Laserfiche WebLink
CONITACI`00 <br />PETER SALGADO, PE <br />PetensalgadoOnvS.Oun <br />construction Manager <br />.. . .... . ... ..... ....... . ... ................ . ... —, ... ..... ... .... -.1 ..... <br />With more then 20 years of experionoe, Mr. Salgado has managed and delivered a <br />EXPERIENCE <br />variety of public works, projects Including strapt improvements, vertical construction <br />20yeam <br />and tenant ImProvkmonts; parks and landscaping linproverflents, and water, power, <br />EDUCATION <br />and storm drain Improvements. Working With a varlety of agencies, he Is thoroughly <br />B.S. Civil En&ineedng <br />familiar with local, state, and federal procedures. <br />LICENSES <br />Civil Engineer (CA) <br />Project Experlence <br />No. 6=9 <br />......... 11 ........................ ........ . ... ....... <br />STREU IMPROVEMENTS <br />BellfidWer Boulevard Pedestrian 6nhanooment# <br />CITY OF BELLFLOWM I SELLIFLOWER, CA <br />COnstnIC00" Ma"490r. Mr. Salgado managed this U2M street traffic signal and <br />PS&N48 IMP"PrOntS P1100% The scope of work Included roadway reconstruction <br />and resurfacliV, r0bohstruotion.of sidewalks (includingdecerative P4v!bg); drive"%, <br />clubs, gutters, cross gUtters, and ADA curb rampw installation oftraffic, signals, <br />controller cabinets, and flashing beawn; landscaping and Irrigation; and tramo striping <br />and sIgnage finaludlng4ec6rstiv6 clos $walkest the Intersectional. <br />NIV15 <br />FY 2013-2014, and FY 201"016 Annual Pavement Rehabilitation <br />017YOFYORSA LINDA I YORSA LINDA, CA <br />C005tructl6a Manager. Mt. 661pdo managed this $2,5MI citywide street improven, nt <br />6 <br />program. Specifically, the Scope of work Included reconstruction of sidewalks, <br />driveways., curb, gutter, and ADA curb ramps, roadwayeaction repairs and resurfaoint, <br />crack deal and slurry seal; and, trafflo striping and signage, <br />Corporate Center Drive Street Lights Project <br />CI'rYOFPOMONXJP0MbNA,dA � : <br />co"Itmation Manager. Mr, Salgado managed this $250,000 street lights project <br />that Included the remov@1 and Installation of appradmately 50 street fight$ In several <br />residential areas. <br />FY 2DO8 through 9016 Annual Citywide & Street Improvement projects <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Construction Ma"ager. Mr, Salgado Provided construction management, <br />Inspection, and publio.outreach for this annual cKywida project, Work consisted of <br />Pavement resurfacing of streets and parking lots (including slurry seal and crack <br />seal treatments); full pavementr000nstruction: trofflo signal modifications; and <br />construction of new sidewalks, driveways and ADA ramps. Key services Included all <br />foosts Of 00natructiOn management and inspection including. Utility and multiple <br />agency coordination; project budget and accounts backing; engineering Plan and <br />speolfloatton review., traffic 111Ahagern6rit and control, submittal, schedule, request <br />for Infonration (RPI), progress payment review and processing field observation; <br />negotiating andprocessing change orders; document control; and project closeout, <br />Which consisted of warranties, guarantees, recommending notloes of completion and <br />the release of retention. Total construction cost varied between $1M and $3M. <br />25E-540 <br />