Laserfiche WebLink
Civic Center StonnwoterUftStotion Renovotion Design Services ` <br />Client will be provided a detailed potholing report at the conclusion of the investigation: <br />Service Includes: <br />Vacuum Excavation to top of utility, encasement or stop depth Permanent Cold Patch <br />Sand Backfill Removal of Debris Pothole Report <br />Service Does Not Include <br />Permitting <br />Standard Traffic Control Hot Patching <br />Slurry Backfill <br />Engineered Traffic Control Plans Extensive Traffic Control Flagging for Traffic Control <br />P. Design of Temporary Pumping System. Michael Baker will provide a design of a <br />temporary pumping system that can be used during the rainy season. The design will <br />Include a schematic layout showing bypass pump location and discharge point, hydraulic <br />calculations to size temporary pumps, and selection of suitable pumping equipment. <br />COMMOM <br />INT[NNATIONAL 24 <br />25B-75 <br />