Laserfiche WebLink
�F. <br />Birch Street/State College Intersection Widening, PS&E, City of Brea, CA. Project manager responsible <br />for this project that added left turn lanes to provide dual left turn movements in the EB and WS <br />t <br />directions on Birch and extended the length of the SB dual left turn lanes on State College, The project <br />also added right turn lanes for ES, WB and NB traffic, and removed/modified and replaced the raised <br />median curbs. Right-of-way acquisition was also required. <br />Columbia Avenue/Iowa Avenue Improvements, PS&E, City of Riverside, CA, Project manager for the <br />planning and final design of a new grade separation at the BNSF tracks. The project included <br />construction of a precast box girder bridge overpass with MSE Ovalis, Services Included traffic signal <br />r <br />design, now sewer, water line, electrical undergrounding, storm draln, construction of a new RCB box <br />culvert for the Riverside Canal, extensive utility relocations and right-of-way acquisition. <br />Safe Routes to Schools (SRT$) Pedestrian improvements at Four Schools, Santa Monica, CA. Project <br />f <br />manager for engineering design services for the City of Santa Mon lea's Safe Routes to School (SRTS) <br />$. <br />Pedestrian program, which Includes SRTS improvements at four schools; John Adams and Lincoln <br />Middle Schools, Roosevelt Elementary School, and the Will Rogers Learning Community. The <br />Improvements Include curb extensions (bulbouts), upgraded crosswalks, rectangular rapid flashing <br />4i? <br />beacons and revised traffic signal operations, The City is utilizing Capital Improvement Project (CIP) <br />Funds to Implement the Improvements. <br />McBean Parkway Median Alignment, City of Santa Clarita, CA. Project managerfor the preparation of <br />an updated concept plan, Final plans, technical specifications and estimate (PS&E) for proposed $treat <br />Improvements of the McBean Parkway, a major six-lane arterial highway In the City of $ante Clarita <br />that extends from interstate 5 (1.5) on the west to Copper Hill Drive on the east with a posted speed <br />limit of 45 mph within the project limits. <br />Six ATP Projects, Bureau of Engineering, City of Los Angeles, CA, Provided staff augmentation to City <br />staff for the pre-design, design and provision For technical assistance during construction associated <br />with the delivery of six projects funded through the ATP that have a combined construction cost of $23 <br />million. The effort Included four Safe Routes to Schools Infrastructure Improvements projects, <br />Hollywood Western Pedestrian Improvements and City of Los Angeles Little Tokyo Pedestrian Safety <br />Improvements. <br />Clovarfletd Boulevard Widening and Improvements, PS&E, City of Santa Monica, CA. Project manager <br />for the widening of Cloverfield Boulevard to allow for three travel lanes In each direction. This project <br />was the second phase of a two-phase project and included CloverReld Boulevard from Michigan <br />Avenue to Colorado Avenue. Work Included street design, traffic signals, right-of-way engineering, <br />property appraisals, landscape and irrigation, street lighting and widening/narrowing of streets to <br />Improve circulation. <br />Railroad Avenue Improvements, Ps&✓+, City of Santa Clarita, CA. Project manager for design and right- <br />of-way services for Improvements to Railroad Avenue. The project included the realignment of Railroad <br />Avenue, pavement reconstruction, drainage Improvements, the installation of new traffic signals/street <br />lighting, landscaping and right-of-way acquisition, <br />Via Princessa Extension, Project Study Report Equivalent (PSRE), City of Santa Clarita, CA. Project <br />manager responsible for the preparation of a PSRE for a 3.0-mile extension of the Via Princessa <br />between Clathourne Lane and Rainbow Glen Drive. This new arterial roadway Is a critical link in the <br />City's transportation network. The PSRE was prepared in response to LA Metro's Call for Projects and <br />included alternative alignment studies, cost estimates, environmental analysis and traffic studies. <br />RESUMES -APPENDIX Page 4 <br />ANDERSON•PENNA <br />