My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />COW= IWO <br />KEVIN McHUGH, Jr., FPL.S <br />90.686.0477 <br />SurveYing Project Manager <br />... <br />. ......... ... ..... ...... ........... . <br />Mr, McHugh Is a 11ceriSed laind surveyor with more than 35 Years of experience. Kevin <br />a 5 years <br />manages Nve's aurveymg operations In our southern W[fiernia Region. As survey manager, <br />. <br />EPUCATION <br />hs SuPel"ASOR Oil SurvOYIng slid Mopping Operations. This role Includes oversight of told <br />AA Wthe moos <br />. nL <br />surveysconstruotionstaki field orewsupervislon, field and serial topogmphlesurvia�%, <br />1 <br />the Preparation and quality control ottimil maps, record of surveys, legal descriptions, <br />right of way MOPS, appraisal maps, boundary survays end analysis, ALIA surveys, lot One <br />PT66sionall land Surveyor' <br />aQuirtMeAts, constraint MOPS, condominium plans, a nd corner records. <br />(JA 463, <br />Project 5xilharlence <br />...... . .... ... . ...... .... . ...... ....... .... ... <br />SR-26i and SR-241 - Eastern Transportation Corridor I Caltrarts <br />Kevin provideq pit boundary OnAlYSIS and rlfilhWway CADD pr*ol: coordination for <br />this 24-mile ttanaportaitidn corridor project in Oranie Couhty� His misponalbilltles <br />Included 914 PONS1011 and approval and preparation of More than 600 legal <br />descriptions and exhibitsfor right-of-Watquiettlon. He supervised preparation of all <br />Appraisal map, right-of-way,maps, haccro of surveys, survorcontrof maps, horizorital- <br />control calculations, and CADD-fild managemenit. IWn served as the project manager <br />for riglitof way tor this cha.110rigirorciient which covered the full spectrum of r1gW <br />of -way mapping arallonotneeringetements. Under his direction the right of way <br />rhe pping Win evaluated title report restrictions and prepared project Constraint <br />MapW developed Property Wriders containing all IrOrmationand legal data Lead to <br />for appraisals andsubsequent: paW aNulsifions; prepared legal descriptions and <br />exhibits for various types of property rights acquisition Including fee acquisitions, <br />slope, drainage, roAdvAyend utility easements, temporary corstruct(ph easements, <br />and Joint Use Agreements and Consent to CoMmicir Use Agreements for more then <br />504111yfacilftles. <br />1-5/1-40.15 and Bake Parkway Interchange I Caltrans <br />As land surveyor -In -charge for this projecL KaWn's duties covered denshication of <br />horizontal and vertical control, de§lgri surveys, serial mapping, righto-way base <br />Mapping and survey control maps for three miles of design or oes sections. His work on <br />the project Included preparation of legal description and plate for rI9hWf-wby takes, <br />and preparation of appraisal maps and dot-of-waymap-9. <br />Foothill Transportation Corridor - 0so, Segment I Caltrans <br />Provided all boundary analysis and right of way GADD project coordination for the <br />five mile segment of the Foothill Transportalkin Corridor project Responsibilities <br />included supervision and OPOroval of preparation of more then 35 legal descriptions <br />and exhibb for right of way acquisition as well as eupervision of preparation of all <br />appraisal maps, right of way maps, records of surveys, survey control maps, horizontal <br />ooritrol calculations, and CADD file management. <br />Newhops Street Expansion I Caltrans <br />Surveyor In charge responsible forcomPletingthe boundary survey and analysis to <br />determine the existing street right of way, Caltrans right of way, and prlvath ownership <br />boundaries, as wall 6S the Preparation and oversight of all legal descriptions and <br />exhibits required for the City of Fountain Vallay1c, acquire Me additional necessary <br />N V 5 right of wav for the oroleat. <br />25E-536 <br />
The URL can be used to link to this page
Your browser does not support the video tag.