Laserfiche WebLink
CONTACT INM LUANNE BEAN, PE <br />loannef baanftvt�com <br />Construction Manager <br />W.596.0477 <br />EXPERIENCE <br />30yeahs <br />EDucAnON <br />M,& Civil Engineering <br />U, Civil Engineering <br />LICENSES <br />Civil trionper(CAj <br />No. <br />Rwiswnow <br />FEMAOPSA. <br />HAZMAT Flrst Rooppridee/ <br />Qperstions Level <br />DOtOffeirs ' of Bulk <br />and Non-gulkl[AZMAT, <br />Packages <br />Nuclear Waste Safely, <br />fdrWorked; <br />Ms. Bean has more than 30years ofo;perienca In the design arid management of <br />water and wastewater projects, Her technical skills Include structural analysis and <br />design, mechanical analysis, Instrumentation and control, the preparation of plans, <br />scocifficatims. and cost estimates as well as construction menagameM She has <br />held various positions with many public agencies Includingthe. Long Beach Water <br />Department Victor Valley Wastewater Reclamation Authority, Indio Water Authority, <br />Metropolitan Water District, and FEMA. Ms. 00all's technical experience Includes large <br />80810 public works P11000% fdf capital Improvement programs including conatruotion <br />Oversight, contract admin Istration, document control, cost and schadtilo w*ol, <br />4041ity control, structural analysis, and design. <br />Project Experience <br />Alley Water Main Conversilon, Phase IVLOWIS & Lenton <br />LONG BEACH WATER DEPARTMENT I LONGAEACH, CA <br />0911111tirOcIlOn MOnAgs0rulpeft0r, Me, Bean completed full service Construction <br />Management and Inspection Services fbr the Phase 11 Ahoy V4tar Main 0onvarsion <br />PMJect'rle services Included full time construction observation, materials testing <br />review of Contractor's progress payments, resolution of design lssuas6 shop drawing <br />Mvie% RFI resolution, change order management and resolution, mesillnge, public <br />notifications and LEIWD coordination for shutdowns for Mls Project Our Construction <br />Meftgerni!Mt WOM resolved public complaints and problems from *a local businesses <br />and residence before they become problems fcr City Hall and LOWD, Me. Sigel also <br />checked NPIDES and BMP measures, tratric control, and safety rriftesured during <br />construction. <br />J. W. Johnson Reservoir Facility Valve Replacements and Site <br />Improvements Project <br />LONG BEACH WATER DEPARTMENT I COMPTON, CA <br />RWM&nt Eng'""Vermstreallo" M4118901r, Ms- Real Was responsible for overseeing <br />this project, which Involved replacement of four underground water main valves, <br />Installation Of fiv0storrh drain Inlets, construction of a containment cell I for an Indoor <br />above -ground chlorine tank, construction of a large concrete reinforued storage pad, <br />trenching for the Installation of electrical conduit, and re-priving of surface areas to <br />allow for proper drainage. <br />Group 12 CIPP Sewer Relining Program <br />LONG BEACH WATER DEPARTMENT I LONG BEAGHj.CA <br />Construcition Manager. Ms, Bean was the Construotion Manager for the Long Bepell <br />Water Departments Group 12 CIPP sewer relining Program. This Involved,providing <br />construction oversight and observation of LOWD's contractor to Inistall almost 15,OCo <br />018-11"01, ID-fnrih, old 12-1no, curad,InOace SOWer' cleaning, Pre-linin videa,finIng <br />and pM-Ilning vi <br />dOo. Point repalis and manhole rehabilitations were also undertaken, <br />Once the Installation of the CIPP began, Ms. Soon coordinatedwIth the kBWD for <br />shutting off water services for the various residents and businesses along the sewer <br />line routes. Once curIng was completed, a post lining Video was run, followed by re - <br />Installation of the laterals and top hat Installation on select laterals, <br />25E-541 <br />