Laserfiche WebLink
g r 4 TAIT & Associates, Inc, <br />I� Qn,Call Engineering Services <br />UNDERS'T'ANDING OF NEED <br />Option B Project Understanding -Mile One Street Project <br />Public Works engineering contracts require careful plodping, off ect'vi a communisation, and practse <br />exiicMt1on in order toevoid costly contract change orders or delays during the construction phase, In an <br />effort to ensure consistent and excellent services, TAIT employs our proven S step project management <br />protocol (Urldefstond4Flssignn) Plan-)Execyre->QA/QC) on each assigned contract. The scope and fee <br />for this proposal has been presented In this manner In order to show our full understanding and <br />commitment for the City's planned project. <br />5� ET' 1. 1NDT:RS T AND: <br />Understanding the City's Needs <br />To best understand the projects specifics needs, we first focus on what the City's overall needs are for <br />this contract and future contracts that will be required as part of the On -Call Contract, Basad on aur <br />review of the City's RPP, the following Is our understanding of the City needs on this and future projects <br />as compared to TAITs capabilities; <br />City ofS:ant naNeeds: <br />A ,..a full services design consultant with <br />local experlento who understands the <br />City's needs, standards, and design <br />requirements, <br />A ... A Consultant Who understand$ street <br />design as well as local pavement <br />rahabilltation needs and methodologies <br />for best implementation of the City's <br />project requirements. <br />A ..,a consultant to prepare detailed and <br />accurate roadway design PS&E. ' <br />A ,..a consultant who can maintain the <br />Proposed project schedule, <br />Y ..,a cost offoctive and high quality design. <br />Understanding the Project's Needs <br />The GAIT„T,am_Hps: <br />✓... gvorsoyears of extensive local Public <br />works design experience and understands <br />the City's needs on this contract. <br />✓ ...Assigned a design team and project <br />manager that have the extensive experience <br />Implementing PMP/Geotechnical <br />Investigations on projects. Further, Assigned <br />a qualified PM has worked for numerous <br />Cities on multiple types of contracts. <br />✓ ...successfully completed multiple recent <br />local and federally funded street PS&E design <br />contracts <br />✓ ... the staffing necessary to allocated the <br />required resources to meat and exceed the <br />City's scheduling needs <br />✓ ...placed and emphasis on design and <br />construction costs are emphasized <br />throughoutthe design and Is Included in <br />TAIT's QA/QC Program in order to ensure <br />maximum value Is retained by the City. <br />TAIT will conduct a cursory project review and researched exlsting conditions prior to conducting the <br />Project Kick-off meeting In order to ensure we have a good understanding of the required scope when <br />we Initially meet with the city to review our final Scope, Pee Proposal and a preliminary project Design <br />Schedule, The following pages provide a brief outline of our understanding of the sample 1 rojoct scone <br />based on the RPP described project, <br />(II TA IT Page 1 6 <br />