My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTAcTINFO <br />STEVE SO"APEL <br />Project Engineer <br />........... -1 .......... . . ..... ...... ........ <br />PERIM% <br />1 . ............. . .............. -- .... . .......... I .......... .......... ..... .... <br />Mr. Sofiapel has more them 26 years of civil engineering experience In Southern <br />California. He Is an experienced manager who has been responsible for the successful <br />EPUCAJION <br />Eno - nearing courses <br />completion OfenVironmentallyond pollUrAllysonaltivaclasilin ImKo menipmlects6HIS <br />ve <br />experience Inoludes serving as the project manager and project engineer responsible for <br />preparing project studies and r000mMohdatlons, plans a nd specifications, and -support <br />during construction. <br />Project Experience <br />....................... " ........... . . . ...... ....... ...... .. . ...... ........ ...... ...... . . .. . .. . ................ <br />Baker Street Rehabilitation I City of Costa Mesa <br />Mr. SQhapel was responsible for preparation of plans, spisofflostjons arid estimates for <br />the Baker Street Rehabilitation from 84djA Street to near Sbed. The jamlect consisted <br />of ap proMmately 14,0,0,LF of pavement rehabilitation, reconstruction of damagiod curb <br />and gutter, sidewalk, and c(rtvokay, construction of ADA compliantourb ramps, and 611 <br />appurtenant Work. <br />Central Avenue Street Reconstruction I City of Chino <br />Mr. Schapol was responsible for preparation. of plans, specifications and estimates <br />for UN LF of pavement reconstruction. Improvements JhOuded. WWI pavement <br />reconstruction, redesign of eyJsttng cirp.96 sections as needed to Improve drainage find <br />driveabillity, and rel5alf of damaged sections of the asphalt <br />Alley Pavement Rehabilitation Projects I City of Costa Mass <br />Mr. $chapel was responsible for overseeing the preparation of plans, specifications <br />An ' d estimates for the total reconstruction or pavement rehabilitation ol"11 alleys. Work <br />included soil testing,, structural section design; field survbyIng: replacemarrt of, alley <br />entrance, damaged curb and gutters, cross gutters mid spandrels, sidewalKs, driveway <br />and approaches, turf and ird,gation; Wheel chair romp (WOR) designs meeting ADA <br />requirements; planting and trimming trees; determining right-of-w ;andprovidng <br />ay I <br />traffic control and striping plans. <br />Temescal Canyon Road Rehabilitation I County of Riverside <br />Mr. Schapal was responsible for preparation of plans, specilloAtIons and estimates <br />for 2,000 LF of pavement rehabilitation. Improvements inducledgrind and asphalt <br />overlay, redesign Of existing cross sections as needed to Improve drainage and <br />drIveability, repair of damaged sections of the asphalt, and reconstruction of concrete <br />Improvements (sidewalk, curb and gutter), <br />Industrial Way Water Quality and Storm Drain Improvements I City of <br />Costa Mesa <br />Mr. Schopel was responsible for the preparation of plane, specifications, and estimates <br />forthe design of the Industrial WayWater Quality and Storm Drain IMProvements with <br />the objectiveto eliminate the floodingand current water quality problems caused <br />by the deficiencies within the existing storin drain system. The project consist$ of <br />V 15 <br />Installingan underground detention/infiltration facility within an open gross field <br />located south of theAnahelm Avenue and 19th Street Interseotion. The project <br />Included a hydraulic analysis of the -entire storm drain system. <br />25E-530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.