Laserfiche WebLink
PROPWAL ` <br />Civic Center StormwaterLiftStationRenovation Design, Services <br />John Nagle, P.E. <br />Principal -in -Charge <br />Mr. Nagle has practiced in the field of civil engineering for many <br />years and has extensive experience in planning, designing, and <br />providing construction support services for major water and <br />wastewater facilities. He has been responsible for the <br />preparation of numerous construction plans, specifications and <br />cost estimates for water and sewer pipelines, water pumping <br />stations, wastewater lift stations, wells, and reservoirs. He has <br />also prepared master plans for both municipal and private - <br />sector clients for potable water, sanitary sewer, and recycled <br />water systems. Mr. Nagle has used his combination of planning <br />and design experience to prepare capital improvement <br />programs, condition assessment studies, and engineering <br />feasibility studies. He is a proven Team Leader and well- <br />respected Project and Task Manager, committed to delivering <br />technically sound and innovative design solutions. <br />Project Experience <br />Whittier Pumping Plant No. 2 Replacement Project, Pico <br />Rivera, California. City of Whittier. Project Manager. Michael <br />Baker provided design engineering services and construction <br />phase support, including full-time construction management <br />and inspection services, for the replacement of Whittier Utility <br />Authority's (WUA) Pumping Plant No. 2, which was originally <br />constructed in the 1930's. The new PP2 facility includes a new <br />18.9 -MGD pump station, with 17,500 gpm of pumping capacity <br />to enable WUA to pump during off-peak periods and reduce <br />power costs; two 2.2 -MG above -grade steel reservoirs to serve <br />as the forebay and provide operational storage; a 6,400 - <br />square -foot pump building, Including office space for water <br />production and pumping plant personnel; new piping and <br />control valves at off-site reservoirs; and upgraded SCADA and <br />radio communication facilities throughout the entire WUA <br />service area. <br />OC -44 Pipeline Rehabilitation/Replacement Project, <br />Orange County, California. Mesa Wafer District. Task <br />Manager. Mesa Water District selected Michael Baker to <br />complete a Rehabilitation/Replacement Evaluation and <br />Cathodic Protection Study for the OC -44 Pipeline. The OC -44 <br />pipeline runs approximately 8.6 miles through Orange County. <br />Michael Baker provided a comprehensive plan to investigate <br />the condition of the existing pipeline, evaluate repair and/or <br />replacement strategies, and identify permitting and follow-on <br />technical studies required to implement the recommended <br />strategy. Final design (PSBE) was prepared for the selected <br />alternative. <br />Years of Experience: 31 <br />Education/Training: <br />M.S., 1996, Civil Engineering, <br />Loyola Marymount University <br />B.S., 1987, Civil Engineering, <br />Loyola Marymount University <br />Licenses/Certifications: <br />Professional Engineer - Civil, <br />California, 1991, 46972 <br />Professional Engineer - Civil, <br />Nevada, 2001,14762 <br />Professional Engineer- Civil, <br />Utah, 2009,7214109-2202 <br />Professional Engineer - Civil, <br />Arizona, 2009, 49684 <br />Professional Engineer - Civil, <br />Guam, 2015, CE 1850 <br />Water Rights Surveyor, Nevada, <br />2001,1101 <br />Professional Affiliations: <br />American Public Works <br />Association, Southern <br />California Chapter, Member <br />American Society of Civil <br />Engineers, Orange County <br />Branch / Los Angeles Section, <br />Member <br />American Water Works <br />Association, Member <br />Orange County Water <br />Association, Member <br />i Additional Projects: <br />0 R-28 Reservoir and P-27 <br />a Pumping Station` <br />I � R-29 (2760 Zone) Reservoir <br />and P-29 Pumping Station <br />? SNWA 34OC-02 Hacienda <br />Pumping Station <br />Improvements <br />i P C1244 Fries 2635 Zone <br />Reservoir / 274.5 Zone <br />Pumping Station <br />INT[NnRnaNll John Nagle, P.E. <br />25B-44 <br />