improvements. SoacIfically, our team Is providing preliminary, <br />soliernatio and final design, to Include construction documents detailing bus pads, <br />ADA-compliant wheelchair pads, sidewalk extensions and the location of bus stop <br />25E-531 <br />
The URL can be used to link to this page
Your browser does not support the video tag.