<br />Samantha A. Wahiforth, PE
<br />PROJECT ENGINEER
<br />Ms, Wohlfarth has professional experience that includes the preparation of
<br />grading plans, water main replacement plans, storm drain plans and drainage
<br />reports, sewer plans, cost estimates and storm water management reports for
<br />public and private developments throughoutSouthern Caiifornla, Western
<br />Washington, and North Dakota, Fier projectexperience also Includes the
<br />preparation of storm water quality reports such as SWPPP, WQMP, SUSMP and
<br />LID as mandated by the state and local inunlcipalitles, Ms, McGee has technical
<br />knowledge with'multiple software programs Including AutoCAD 2014, Civil 3D,
<br />Land Desktop, Microstatlon, GeoPak, WWHM2012, RetalnPro, and additional
<br />specialty programs,
<br />Beaudry Terrace Water Main Replacement Project, Glendale Water and power,
<br />Project Design Engineer, 2014
<br />The Beaudry Terrace water main replacement project, included four phases, six.
<br />streets, and approximately 5,300 linear feet of water line that was designed to
<br />replace existing service pipe mains with ductile iron pipe. The project Included
<br />new services, hydrants, Inverts, tle-ins, and other appurtenances, Department of
<br />Public Health waiver exhibits were prepared for select non -potable and water
<br />crossings. The project Included a community outreach meetings, service survey
<br />coordination, as well as detailed final As -Built submittals.
<br />Sllverado Campus C9nVOYSlon, County of orange, Project Engineer, 2016-
<br />Present
<br />TAIT's current task order assignment with OC Parks Includes preparing plans for
<br />the demolition of several existing campus structures with the conversion of the
<br />former classrooms and office space Into a County Library, offices for County Park
<br />staff, and community meeting rooms that cover 3500 square feet of usable
<br />enclosed space, Site work in the Initial phase will consist of Implementing Code-
<br />reclul'red ADA Improvements for public access at the campus and for public
<br />restrooms, upgrading of the existing parking lot, and provisions to provide
<br />security lightingfor night-time use of the facility.
<br />State Street (Highway 83), North Dakota Department of Tennsportation,
<br />Bismarck, North Dakota, Design Engineer, 2014
<br />The State Street Improvement project consisted of adding, extending, and
<br />modifying left and right turn lanes, and other existing geometry along the 1,6
<br />mile long road in Bismarck, ND. The project Improved traffic flow, reduced
<br />turning movement conflict points, and Improved driver expectancy. The project
<br />Included the survey, right of way, utility coordination, drainage midles and
<br />Improvements, and layout and design of the street, sidewalk, and geometry.