My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC. (3)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 9:22:33 AM
Creation date
6/27/2018 10:24:43 AM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
17-6613
Agency
Public Works
Council Approval Date
10/17/2017
Document Relationships
20A - AA AWARD CONTRACT ARNAZ ENGINEERING STORM DAMAGE
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2017\10/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />CONSTRUCTION CONTRACT <br />PROJECT NO. 17-6613 <br />EMERGENCY CONSTRUCTION <br />EXHIBIT A <br />'M1'•:. <br />SCOPE OF SERVICES AND COMPENSATION SCHEDULE SHALL BE BASED ON A <br />TIME AND MATERIAL FORCE ACCOUNT BASIS AS SPECIFIED IN THE STANDARD <br />SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. <br />The urgent repairs shall be completed by performing the work on a design -build basis limited to <br />time and material pricing, using acceptable methods and equipment approved by the City. Costs <br />shall be calculated based on actual costs and quantities of materials used by the contractor at <br />standard materials pricing, and actual man-hours worked at standard prevailing wage rates. Staff <br />shall verify and confirm accounting of materials and labor consumed to monitor progress and <br />billing. <br />THE WORK SHALL TAKE PLACE AT THE FOLLOWING LOCATIONS: <br />1) Emergency Protective Measures at Lincoln Avenue Channel includes concrete debris removal, temporary <br />shoring installation, removal, and rental fees. The cost is not expected to exceed $60,000. <br />2) Emergency Construction at Lincoln Avenue Channel includes demolition and reconstruction of channel and <br />wall. The cost is not expected to exceed $371,250. <br />
The URL can be used to link to this page
Your browser does not support the video tag.