Laserfiche WebLink
We Make o Difference <br />INTERNATIONAL <br />May 24, 2018 <br />City of Santa Ana <br />Attn.: Monica Suter <br />Public Works Agency <br />20 Civic Center Plaza; 3rd Floor Reception, Ross Annex <br />Santa Ana, CA 92701 <br />Subject: Proposal for Civic Center Starmwater Lift Station Renovation Design Services <br />RFP No. 18-041 <br />Dear Ms. Suter and Selection Committee: <br />Michael Baker International, Inc. (Michael Baker) appreciates the opportunity to be of continued <br />service to the City of Santa Ana (City) through this engineering services contract. The City is seeking <br />a consultant that has the right combination of relevant experience and expertise to design needed <br />improvements for the Civic Center Stormwater Irft Station Renovation Project. We have brought <br />together an exceptionally qualified team ready to deliver quality services, including key professionals <br />from within our firm who worked on the City's Stormwater Pumping Stations Preliminary Study in <br />2016. Our team is available to start work Immediately and can efficiently produce the final design <br />package in an expedited schedule. As partners in your mission to upgrade these critical facilities, we <br />offer the City the following benefits: <br />✓ Highly Experienced Project Manager with Expertise to Deliver a Ouality Project. Our <br />team will be led by Safe Kamangar, PE, PMP, CCM, QSD, who has 20 years of experience in <br />the planning and design of water Infrastructure. Safa is uniquely qualified to manage this <br />project and has successfully delivered design for rehabilitation, upgrade and/or replacement of <br />multiple pumping and lift station projects. He has also served as Construction Manager on a <br />number of pump station projects, giving him an advanced understanding of a project from the <br />planning and design phases through construction completion. <br />✓ Team with In -Depth Knowledge and Background with the Civic Center Stormwater Lift <br />Stations Streamlines Design. Our team includes Electrical Engineer, Marek Przywara, PE; <br />and Structural Engineer, Sal Sheikh, PE, who both worked on the Preliminary Study for the <br />stormwater lift stations. In addition, they bring 34 years of electrical engineering and 44 years <br />of structural engineering experience to this project. Our OC Manager, Mujahid Chandoo, PE, <br />performed hydrology and hydraulic analysis of the Civic Center as part of the detailed Storm <br />Drain Master Plan provided to the City in 2016. The data gathered during the master plan will <br />be reviewed to verify the conclusion of the preliminary study that the pumps are correctly <br />sized. This detailed information will provide added value to prevent future flooding, and may <br />provide an opportunity to reduce the pump size, thus reducing capital, operation, and <br />maintenance costs for the City. <br />✓ Integrated In -House Team Members Translate to Quick and Efficient Coordination and <br />Communication. Project Engineer, Charles Falzone, PE, has seven years of experience in <br />water resources engineering and will directly support our Project Manager in the design and <br />MBA KERINTL.COM 5 Hutton Centre Drive. SuiteSoo I Santa Ana. CA 92707 <br />Office. 949.47Z3505 I Fax 9494728373 <br />25B-19 <br />