Laserfiche WebLink
CONTACTINFID <br />DAN OJECIA, PE <br />d&nleI.qJadaGnvS.corn <br />649.586.0477 <br />Construction manager <br />............. . 1— ........ <br />exPERIENCE <br />40years <br />. .... ..... ................. .......... ; ... .... ......... . . . . ...... <br />Mr Ojeclais a highly ClUalified Professional engineerwith 40 years otaxpe.dence in <br />public WOft and CRY engineering with various Southern California <br />EIDUCA71ON <br />public agencies, <br />140 hRs0u00$s1uI1Y completed numerous small and lergswele Capital improvement <br />B'S. civil Engineering <br />Project$, He also has eKtonalve experlence In land developmentand I Ing; fid <br />Perm It traf <br />Construction Management <br />engineering; transportation plianairt, and grant implementatiom <br />Certificate Program, UCLA <br />As construction manager, Mr. O)e.dqls responsibilities, Include construction oversiot; <br />LICENSES <br />reviewing PMJOQ Plans, sPeolficAtIons, and costestimew; maintaining coat and <br />schedule control Including developing and updating the master schedul - <br />Civil Engineer (CA) <br />N6.26968 <br />me agi <br />the bi'd/aWaid process; administOrIngconAultoint and Construction cc a, n Ing <br />ntraft, <br />over6soingthe resident Inspection team, 06 well as materials testing and deputy <br />inspection teams; conducting Wdoldy progress mesflngs�, processin 9 and Vac.king <br />Project correspondents and documentation Including RFIS, 4UbmItWI$,.shop drawings, <br />and RPQ* reviewing evaluating, and negodabag Construction change orders; <br />fadlitating work related to.warrantles., and managing project closeouL <br />Project Experience <br />C41yWide, Street Rehabilitation <br />CITY OF WM COVINA I WEST COVINA, CA <br />c0naim*00" Ma"09606SPector. Mr. Ojecla provided Construction management <br />and inspection services for 0 federally funded citywide street rehabilitation project <br />The $cope of work included roadway reconstruction and resurfacing; reconstruction <br />of sidewalks, driveways, Curb, gutter, and ADA Curb ramps, and traft signage <br />and striping, All services were administered In compliance with the Caltrans Local <br />Assistance Procedures Manual. <br />Atlantic Avenue (From 1-5 Freeway to South City Limits), Federal Project <br />No. ESPL-5250(913) <br />CITY OF LYNWOOD I LYNWOOD, CA <br />Constrootton Manager. Mr. qede served as 00%truction manager on this street <br />Improvement ProJect, The scope of wor� Included roadway reconstruction and <br />MaUrlecin& reconstruction of sidewalks, driveways, curb, gutter, and ADA Curb ramp$; <br />and traffic signage and striping. The PTOJeot was funded With the American Recovery <br />and Reinvestment Act funds. <br />Abbott Road Improvements, Federal Project STPL-5250(olo) <br />CITYOF1.YNWOQ,D I LYNWOOD, CA <br />CONOtructiOn Manager. Mr. DO& served as construction manager on this <br />federally funded street Improvement project. The scope of work included roadway <br />reconstruction and resurfacing; reconstruction of sidewalks, driveways, curb, gutter, <br />N V cross gutters, and ADA curb ramps; end traffic signage and striping <br />Industry Way improvements <br />CITY OF LYNWOOD I LYNWOOD, CA <br />CO"stfuction Manager, Mr, Piece served as construction manager on this street <br />improvement project. The scope of work consisted of roadway reconstruction and <br />15 resurfacing; reconstruction of sidewalks, driveways, curb, gutter and ADA curb ramps; <br />and traffic $19nage and striping. <br />25E-543 <br />