Laserfiche WebLink
COWACTINFO <br />ROBERT H. DOSSj PE <br />robertdossOnvfLoorn <br />049.585,0477 <br />Construotion Manager <br />­­ .... ­� . ............. mo;.� . ....... �­, ...... . ...... — .... . ........ ... ........ . ..... . ........ <br />EXKRIENCE <br />Mr. Dots has.more than 35 yeam of experience In civil engineering, As a results. <br />36 years <br />oriented project manager, Roberfs strengft include strong analytical skills, proven <br />EDUCATION <br />successful negOtlaft CORSIStancY in quality Performance, doenonstrated positive <br />M.8A Management <br />proaotive actions, composure while under pressure,,consistancy In delivering superior <br />B.S..CK41 Engineering <br />a orvice tailored to Individual customer needs, superbleadersfilp traft, organizational <br />scheduling and planning skills, cluick problem solvinp, work prioritizing, productivity <br />LICENSE$ <br />maximization, and great foresight <br />CMIErlgineer(CA) <br />Ao. a236 <br />Project Uperlence <br />Caltram; Resident <br />EngineerAcadqmy <br />. ...... <br />City of Stanton Public Works !)apartment and Engineering Department <br />CITY OF sTANT ON [ STANTON, CA <br />caltrans Office Engineers <br />Public WOrks OffectOr and CIV Engineer. Mr. Doss managed the public Works <br />Acadargy <br />001asnirrerlt 0' Pd Engirls0*19 Department W a city with 0 p0putoltion of 40,000. <br />Robert directed personnel, made City Council Presentation.% interacted with public <br />citizens and controlled a budgeter ckw� $12 million annually. In addition, Robert <br />managed the emstnictlon of $16 million In.capital improvement projects, I UdIng <br />detignbuctgeting, and construction, the projects w9rooprnplat 0 so a <br />d head of h dule <br />With A.9svingil of $1 million dollars, <br />NIV15 <br />Beach Boulevard Sound Wall <br />CITY OF STANTON I STANTON, CA <br />COUSITUOtitm Manager. Mr. DOW Managed this retaining wall and sound wall <br />construction project that Included CIDH. piles. 7110 project Involved poured concyste <br />retaining walls Wit . h masonry sound wails on top of the retaining walls, <br />State Route 55 <br />OALTRANS DISTRICT 12 —STATE OF CALIFORNIA <br />Resident 0"91118011. Mr. DOSS oversaw this retaining wall and sound wall freeway <br />construction prqject, Including 25 CIOH piles. The project Involved poured concrete, <br />retaining walls with masonry sound walls on tDp of the retaining Walls, <br />State Route 91 <br />CAIJRANS WSTRICT 12 — 8TAX- OF CALIFORNIA <br />Resident Engineer. Mr. DOSS oversaw this retaining wall and sound wall freeway <br />construction project, Including 42 CIDH piles. The project Involved poured. concrete <br />retaining walls with masonry sound walls on top of the retaining walls, <br />Interstate S/Red Hill <br />CALTRANS' DISTRICT 12 —STATE OF CALIFORNIA I ORANGE COUNTY, CA <br />Resident Engineer. Mr. Doss oversaw this $20M freeway construction project, <br />Including demolition and Construction of 8 new I?rldgO, The Project Involved major night <br />Work because freeway lanpq could only be closed between 11 p.m. and 5 a.m. This <br />bridge expansion was.s cast4ni-plade concrete box gi rder span. <br />25E-542 <br />