Matt Stepien, PE Quality Assurance/Quality Control Manager
<br />Education: BS/1979/Civil Engineering/California Polytechnic University, Pomona
<br />Registration: 1982/ PE/ CA #35500
<br />Years' Experience: 37
<br />A Registered Civil Engineer, Matt Stepien, PE, has extensive civil engineering experience with an
<br />emphasis on the design and management of municipal roadway and infrastructure improvement
<br />projects. Matt has substantial project experience with Los Angeles County cities, including Downey,
<br />Long Beach, Santa Fe Springs, Palos Verdes Estates, and unincorporated Los Angeles County, Since 2009,
<br />Matt has led on-call civil engineering efforts for the Cities of Long Beach and Downey, overseeing more
<br />than ten miles of roadway rehabilitation projects In Long Beach and four miles of roadway widening and
<br />rehabilitation in Downey. He is a leader in the private engineering sector for pavement recycling.
<br />RELEVANT EXPERIENCE
<br />Richmond Street Arterial Improvements, City of EI Segundo, CA. Project manager providing
<br />engineering for downtown area arterial Improvements involving 1,600 linear feet with 60 feet of street
<br />and sidewalk width. Design work centered on the street, sidewalk, parking, survey, traffic and
<br />landscaping upgrades. Resolved a key issue, an acute downtown parking problem, by engaging
<br />community in outreach meetings and creating street, sidewalk and parking design solutions.
<br />1-60S Arterial Hotspots, Los Angeles County Metropolitan Transportation Authority (LA Metro), La
<br />Mirada and Santa Fe Springs, CA. Project manager overseeing engineering services to complete PS&E
<br />for two Intersection improvement projects led by LA Metro, in collaboration with the Cities of La
<br />Mirada and Santa Fe Springs. The improvements Involve two Valley View Avenue locations, one at
<br />Alondra Boulevard, the other at Rosecrans Avenue,
<br />Lincoln Avenue Widening Design, City of Anaheim, CA. Project manager providing engineering design for
<br />project to widen 3,000 feet of Lincoln Avenue from East Street to Evergreen Street. Design work includes
<br />median, street, traffic, storm drain, landscape and private property improvements. Other work includes
<br />preparing an alignment and traffic studies; legal descriptions and Water Quality Management Plan.
<br />Seaside Way and Lew Davis Storm Drain, City of Long Beach, CA. Project manager for preparation of
<br />storm drain construction documents for new storm drain in Lew Davis Street. Per records, the existing
<br />storm drain in Clark Street is significantly undersized, causing flooding. As a solution, the flow on Lew
<br />Davis will be conveyed to a new storm drain which will outlet to Heather Channel.
<br />On-call Engineering Services, City of Downey, CA. Project manager for preparing PS&E for more than
<br />$20 million in improvements under this on-call contract. Projects include roadway, storm drain, parking
<br />lot, traffic, lighting, landscape and private property improvements. Others involve additional lanes,
<br />median and parkway improvements, decorative lighting and street furniture, and enhanced colored -
<br />concrete intersections and parkway paving. Projects to date include:
<br />• Firestone Boulevard Median Project, City of Downey, CA. Project engineer for raised median
<br />islands, entry monument sign, street rehabilitation and water facilities improvements on Firestone
<br />Boulevard between Old River School Road and West City Limits. Work Includes preparation of
<br />traffic study, complete plans, PS&E for the proposed Improvements, providing the bidding
<br />document and construction support.
<br />• Brookshire Avenue Pavement Rehabilitation, City of Downey, CA, Project engineer assisting the
<br />project engineer on the road rehabilitation project. The project included rehabilitation of the
<br />street to a new centerline profile while utilizing the existing curb and gutter location and elevation.
<br />On-call Civil Engineering, City of Long Beach, CA. Project manager for the preparation of PS&E for
<br />more than $15 million in improvements since 2009.
<br />RESUMES - APPENDIX Page 5 t
<br />ANDERSON-PFNNA
<br />
|