Laserfiche WebLink
CONTA I OT . IN . PO <br />gull aulpq.9,h4Qnov5,oam <br />868.$ <br />M4. Civilinginearino <br />nice <br />in rI6 a . n . d <br />6. n e <br />6h - E h gir W% CA <br />ffits <br />GUILLAUME GAU, PEt GE <br />Geoteplinical Engineer <br />...... — ........... ...... i ......... ... z . ............ . ...... .... ... .. . ........ ............ <br />Mr- GauS 6)(Ped(WOO Includes roadWaysi electric end gaefln6s, water pipelines, <br />residential, commercial, schools, transportation, rall, landslide MMedlation and <br />f0rensk* Prdflft -lie also provides, Veld arIgInecting services and laboratory <br />supervision for the testing and Inspection for concrete, structural st.eel, Masonry, sells, <br />asphalt and civil construction, <br />Project Experience <br />. . ......... <br />.......... .. .. . ..................... ..... ......... ... ... . .......... <br />On -Call Materials Testing and Inspection Services <br />CITY OF VISALIA I VISALIA, CA <br />Q60technical Engineer for annual on -call construction materials testmoserviCeS far <br />various InhOW110ture lonPrOvemenot Prolectsoomprising geatechnIcal and Material <br />tasting, overlay and resurfacing (Cape Seq) &, Reclamits) projects, 0- Iftleg projects, <br />Independent Assurance services for federally funded proji0is, pavement evaluation <br />services. and concrete structures. Materials testing servIces covered soils, concrete, <br />HMA, Cape S641% warAfte, and miscellaheous testing services, <br />Melrose Drive Extension and Improvehients <br />CITY OF OCEANSIDE I WrZANSIDE, CA <br />Go aotoohnical Engineer forthe design and construction of the fterlb1pri Including <br />grading recommendations, pavement, culvert pipeline and stioring design. <br />State Route 178 Widening Project <br />cALTRANs I sTATc OF CALIFORNIA <br />Geotechnical Engineer for told and laboratory Materials tester, plant Inspector and <br />source inspection services for the wideril ng of SRA76, The project included grading <br />observation. field densotesting, as'phalttebting and plant inspection arid source <br />Inspection of 112,000 CY roadway excavation and fill Placement, 62,000 CY of <br />aggregate base and subbase and 83,000 ton HMA <br />01000 Installation along Highway 79 <br />SAN DIEGO GAS & ELECrR[C <br />Gootoohnical' Engineer for the installation of 7 Miles of underground 39kv line to bring <br />power to the now Jamul cosine. Work Included excavation monitoring and placement of <br />structural backfill, aggregate base and subbase and HMA along Highway 79, <br />Various Projects <br />$AN DIEGO W & ELECTRIC I SAN DIEGO COUNTY <br />Geotechnical Engineer for multiple projects Including underground transmission lines, <br />drilled plar foundation and gas line relocation. Key geological/ilactechnical issues <br />Included deep foundations, rIppability studies, seismic refraction O.Urveys, horizontal <br />directional drilling, Jack and bore. retaining walls and sharing. <br />Black Canyon Road <br />SAN DIEGO COuNTY, CA <br />Senfor Engineer and Project Manager responsible for the gootechnical investigation end <br />design of 9 section of madway between the San Monte Reservoir and ad(facent Indian <br />Reservation. Key geotachn(call issues included sl00a stalhlfitv rtv,.k rinnnhilifu m�W.� <br />25E-535 <br />