Laserfiche WebLink
r FAIT & Associates, Inc, <br />On�Call Engineering Services <br />B'$. .-Civil Engineering <br />Valparaiso University <br />Valparaiso, IN, 2012 <br />Year of TAIT Toam <br />Enlistment <br />'2012 <br />Total Experience <br />Certifications <br />Professional Engineer <br />California No, 86126 <br />Samantha A. Wahiforth, PE <br />PROJECT ENGINEER <br />Ms, Wohlfarth has professional experience that includes the preparation of <br />grading plans, water main replacement plans, storm drain plans and drainage <br />reports, sewer plans, cost estimates and storm water management reports for <br />public and private developments throughoutSouthern Caiifornla, Western <br />Washington, and North Dakota, Fier projectexperience also Includes the <br />preparation of storm water quality reports such as SWPPP, WQMP, SUSMP and <br />LID as mandated by the state and local inunlcipalitles, Ms, McGee has technical <br />knowledge with'multiple software programs Including AutoCAD 2014, Civil 3D, <br />Land Desktop, Microstatlon, GeoPak, WWHM2012, RetalnPro, and additional <br />specialty programs, <br />Beaudry Terrace Water Main Replacement Project, Glendale Water and power, <br />Project Design Engineer, 2014 <br />The Beaudry Terrace water main replacement project, included four phases, six. <br />streets, and approximately 5,300 linear feet of water line that was designed to <br />replace existing service pipe mains with ductile iron pipe. The project Included <br />new services, hydrants, Inverts, tle-ins, and other appurtenances, Department of <br />Public Health waiver exhibits were prepared for select non -potable and water <br />crossings. The project Included a community outreach meetings, service survey <br />coordination, as well as detailed final As -Built submittals. <br />Sllverado Campus C9nVOYSlon, County of orange, Project Engineer, 2016- <br />Present <br />TAIT's current task order assignment with OC Parks Includes preparing plans for <br />the demolition of several existing campus structures with the conversion of the <br />former classrooms and office space Into a County Library, offices for County Park <br />staff, and community meeting rooms that cover 3500 square feet of usable <br />enclosed space, Site work in the Initial phase will consist of Implementing Code- <br />reclul'red ADA Improvements for public access at the campus and for public <br />restrooms, upgrading of the existing parking lot, and provisions to provide <br />security lightingfor night-time use of the facility. <br />State Street (Highway 83), North Dakota Department of Tennsportation, <br />Bismarck, North Dakota, Design Engineer, 2014 <br />The State Street Improvement project consisted of adding, extending, and <br />modifying left and right turn lanes, and other existing geometry along the 1,6 <br />mile long road in Bismarck, ND. The project Improved traffic flow, reduced <br />turning movement conflict points, and Improved driver expectancy. The project <br />Included the survey, right of way, utility coordination, drainage midles and <br />Improvements, and layout and design of the street, sidewalk, and geometry. <br />Appendix I Pago 8 <br />lI TAIT <br />