PRDPOSAL
<br />Civic Center StormwaterLiftStotionRenovation Des
<br />ign5ervites
<br />Mujahid Chandoo, PE I Hydrology/ Hydraulic Review
<br />Mujahid Chandoo is a Project Manager with Michael Baker with more than
<br />12 years of experience In surface water management. Mujahid has an in-
<br />depth understanding of the stormwater issues for the proposed Civic Center
<br />w' Stormwater List Station Renovation Project through his involvement on the
<br />t.:
<br />City's Storrs Drain Master Plan Update Project where Michael Baker
<br />analyzed the main line drainage system and prepared a hydrology study
<br />along with maps for the entire city boundary and for individual sub -areas for
<br />2-, 10-, 25-, and 100 -year storm events. The capacity of the existing storm
<br />drainage was evaluated to determine system capacity sufficiency using a
<br />hydrodynamic hydraulic model. A comprehensive list of needed storm drainage improvements
<br />was then generated. Mujahid's areas of expertise include hydrology, hydraulics, sediment
<br />transport and advanced modeling.
<br />Project Team Summary Qualifications Table
<br />Highlighted below are the qualification of our team. Resumes are included at the end of this section.
<br />INTMNMATINIIAI 4
<br />25B-26
<br />Safe Kamangar, PE,
<br />20
<br />M.S., Civil Engineering
<br />Civil Engineer, CA, C70118
<br />City of Brea, Pump Stations 2 and 3
<br />!
<br />PMP, CCM, QSD
<br />B.S., Civil Engineering
<br />Project Management
<br />Rehabilitation
<br />Project Manager
<br />50%
<br />Professional (PMP), 1863656
<br />Certified Construction Manager,
<br />I , Garden Grove Sanitary Distr ct Tiffany
<br />6341
<br />Pump Station Replacement
<br />I Envision Sustainability
<br />; - Moulton Niguel Water District, Paseo
<br />1 Professional
<br />De Valencia Sewer Lift Station
<br />Qualified SWPPP Developer
<br />i Rehabilitation
<br />John Nagle, PE
<br />F ---
<br />--- — - ---
<br />—(OSD 23059
<br />-
<br />ncipal-in-Charge
<br />i 31
<br />M.S., Civil Engineering
<br />B.S., Civil Engineering
<br />Civil Engineer, CA, 46972
<br />i . City of Whittier, Pumping Plant No. 2
<br />I
<br />Also registered in NV, AZ, UT,
<br />Replacement
<br />5
<br />5%
<br />;
<br />i and Guam
<br />• R-28 Reservoir, P-27 Pumping Station
<br />' -M.S.,
<br />and PRV Stations 123,124, and 125
<br />Charles Felmne, PE—
<br />7
<br />I
<br />I Civil Engineering
<br />Civil Engineer, CA, 84048
<br />• City of Ontario, RW System
<br />Project Engineer
<br />B.S., Civil Engineering
<br />Hyperion Secondary Effluent Pump
<br />60%
<br />Station
<br />John Moynier, CEP,
<br />T 36
<br />M.A, Computer
<br />;Certified Env ronmental —
<br />Pacific Grove Local WaterPrejed
<br />Long -Term Facilites Pian PER, OOCWD
<br />CFM
<br />Assisted Cartography
<br />Professional, USA, 2014,
<br />Area Drainage Master Study, Flood
<br />QC Manager
<br />B.S., Geography-
<br />i #14041431
<br />Control District of Madoopa County
<br />15%
<br />Ecosystems
<br />Ceri fled Fkrodplain Manager,
<br />': • Program Management for FloodSAFE
<br />USA 2008, US -08-03663
<br />California California DWR
<br />Mujahld Chandon, PE
<br />12
<br />` B.S., Civil Engineering
<br />; Civil Engineer, CA, 76633
<br />City of Santa Ana, Storm Drain Master
<br />Hydrology/Hydraulic
<br />Plan
<br />' Rev ew
<br />City of Anaheim, Master Plan of Stone
<br />2g%
<br />Drainage for North and West Santa Ana
<br />RiyerTdbutaryAreas_....-.......---
<br />Kari Meier, PE
<br />15
<br />I' B.S., Civil Engineering
<br />Civil Engineer, CA, 71713
<br />City of San Buenaventura, Nath Bank
<br />Technical Review
<br />Construction Quality Management
<br />Lit: Station Upgrades
<br />10'/°
<br />for Contractors, SPK-USACE-
<br />• County of Orange, Los Alamitos Pump
<br />02-18-00060
<br />Station Reconstruction
<br />- Spring Canyon Sewer Lit Station,
<br />'_........ ---._..---_.___._...._..._....C__--
<br />--
<br />_..-- -
<br />Newhall Count
<br />INTMNMATINIIAI 4
<br />25B-26
<br />
|