Laserfiche WebLink
PPOPOSAL?n <br />Civic CenterStormwowLfftStationRenovctfon DasignServicas <br />• Instrumentation: Remove the existing bubbler level Instrument and install new pressure <br />transducer. Float switches will be provided as back-up to the new pressure transducer. <br />Install an intrusion switch to notify the City when the hatch door is open. <br />Flower Pump Sfaflon Upgrades <br />The Flower PS operates during a stone to prevent flooding of the parking lot near the intersection <br />of Flower Street and Sixth Street. The pump station is a vertical concrete structure with a metal <br />grating separating the lower wet well from the upper level that houses the electrical equipment. <br />The existing pumps are 10 hp and 20 hp axial flow pumps, and are driven by electric motors. <br />During a storm, water cascades through the floor grating and into the wet well, and the grating <br />serves as a coarse screen for debris. During the 2016 site visit, Michael Baker noted a significant <br />amount of debris and trash was present on the grating and within the wet well. In addition to the <br />debris, Michael Baker noticed that the wet well was completely full, although electricity was being <br />provided. This could Indicate that the control system is not operating as intended, <br />The proposed upgrades at the Flower PS include: <br />• Pump and motor replacement: Remove existing horizontal -axial pumps and replace with <br />explosion proof submersible pumps installed on guide rails. <br />• Piping and valve replacement Remove and replace the existing piping and valves. <br />• Structural Improvements: Modify the existing <br />structure to accommodate the submersible pumps, <br />Including adding structural reinforcement, safety rail, <br />and access hatches. Patch the existing concrete <br />structure including roof hoist. Remove and replace <br />existing metal grating, the new grating will cover the <br />entire floorspace. <br />• Site & drainage improvements: Modify local site <br />grading and install a Continuous Deflection System <br />(CDS) Stormwater Treatment Unit to capture debris before it enters the wet well. The CDS <br />unit will decrease maintenance requirements for debris removal, and will better prevent <br />debris from reaching and potentially clogging the pumps. <br />• Electrical Improvements: Remove the existing electrical equipment and replace with <br />outdoor NEMA 3R NEC compliant electrical equipment. Replace remaining electrical <br />equipment within pump station (lighting, receptacle, etc.) with Class 1 Div 2 rated <br />equipment. Seal conduit penetrations to the pump station and provide explosion proof <br />conduit fittings to comply with NEPA 820 requirements. <br />• SCADA: Install a new NEMA 4X Remote Terminal Unit similar to the unit at the Santa Ana <br />PS Including a Yagi directional antenna. The new RTU Panel will provide monitoring and <br />alarming signals to the City s SCADA. <br />• Instrumentation: Remove the existing level instrumentation and install new pressure <br />transducer and back-up float switches. Install an intrusion switch to notify the City when <br />the hatch door is open. <br />i•r[aeanoxu• a <br />25B-30 <br />