My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TAIT & ASSOCIATES, INC.
Clerk
>
Contracts / Agreements
>
T
>
TAIT & ASSOCIATES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2018 3:56:55 PM
Creation date
7/17/2018 2:52:30 PM
Metadata
Fields
Template:
Contracts
Company Name
TAIT & ASSOCIATES, INC.
Contract #
A-2018-159-06
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
9/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TAIT & Associates, Inc, <br />On -Call Engineering Services <br />City of Diamond Bar <br />Ms. Kimberly Young, PE <br />(909)839-7044 <br />21810 Copley Drive <br />Diamond Bar, CA 91765 <br />Bre ects, Reagan & Peterson Pork Parking Cot <br />Rehabilitation, and <br />Cltywide Comprehensive Drainage Analysis <br />and CIP Design <br />County of Orange <br />James Campbell <br />(716}836-3767 <br />938 W. Santa Ana Blvd,, Suite 164 <br />Santa Ana, CA 92701 <br />ro ects; Site Feasibility Studles for reuse <br />County's existing properties, Site Planning and <br />Deslgn ferCounty's 100 -Acre Development <br />Plan and Alton Parcel Development Plan. <br />SCOPE OF SERVICES AND SCHEDULE <br />�G <br />Option $ Scope of Services --Mile One Street Project ^� <br />TWr takes no exceptions to the City's proposed scope of work. Based on our review of the City's RFP, <br />and project site, the following is our proposed scope of work far successfully completingthe City's <br />o <br />p <br />design contract, In order to sl npl.lfythe RFP review process, all sub -tasks have been organized and <br />Included within the RPP's stated work Items, <br />' <br />nr <br />idelt-offueetinrd <br />After receiving, notice of the award of the project from the CItyTAIT will Initiate our services in fully <br />developing a detailed understanding of the project scope. Initial design recommendations, field walk <br />observations, design parameters and project schedule will be discussed at the kick-off meeting in order <br />to ensure the design is processed per the City's requirements. <br />Doliverahles; <br />u <br />✓ Meeting Agenda & Minutes <br />✓ UpdetedProject Schedule <br />pp <br />Records Research & Design Pieid Walk <br />n <br />Btocoxkis Resgarc� BQmpllatiop <br />B <br />This sub -task Includes all hours necessary to conduct on line research and to coordinate with City and <br />G <br />County staff In order to obtain existing roadway, right of way and any sub -surface records. <br />DFleid Waij<, <br />u <br />This sub -task Includes field review to observe and document the existing conditions of the pavement, <br />curb and gutter, parkway, curb ramp and all other anticipated work Items. Existing darnaged curbs and <br />' <br />sidewalk will be noted. The existing curb ramps located at the existing Intersections at the project (Units <br />H <br />along with any other within the project limits will be reviewed for existing grades, Ilp condition and <br />gutter conditions and the presence of truncated domes. Existing condition photos will be taken of along <br />the project limits In order to assist the Design team and aid the City In construction coordination to <br />J <br />verify any existing damage to private or public facilities. <br />Deliverables; <br />uJ <br />✓ Compiled Existing Records (Design Files) <br />✓ Field Notes & Photos <br />nts <br />�I TAIT Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.