Laserfiche WebLink
TAiT & Associates, Inc, <br />On -Call Engineering Servlees <br />Nicholas Flores <br />a I <br />cFlapasraroxrr <br />Nicholas Is a CAD Designerwith more than a decade of professional experience <br />on projects ranging from private and puklic colleges, hospitals, U,S, embassies, <br />6? j <br />pedestrian plazas, streetscapes, libraries, airport, museums, and private <br />r <br />i <br />residences. He specfallzes In 30 design, BIM coordination, and creating and <br />n <br />Education <br />maintaining construction documents following project and jurisdictional <br />i <br />AS DraftingTechnologles, <br />standards. <br />High -Tech Institute, <br />The Commons at Quartz Hill, City of Lancaster • CAD Designer, 2015 -Present <br />Phoenix, AZ <br />Nick Is currently the CAD Designer for the 40 -acre retell center that Includes an <br />c <br />Year ofTAITTeam <br />185,000 square -foot Walmart Supercenter, 14 outparcels and over $,7 million of <br />R <br />Enlistment <br />off-site Improvements, He worked on designing and preparing plans for street <br />y <br />2016 <br />sections for lane widening and median Improvement for W Ave Land 60th St W <br />and street sectlons for the new Ave IW2, east of 60th St. The off-site <br />II <br />Total Experience <br />Improvements Include approximately one mlle of roadway improvements, <br />13 <br />construction of two new traffic signals and modification to one existing traffic <br />signal, construction of 1500 LF of City master plan 60 to 72 -Inch storm drain line, <br />mP <br />and approximately 1.5 miles on new LACWD water lines Improvements, The <br />sa <br />project also Includes undergounding of nearly 1,500 linear feet of existing <br />n s <br />Southern California Edison (SCE) distribution lines and protection of existing SCE <br />c. <br />transmission lines. The Intersection of Avenue L and 60iB Street Wost was <br />designed to accommodate an existing SCE' straettransmission pole within the <br />lntersection's roadway Improvements; Plan's standards, details, specification <br />" <br />and design criteria were In accordance with public works standards and to the <br />satisfaction of city pian chockers, <br />.,a <br />? <br />ACC, Phase II Grade Separations (Fullerton Road/Gale Avenue), City of <br />Industry, CA -CAD Designer, 7.015 <br />G <br />Nick was responsible for onsite regrading, drainage analysts, utility redesign, <br />>i <br />f <br />final paving layout, and 3D model coordination for 5 sites (a bank, fast food <br />business, an office building, and 2 industrial where houses) at the intersections <br />„ <br />of Fullerton (toad, Gale Avenue, and Railroad Street, Fullerton Road is being <br />regraded to pass under existing Union Pacific Railroad at the same time the <br />E <br />railroad Is being bridged to gain additional underpass clearance, Additional <br />e <br />Improvements Nick coordinated with, and provided support for, include 2 street <br />Intersections, an 80 -foot wide railroad embankment regrade, 2 bridging <br />o <br />structures, 60 -inch and 72 -Inch storm drain realignments and all gravity utilities <br />under the regraded streets, <br />Broad Museum (Downtown Los Angeles — Grand Ave/Hope St), Los Angeles, <br />.s <br />CA. CAD Designer, 2013 <br />Nick was responsible for generating and coordinating on-site constructlon <br />documents and off-site street Improvement plans Improving all streets <br />Wu <br />Appendix I Page 15 <br />TAIT <br />li <br />