Sys. TAIT& Associates, Inc. <br />On -Call Engineering Services <br />Field Design 5invey <br />TAIT will conduct a localized fiold pickup topographic survey of the project site plus 2$ feet outside of <br />the roadway ROW to detail the existing topographic features and elevations. 'rem porary benchmarks <br />and basis of bearing data will be set If control is not readily available, The survey forthls project <br />assumes a half dayto tie down horizontal and vertical control and no more than one day of field <br />topographical survey conducted over two site visits . The 2nd field sUrvoy Occurs once the 65% design has <br />been completed In order to pick up supplemental fleldjoin informatlon, <br />Field work associated with TAIT's Field Design Surveys will be provide based on the current prevailing <br />Wage rates established by the state of California <br />Dellvarablesi <br />✓ Topographic, Survey Data <br />Temporary Benchmark & Basis of Bearing Notes, If required <br />✓ State required Prevailing Wage Documentation <br />Rase Mapping <br />For this 1000 -foot long street widening project TAIT is proposing to prepare the project's Base Map at a <br />horixontal.scale of Vnch equals '20'feet to provide a higher level of detail for edge conditions. The base <br />mapping for this project will be prepared using the following Items; <br />✓ Roadway Base Map (record based and supplemented with the field deslgn.,survey) <br />✓ MEMO Way (record based or GIs based R/W, If available from the city) <br />✓ Utility (record based line work using utility Atlas maps and other record drawings) <br />✓ Google Maps street view supplement by TAIT Site Walk field notes and photographs <br />All base maps will be prepared in accordance with the City's project needs and will identify the project <br />limits and existing features which will be Impacted by the proposed Improvements, <br />Dellverables: <br />✓ 20 -scale Base Map <br />Utility information Requests qnd Coordination <br />TAIT wlll prepare three utility notices as part of this task as described below; <br />V Utility Notice: This sub -task Includes the hours associated with the Initial utllity research and <br />the Issue of notices to obtain record data. TAIT will compile and track all responses In a utility <br />tracking matrix and will conducts follow ups with all non-responsive utilities. <br />end Utjlity Nottea; This sub -task Includes the hours ossoclated with the preparation and <br />distribution of the 244 utility notice per RFP requirements, <br />Final UtIIIty jVotlre; This sub -task Includes the hours associated with the preparation and <br />distribution of the 314 utility notice per RFP requirements, <br />Deliverables; <br />✓ Utility Information Matrix <br />✓ Utility Coordination Log & Records <br />✓ 1s,, 2nd & Final Utility Notices <br />Geotechnicallnvestdgations <br />TAIT will retain GMU, a Geotechnical Engineering firm, to serve as the project's geotechnical sub - <br />consultant and conduct the necessary field investigations to determine the project requlrements which <br />may Include, but not be limited to, subgrade evaluation and development of pavement structural <br />sections recommendations, <br />.TAIT. Page 114 <br />