Laserfiche WebLink
Matt Stepien, PE Quality Assurance/Quality Control Manager <br />Education: BS/1979/Civil Engineering/California Polytechnic University, Pomona <br />Registration: 1982/ PE/ CA #35500 <br />Years' Experience: 37 <br />A Registered Civil Engineer, Matt Stepien, PE, has extensive civil engineering experience with an <br />emphasis on the design and management of municipal roadway and infrastructure improvement <br />projects. Matt has substantial project experience with Los Angeles County cities, including Downey, <br />Long Beach, Santa Fe Springs, Palos Verdes Estates, and unincorporated Los Angeles County, Since 2009, <br />Matt has led on-call civil engineering efforts for the Cities of Long Beach and Downey, overseeing more <br />than ten miles of roadway rehabilitation projects In Long Beach and four miles of roadway widening and <br />rehabilitation in Downey. He is a leader in the private engineering sector for pavement recycling. <br />RELEVANT EXPERIENCE <br />Richmond Street Arterial Improvements, City of EI Segundo, CA. Project manager providing <br />engineering for downtown area arterial Improvements involving 1,600 linear feet with 60 feet of street <br />and sidewalk width. Design work centered on the street, sidewalk, parking, survey, traffic and <br />landscaping upgrades. Resolved a key issue, an acute downtown parking problem, by engaging <br />community in outreach meetings and creating street, sidewalk and parking design solutions. <br />1-60S Arterial Hotspots, Los Angeles County Metropolitan Transportation Authority (LA Metro), La <br />Mirada and Santa Fe Springs, CA. Project manager overseeing engineering services to complete PS&E <br />for two Intersection improvement projects led by LA Metro, in collaboration with the Cities of La <br />Mirada and Santa Fe Springs. The improvements Involve two Valley View Avenue locations, one at <br />Alondra Boulevard, the other at Rosecrans Avenue, <br />Lincoln Avenue Widening Design, City of Anaheim, CA. Project manager providing engineering design for <br />project to widen 3,000 feet of Lincoln Avenue from East Street to Evergreen Street. Design work includes <br />median, street, traffic, storm drain, landscape and private property improvements. Other work includes <br />preparing an alignment and traffic studies; legal descriptions and Water Quality Management Plan. <br />Seaside Way and Lew Davis Storm Drain, City of Long Beach, CA. Project manager for preparation of <br />storm drain construction documents for new storm drain in Lew Davis Street. Per records, the existing <br />storm drain in Clark Street is significantly undersized, causing flooding. As a solution, the flow on Lew <br />Davis will be conveyed to a new storm drain which will outlet to Heather Channel. <br />On-call Engineering Services, City of Downey, CA. Project manager for preparing PS&E for more than <br />$20 million in improvements under this on-call contract. Projects include roadway, storm drain, parking <br />lot, traffic, lighting, landscape and private property improvements. Others involve additional lanes, <br />median and parkway improvements, decorative lighting and street furniture, and enhanced colored - <br />concrete intersections and parkway paving. Projects to date include: <br />• Firestone Boulevard Median Project, City of Downey, CA. Project engineer for raised median <br />islands, entry monument sign, street rehabilitation and water facilities improvements on Firestone <br />Boulevard between Old River School Road and West City Limits. Work Includes preparation of <br />traffic study, complete plans, PS&E for the proposed Improvements, providing the bidding <br />document and construction support. <br />• Brookshire Avenue Pavement Rehabilitation, City of Downey, CA, Project engineer assisting the <br />project engineer on the road rehabilitation project. The project included rehabilitation of the <br />street to a new centerline profile while utilizing the existing curb and gutter location and elevation. <br />On-call Civil Engineering, City of Long Beach, CA. Project manager for the preparation of PS&E for <br />more than $15 million in improvements since 2009. <br />RESUMES - APPENDIX Page 5 t <br />ANDERSON-PFNNA <br />