Laserfiche WebLink
Ms. Monica Suter <br />May 24, 2018 <br />Page 2 <br />We Make a Difference <br />coordination of the Project. Other in-house team members include Technical Review, Karl <br />Meter, PE; Constructability Review, Jerome Ruddins, CCM; Structural Engineer, Fabio <br />Sanchez -Duran, PE, SE; Electrical Engineers, Yee Ping See, PE, LEED AP, and Rich <br />Davis, PE; Environmental Specialist, Alan Ashimine; and Surveyor, Steve Slocum, PLS. <br />✓ Multi -Discipline Capabilities. As a multi -discipline firm, Michael Baker has diverse expertise <br />and depth of resource capabilities to support the team in any area that may be called upon <br />throughout the course of the project, <br />Michael Baker's Legal Department has reviewed the City's Standard Agreement provided in <br />Attachment 2 of the RFP, and requests consideration for changes listed on the following page. <br />We are confident In our ability to provide the City of Santa Ana with timely and cost-effective design <br />solutions. Our local Santa Ana office and close proximity to the City will facilitate quick response for <br />meetings and project requirements, and the City can be assured of our commitment to your needs. <br />If you have any questions or require additional Information, please contact me at (949) 330-4275, <br />inacle@mbakerintl.com or Project Manager, Sella Kamangar, at (949) 330-4138, <br />safa.kamanoarOmbakerintl.com <br />Respectfully submitted, <br />J4, <br />John Nagle, P.E. Safam ngar, E. <br />Vice President / Principal -in -Charge Project Manager <br />Enclosure., Proposal (1 original, 4 copies, 1 CD); Fee (separate envelope) <br />25B-20 <br />