Laserfiche WebLink
CryofftntaAna W <br />Tyrone peter, PE <br />Project Manager <br />Profile Suminary <br />Sducation: ES, Engineering and Civil Engineering, Tamil Nadu College of Engineering <br />Civil Engineering, Murugappa Polytechnic_ <br />Registration: Civil Engineer, California No. 81888 <br />Affiliations: American Public Works Association <br />American Society of Civil Engineers <br />Experience: 11 Years <br />Mr, Tyrone Peter is an accomplished civil engineer for multi-disoipline and mufti-agenoy Infrastructure pro- L. <br />jects and is known for providing innovative, quality engineering services to ensure project delivery within <br />budget and schedule. As the project manager for the City's On Call Engineering Services project, with quali- <br />fled staff and resources, he will be responsible for successful project delivery, <br />Mr. Peter's 11 plus years of experience managing and designing all types of public works projects provide a , •t <br />solid foundation to understand what Is needed to deliver a successful project and make him the perfect fit <br />for overseeing the entire project as well as specific civil engineering tasks His comprehensive experience <br />includes design Metals highway, new street, street widening, street realignment, pavement rehabilitation, <br />light rail and railroad, grade separation, flood control facility, water, and sewer projects. Mr. Peter has super- r' <br />vised feasibility study, project study report, project report, construction document preparation as well as W .. <br />grade certification issuance, construction administration, and construction inspection. <br />Relevant Project Experience f " <br />Emerald Say Main Gats Safety improvements, Emerald Bay Service District, Laguna Beach, Califor- J <br />necessary reports, plans, specifications, and estimates documentation. Performance of these responsibili- <br />ties required expertise and knowledge In street, traffic, drainage, structural, and pavement design, ADA <br />i.., <br />standards, public outreach, pedestrian safety, and water quality. Wllldan provided Civil and traffic engineer- <br />ing design and other appurtenant services for safety improvements at the main gate entrance. Improve- <br />" <br />ments Involved road widening, guardhouse relocation and reconstruction; grading to accommodate the <br />�•� <br />roadway widening and landscaping; installing upgraded lighting, ADA-compllant curbs and ramps, and re- <br />talning and monument walls; widening the right -turn pocket and installing a median; and Installing street <br />striping and signage within Caltrans' right-of-way. <br />Firestone 18culavard Capacity Enhancement, City of South Gate, California. Project Manager responsi- <br />ble for overall project management and oversight required for the corridor improvements from Alameda <br />Street to Hunt Avenue. Performance of these responsibilities required expertise and knowledge In street <br />j <br />and pavement design, ADA standards, public outreach, environmental documentation, Careen Street design, <br />and watershed management planning. The improvements involved Increasing traffic capacity by reconfigur• <br />Ing the roadway from four to six lanes; pavement rehabilitation; landscape and hardscape medians; median <br />lighting; sidewalk, curb and gutter, and driveway approach reconstructlon; ADA -compliant ramps; parkway <br />trees; artistic elements, corridor entrance monument; bus shelter and bus turnouts; and traffic signal modifi- <br />cations, Services provided Included civil, traffic, pavement, and drainage engineering; landscape architec- <br />d <br />ture, survey and right-of-way engineering; and utility relocation. <br />Orange Line Extension, Brut000 Engineering & Construction, Inc,/Los Angeles County Metropolitan <br />Transportation Authority, Los Angeles, California, Civil Engineering Task Leader responsible for prcvid- <br />Ing and overseeing all civil improvement design required for the design/build of the MCL extension from the <br />Chatsworth Station toCanoga Station in the San Fernando Valley along Canoga Avenue. Performance of <br />^. <br />these responsibilities required expertise and knowledge In Intersection design, bike lanes, ADA standards, <br />street geometric design, light-rail standards, parking lot and roadside safety design. Willdan prepared plans, <br />specifications, and estimate for street widening, raised landscaped medians, irrigation system, ADA access <br />curb ramps, bicycle paths, park-and-ride and parking lot facilities, traffic signal modifications, communloa• <br />tion conduits, and signing and striping. Three stations were constructed or reconstructed. <br />ProposolforOn-callEnglneering, <br />Comprelrenslve. Innovative, Yruetod' RFP No. 17.088 <br />4, J <br />