My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT STORMWATER LIFT STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
07/17/2018
>
25B - AGMT STORMWATER LIFT STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2018 5:31:44 PM
Creation date
7/12/2018 5:27:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
7/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL r Y{a �..- <br />Civic CenterStormwoterLiftStotionRenovation Design Services . <br />condition of the existing pipeline, evaluate repair and/or replacement strategies, and identify <br />permitting and follow-on technical studies required to implement the recommended strategy. <br />Final design was prepared for the selected alternative. <br />Santa Ana River Interceptor (SARI) Relocation/Protection On -Call Topographic Field <br />Survey, Orange County, California. Orange County Sanitation District. Surveyor. <br />Responsible for field surveys. Michael Baker has assisted the Orange County Sanitation <br />District and Santa Ana Watershed Project Authority for several years by conducting topographic <br />surveys to assess the stability of the pipeline and manholes along the subject Santa Ana River <br />Interceptor (SARI) line segment. Michael Baker has conducted field surveying for each <br />monitoring survey at critical locations to assess the current pipe depth and compare changes in <br />the pipe depth with previous reports. This work included taking survey cross sections and <br />profiles of the SARI line and the Santa Ana River bed at various locations. <br />Lakeview Transfer R&R Project, Anaheim, California. Orange County Water District. Party <br />Chief. Responsible for fleld surveys. Michael Baker performed a comprehensive assessment <br />of the existing 7 -foot x 7 -foot reinforced concrete box (RCB) structure, analysis of alternative <br />conveyance options, recommendations for repair or replacement, and final design services for <br />the preferred option for the Orange County Water District (OCWD). Michael Baker's design <br />services included: inspections, structural analysis of the existing RCB structure, hydraulics <br />operation and capacity, analysis of existing drain tubes, flow analysis for repair or replacement <br />options, design calculations, and development of construction documents and drawings. <br />Reservoir No. 18, Chino Hills, California. City of Chino Hills. Party Chief. Responsible for <br />field surveys. Michael Baker provided professional engineering services for the design of a new <br />reservoir that will be a major improvement to the city's water distribution. The proposed reservoir <br />will be located at the site of existing Chino Hills Reservoir No,1 within the Village Oaks <br />community. The project Involved an analysis of steel versus concrete tank types, development <br />of demolition plans for the existing reservoir, and design of the new reservoir. <br />On -Call Professional Civil Engineering Services Port of Long Beach, Long Beach, <br />California. Port of Long Beach. Party Chief. Responsible for field surveys. Under an on-call, <br />five-year contract, Michael Baker is providing a variety of design and engineering services. To <br />date, the primary task orders have included: Task order no. 1 - Pier D Water System Interconnect; <br />Task order no. 2 - Pier C Sewer Abandonment Project; Task order no. 3 - Matson Terminal Berth <br />60 Pavement Condition Investigation; Task order no. 4 - Trailer Village PS&E; Task order no. 5 - <br />Pier D Roadway Improvements; Task order no. 6 -Anaheim/ 1-710 Health and Safety Services; <br />Task order no. 7 - Middle Harbor Pavement Analysis and Report; and Task order no. 8 - Interim <br />Headquarters Tenant Improvements 4801 Airport Plaza Drive. <br />I R T E R N A T to x AL Steven Slocum, P.L.S. <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.