|
CONTACT INM LUANNE BEAN, PE
<br />loannef baanftvt�com
<br />Construction Manager
<br />W.596.0477
<br />EXPERIENCE
<br />30yeahs
<br />EDucAnON
<br />M,& Civil Engineering
<br />U, Civil Engineering
<br />LICENSES
<br />Civil trionper(CAj
<br />No.
<br />Rwiswnow
<br />FEMAOPSA.
<br />HAZMAT Flrst Rooppridee/
<br />Qperstions Level
<br />DOtOffeirs ' of Bulk
<br />and Non-gulkl[AZMAT,
<br />Packages
<br />Nuclear Waste Safely,
<br />fdrWorked;
<br />Ms. Bean has more than 30years ofo;perienca In the design arid management of
<br />water and wastewater projects, Her technical skills Include structural analysis and
<br />design, mechanical analysis, Instrumentation and control, the preparation of plans,
<br />scocifficatims. and cost estimates as well as construction menagameM She has
<br />held various positions with many public agencies Includingthe. Long Beach Water
<br />Department Victor Valley Wastewater Reclamation Authority, Indio Water Authority,
<br />Metropolitan Water District, and FEMA. Ms. 00all's technical experience Includes large
<br />80810 public works P11000% fdf capital Improvement programs including conatruotion
<br />Oversight, contract admin Istration, document control, cost and schadtilo w*ol,
<br />4041ity control, structural analysis, and design.
<br />Project Experience
<br />Alley Water Main Conversilon, Phase IVLOWIS & Lenton
<br />LONG BEACH WATER DEPARTMENT I LONGAEACH, CA
<br />0911111tirOcIlOn MOnAgs0rulpeft0r, Me, Bean completed full service Construction
<br />Management and Inspection Services fbr the Phase 11 Ahoy V4tar Main 0onvarsion
<br />PMJect'rle services Included full time construction observation, materials testing
<br />review of Contractor's progress payments, resolution of design lssuas6 shop drawing
<br />Mvie% RFI resolution, change order management and resolution, mesillnge, public
<br />notifications and LEIWD coordination for shutdowns for Mls Project Our Construction
<br />Meftgerni!Mt WOM resolved public complaints and problems from *a local businesses
<br />and residence before they become problems fcr City Hall and LOWD, Me. Sigel also
<br />checked NPIDES and BMP measures, tratric control, and safety rriftesured during
<br />construction.
<br />J. W. Johnson Reservoir Facility Valve Replacements and Site
<br />Improvements Project
<br />LONG BEACH WATER DEPARTMENT I COMPTON, CA
<br />RWM&nt Eng'""Vermstreallo" M4118901r, Ms- Real Was responsible for overseeing
<br />this project, which Involved replacement of four underground water main valves,
<br />Installation Of fiv0storrh drain Inlets, construction of a containment cell I for an Indoor
<br />above -ground chlorine tank, construction of a large concrete reinforued storage pad,
<br />trenching for the Installation of electrical conduit, and re-priving of surface areas to
<br />allow for proper drainage.
<br />Group 12 CIPP Sewer Relining Program
<br />LONG BEACH WATER DEPARTMENT I LONG BEAGHj.CA
<br />Construcition Manager. Ms, Bean was the Construotion Manager for the Long Bepell
<br />Water Departments Group 12 CIPP sewer relining Program. This Involved,providing
<br />construction oversight and observation of LOWD's contractor to Inistall almost 15,OCo
<br />018-11"01, ID-fnrih, old 12-1no, curad,InOace SOWer' cleaning, Pre-linin videa,finIng
<br />and pM-Ilning vi
<br />dOo. Point repalis and manhole rehabilitations were also undertaken,
<br />Once the Installation of the CIPP began, Ms. Soon coordinatedwIth the kBWD for
<br />shutting off water services for the various residents and businesses along the sewer
<br />line routes. Once curIng was completed, a post lining Video was run, followed by re -
<br />Installation of the laterals and top hat Installation on select laterals,
<br />25E-541
<br />
|