Monterey Park Marketplace Site Development, Monterey Park Retail partners, LLC/City of Monterey
<br />Park, Design Englnear/Project Coordinator, 2015
<br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners; LLC for the design of a
<br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of
<br />p
<br />TAIT & Associates, Inc.,,
<br />1;6
<br />On -Call Engineering services
<br />project involves three geotechnical analysis. The geotechnical analysis Included recommendations for
<br />Bentley Microstatlon and Geopak software was prlmarliy used in the design and preparation of plans.'
<br />as
<br />The projectwas directed by the North Dakota Departmentol'Ttensportatlon• n
<br />„
<br />Adams Hili Water Main Replacement Project, Glendale Water and Power, Design Engineer, 2014
<br />j
<br />The Adams Hill water main replacement project included six phases, 1B streets, and approximately 8
<br />00
<br />10,620 linear feet of water line that was designed to replace existing service pipe mains with ductile Iron I,
<br />I
<br />pipe. The project Included now services, hydrants, Inverts, tle-Ins, and other appurtenances. As well, the
<br />i
<br />project Included different pressure zones and the Installation of a divislon gate. Department of Public AD
<br />l
<br />Health waiver exhibits were prepared for select non -potable and water crossings, The project Included v L
<br />a community outreach meetings, service survey eoordlnatlon, as well as detailed final As-Bulit
<br />submittals.
<br />G
<br />Freeman Ave, Water Line Improvement Projects, Golden State Water Company, Project Design
<br />Monterey Park Marketplace Site Development, Monterey Park Retail partners, LLC/City of Monterey
<br />Park, Design Englnear/Project Coordinator, 2015
<br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners; LLC for the design of a
<br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of
<br />p
<br />the development Includes slope stabllizatlon, retaining wall design, street Improvement design, utility
<br />1;6
<br />Installation, overall site development, and over 400,000 cubic yards of dirt removal and regrading. The
<br />project involves three geotechnical analysis. The geotechnical analysis Included recommendations for
<br />the design on arid rearthe, landfill; for the slope stabilliation throughoutthe site] and for the overall site
<br />as
<br />development and construction, The project utillzed detailed retaining wall designs and In some areas,
<br />„
<br />pile designs.'rhese retaining walls and pile designs were specially designed near SCF. facilities and
<br />j
<br />towers, Unique construction equipment has been detailed out and coordinated for this construction,
<br />00
<br />Foothill Water Line Improvemont Projects, Golden State Water. Company, Design_BngMeer, 2019
<br />„s
<br />The Foothill Improvements Included six projects that were designed to replace existing service pipe
<br />mains with B" ductile Iron pipe. One of the six projects Included replacement of the transmission line
<br />l
<br />and reconnection to three existing wells. The total pipe replacement was approximately 13,20011near
<br />feet. Multiple agencies reviewed the design plans, including City of San Dimas, City of Claremont, City of
<br />Arcadia and the County of Los Angeles in addition to Golden State Water.
<br />G
<br />Freeman Ave, Water Line Improvement Projects, Golden State Water Company, Project Design
<br />Engineer, 2013
<br />f
<br />ti
<br />The Freeman Avenue Water Llne Improvement included approximately 3600 linear feet of water line
<br />that was designed to replace existing service pipe mains with g" ductile Iron pipe. The project Included
<br />new services, hydrants, Inverts, tie•Ins, and other appurtenances. Department of Public Health waiver
<br />Y
<br />y
<br />exhibits were prepared to the satisfaction of Golden State Water Company for select non -potable and
<br />water crossings,
<br />f
<br />Normandie Ave. Water Line Improvements, Golden State Water Company, Design Engineer, 2013
<br />L
<br />The project encompassed the planning and design for a 12" water main replacement In Normandle Ave,
<br />in the County of Los Angeles, approximately 1400' linear feet, Project Included new services, hydrants,14
<br />u
<br />Inverts, tle-Ins and other appurtenances. Exlsting 14" pipe was designed for abandonment. Department
<br />of Public Health we Iver exhibits were prepared to the satisfaction of Golden State Water Company for
<br />select non•potablo and water crossings. GWSC project engineer; Conde Ventura.