Laserfiche WebLink
Monterey Park Marketplace Site Development, Monterey Park Retail partners, LLC/City of Monterey <br />Park, Design Englnear/Project Coordinator, 2015 <br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners; LLC for the design of a <br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of <br />p <br />TAIT & Associates, Inc.,, <br />1;6 <br />On -Call Engineering services <br />project involves three geotechnical analysis. The geotechnical analysis Included recommendations for <br />Bentley Microstatlon and Geopak software was prlmarliy used in the design and preparation of plans.' <br />as <br />The projectwas directed by the North Dakota Departmentol'Ttensportatlon• n <br />„ <br />Adams Hili Water Main Replacement Project, Glendale Water and Power, Design Engineer, 2014 <br />j <br />The Adams Hill water main replacement project included six phases, 1B streets, and approximately 8 <br />00 <br />10,620 linear feet of water line that was designed to replace existing service pipe mains with ductile Iron I, <br />I <br />pipe. The project Included now services, hydrants, Inverts, tle-Ins, and other appurtenances. As well, the <br />i <br />project Included different pressure zones and the Installation of a divislon gate. Department of Public AD <br />l <br />Health waiver exhibits were prepared for select non -potable and water crossings, The project Included v L <br />a community outreach meetings, service survey eoordlnatlon, as well as detailed final As-Bulit <br />submittals. <br />G <br />Freeman Ave, Water Line Improvement Projects, Golden State Water Company, Project Design <br />Monterey Park Marketplace Site Development, Monterey Park Retail partners, LLC/City of Monterey <br />Park, Design Englnear/Project Coordinator, 2015 <br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners; LLC for the design of a <br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of <br />p <br />the development Includes slope stabllizatlon, retaining wall design, street Improvement design, utility <br />1;6 <br />Installation, overall site development, and over 400,000 cubic yards of dirt removal and regrading. The <br />project involves three geotechnical analysis. The geotechnical analysis Included recommendations for <br />the design on arid rearthe, landfill; for the slope stabilliation throughoutthe site] and for the overall site <br />as <br />development and construction, The project utillzed detailed retaining wall designs and In some areas, <br />„ <br />pile designs.'rhese retaining walls and pile designs were specially designed near SCF. facilities and <br />j <br />towers, Unique construction equipment has been detailed out and coordinated for this construction, <br />00 <br />Foothill Water Line Improvemont Projects, Golden State Water. Company, Design_BngMeer, 2019 <br />„s <br />The Foothill Improvements Included six projects that were designed to replace existing service pipe <br />mains with B" ductile Iron pipe. One of the six projects Included replacement of the transmission line <br />l <br />and reconnection to three existing wells. The total pipe replacement was approximately 13,20011near <br />feet. Multiple agencies reviewed the design plans, including City of San Dimas, City of Claremont, City of <br />Arcadia and the County of Los Angeles in addition to Golden State Water. <br />G <br />Freeman Ave, Water Line Improvement Projects, Golden State Water Company, Project Design <br />Engineer, 2013 <br />f <br />ti <br />The Freeman Avenue Water Llne Improvement included approximately 3600 linear feet of water line <br />that was designed to replace existing service pipe mains with g" ductile Iron pipe. The project Included <br />new services, hydrants, Inverts, tie•Ins, and other appurtenances. Department of Public Health waiver <br />Y <br />y <br />exhibits were prepared to the satisfaction of Golden State Water Company for select non -potable and <br />water crossings, <br />f <br />Normandie Ave. Water Line Improvements, Golden State Water Company, Design Engineer, 2013 <br />L <br />The project encompassed the planning and design for a 12" water main replacement In Normandle Ave, <br />in the County of Los Angeles, approximately 1400' linear feet, Project Included new services, hydrants,14 <br />u <br />Inverts, tle-Ins and other appurtenances. Exlsting 14" pipe was designed for abandonment. Department <br />of Public Health we Iver exhibits were prepared to the satisfaction of Golden State Water Company for <br />select non•potablo and water crossings. GWSC project engineer; Conde Ventura. <br />p <br />Appendix I Pape 9 <br />�� TAIT,...,.., [,L <br />