Laserfiche WebLink
CITY OF SANTA ANA <br />CONSTRUCTION CONTRACT <br />PROJECT NO. 17-6613 <br />EMERGENCY CONSTRUCTION <br />EXHIBIT A <br />'M1'•:. <br />SCOPE OF SERVICES AND COMPENSATION SCHEDULE SHALL BE BASED ON A <br />TIME AND MATERIAL FORCE ACCOUNT BASIS AS SPECIFIED IN THE STANDARD <br />SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. <br />The urgent repairs shall be completed by performing the work on a design -build basis limited to <br />time and material pricing, using acceptable methods and equipment approved by the City. Costs <br />shall be calculated based on actual costs and quantities of materials used by the contractor at <br />standard materials pricing, and actual man-hours worked at standard prevailing wage rates. Staff <br />shall verify and confirm accounting of materials and labor consumed to monitor progress and <br />billing. <br />THE WORK SHALL TAKE PLACE AT THE FOLLOWING LOCATIONS: <br />1) Emergency Protective Measures at Lincoln Avenue Channel includes concrete debris removal, temporary <br />shoring installation, removal, and rental fees. The cost is not expected to exceed $60,000. <br />2) Emergency Construction at Lincoln Avenue Channel includes demolition and reconstruction of channel and <br />wall. The cost is not expected to exceed $371,250. <br />