Laserfiche WebLink
PROPOSAL <br />Civic Center 5tormwaterLiftStotlonRenovotionlesign.Services s' ` <br />4 <br />Charles Falzone, PE I Project Engineer <br />s s Charles Falzone has seven years of experience in the design of water and <br />wastewater Infrastructure with broad understanding of civil, mechanical, <br />process, electrical and instrumentation design of pump stations, treatment <br />plants, water conveyance, and related facilities. He is currently providing <br />t engineering on Orange County Sanitation District's Western Regional Trunk <br />r 't Sewer Rehabilitation Project, Including a temporary pumping system; and <br />Recycled Water System for the City of Ontario that includes an irrigation <br />v' booster pump station. He was the engineer responsible for preliminary <br />design for the Hyperion Secondary Effluent Pump Station; and Project <br />Engineer for the Pacific Grove Local Water Project that included design of the influent pump <br />station, headworks, complete membrane bio -reactor, UV disinfection, and rehabilitation of two <br />existing tanks for effluent storage. <br />s . <br />z.Marek Przywara, PE I Lead Electrical Engineer <br />Marek Przywara will serve as Lead Electrical Engineer. Marek was part of <br />the team that performed the Preliminary Study for the Civic Center <br />Stormwater Lift Station Renovation Project and brings an In-depth <br />understanding of the electrical and controls systems for these two pump <br />stations. He has 34 years of experience In electrical engineering and has <br />served as a project manager and/or SCADA, <br />ElectricaVlnstrumentation/Controls engineer on numerous waterhvastewater <br />facilities including wastewater treatment plants, pump stations, sewer <br />stations, reservoirs, solid waste facilities, and desalination plants. His duties have Included overall <br />responsibility for engineering, project management, development and design implementation, <br />supervision and approval of documentation and drawings, calculations and analysis, schedules, <br />specifications, cost estimates, and coordination with vendors and clients. <br />Sal Sheikh, PE, Lead Structural Engineer <br />Sal Sheikh has over four decades of experience including the last 30 years <br />1, with Michael Baker, and will lead structural engineering tasks for the <br />proposed project. His background Includes structural design for pump <br />stations, lift stations, well facilities, pipelines, water and wastewater <br />treatment plants, reservoirs, culverts and encasements, flood control <br />channels, bridges, sound walls, and retaining walls. He is also experienced <br />in structural Inspection, evaluation, repairs and rehabilitation of water related <br />facilities. Sal was part of the team that performed the Preliminary Study for <br />the Civic Center Stormwater Lift Station Renovation Project. He was also the structural engineer <br />on the Los Alamitos Pump Station Reconstruction for the County of Orange; Whittier Pumping <br />Plant No. 2 Replacement for the City of Whittier; Walnut Avenue Overcrossing Pumping Plant in <br />Orange County; as well as numerous pump station replacement and rehabilitation projects. <br />IMUNAIIOOAL 3 <br />25B-25 <br />