Laserfiche WebLink
PROPOSAL " ffit mq <br />Civic CenterStormwaterLiftStatfonRenovation DeslgnServlces „! <br />Charles Falzone, P.E. <br />Project Engineer <br />Mr. Falzone is a Civil/Environmental Engineer with experience in <br />design of water and wastewater infrastructure with broad <br />understanding of civil, mechanical, process, electrical and <br />Instrumentation design of treatment plants and water <br />conveyance. <br />Project Experience <br />Recycled Water Delivery System, Ontario, California. City <br />of Ontario. Project Engineer. Responsible for process control <br />narrative and start-up of the irrigation booster pump station. <br />Michael Baker prepared plans, specifications, and estimates <br />(PS&E) for the City's new backbone recycled water distribution <br />system. The system includes over 10 miles of recycled water <br />PVC pipeline ranging in size from 8 -inch to 24 -inch diameter, a <br />new irrigation system booster pump to irrigate the Euclid <br />Avenue center median; a new recycled water booster pump <br />station required to deliver recycled water from Inland Empire <br />Utilities Agency's 1059 zone to the City's new recycled water <br />distribution high zone; preparation of a Title 22 Supplemental <br />Engineering Report and California Environmental Quality Act <br />(CEQA) documentation; and bidding and construction phase <br />engineering support. <br />Western Regional Trunk Sewer Rehabilitation, Orange <br />County, California. Orange County Sanitation District. Project <br />Engineer. Responsibilities included preparation of preliminary <br />design memorandums addressing CIPP system, temporary <br />pumping system, constructability Issues, and permitting <br />requirements; and overseeing the preparation of the <br />construction documents for rehabilitation of a 3 -mile long trunk <br />sewer in the cities of Anaheim, Buena Park, and Cypress. <br />Ventura County Waterworks District No."! 9 - Wells No. 2 <br />Upgrades, Somis, California. Ventura County Water & <br />Sanitation Services. Project Engineer. Michael Baker is <br />providing final design, and construction assistance for wellhead <br />equipping and oxidation -filtration treatment systems for two <br />groundwater supply wells. Design services included a new <br />chemical addition and monitoring system, three new <br />pressurized filtration units, a sludge handling system, and <br />electrical upgrades. Control design Included preparation of <br />process and instrumentation diagrams and specification of <br />control components to provide consistency with control <br />components installed in existing district facilities. A new PLC <br />system was designed that will control and monitor the existing <br />Years of Experience: 7 <br />Education/Training; <br />M.S., 2010, Civil Engineering, <br />University of California, Irvine <br />B.S., 2009, Civil Engineering, <br />University of the Pacific <br />Llcensas/Certifications: <br />Professional Engineer, <br />California, 84048 <br />OSHA Construction Safety & <br />Health Certification <br />Confined Space Training <br />Professional Affiliations: <br />California Water Environment <br />Assocladon <br />Orange County Water <br />Association, Santa Ana River <br />Basin Section <br />Water Environment Federation <br />Additional Projects: <br />Condition Assessment and <br />Evaluation of Moss Avenue <br />Pump Station, Santa Monica <br />1, Rindge Sewer Pump Station <br />Project, Redondo Beach <br />0 Lathrop MBR Wastewater <br />Consolidated Treatment <br />Facility, Lathrop <br />i, Tapia Water Reclamation <br />Facility Process Air <br />Improvements, Calabasas <br />r Onsite Wastewater Treatment <br />System — LACFO Fire Camp <br />8, Malibu <br />o Civfta Water Reclamation <br />Facility, San Diego <br />0 Lift Station and Salt Water <br />Pump Station Evaluation, <br />Avalon <br />ISSEM <br />INTEIRAT90VAL Charles Falzone, P.E. <br />25B-45 <br />