My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT STORMWATER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
07/17/2018
>
25B - AGMT STORMWATER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2018 5:31:44 PM
Creation date
7/12/2018 5:27:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
7/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSSR1 M r as r m I <br />Civic CenterStarmwoterUftStationRenovallonDes%nServices <br />• Identify the preferred upgrade solution(s) based on financial and O&M considerations. <br />• Evaluate shutdown limitations and construction sequencing <br />Key items regarding the project approach are electrical safety and maintenance oonvenlence and <br />providing protection of electrical equipment against harsh environment and sun exposure. <br />Michael Baker will meet with the City to develop a detailed sequence of work and coordinate and <br />finalize shutdown constraints (Including duration). Sequence of work will address the following: <br />• Cooperation between contractor and City personnel <br />• Dates and durations of construction and all shutdowns to be approved in advance by City <br />In order to prevent flooding. <br />Following sections described specific upgrades and Issues for each pump station. <br />Santa Ana Pump Station <br />The Santa Ana PS was constructed in 1963 as part of the Civic <br />Center Construction Program, and operates during a storm to prevent <br />flooding of the parking structure and southern walkways. The pump <br />station is a vertical concrete structure with a concrete slab separating <br />the lower wet well from the upper dry well. The dry well Is set three <br />feet below grade and houses three pumps and the electrical <br />equipment: the pumps are 60 horsepower (hp), 30 hp, and 15 hp and <br />are driven by electric motors, and the 60 hp pump and motor were <br />replaced in 2016. <br />After thorough review of the existing documents and Scope of Work, <br />Michael Baker has identified the following proposed upgrades to the <br />Santa Ana Pump Station: <br />• Pump and motor replacement: remove and replace the two <br />(2) older pumps, and keep the larger pump installed in 2016. <br />Replace all three (3) of the existing pump motors with <br />explosion proof motors. <br />• Sump pump replacement: Remove the existing sump pump and replace with a %z hp <br />explosion proof, solids handling sump pump. <br />• Piping and valve replacement: Remove and replace the existing piping and valves In kind. <br />• Structural improvements: Patch the existing concrete structure, seal penetrations, and <br />provide Basketed roof seals. Remove and replace the metal enclosures over Isolation <br />valves. <br />• Mechanical Improvements: install a new HVAC system and seal openings between the <br />wet well and dry well to declassify the dry well and comply with NFPA 820 requirements. <br />• Electrical improvements: Remove and replace the existing electrical equipment to comply <br />with NEC and NFPA 820 requirements. <br />• SCADA: The existing RTU Panel, which provides monitoring and alarming signals to the <br />City's SCADA system, will remain as is. Re -wire and re -terminate the wiring to and from <br />the RTU panel as required. <br />IN189l Fna•AL <br />25B-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.