CIt of Santa Ana
<br />Salvador Lopez
<br />Environmental Task Leader
<br />Profile Summary
<br />Education: BS, Urban and Regional Planning, California State Polytechnic University, Pomona
<br />Experience: 18 Years W.•
<br />Mr. Salvador Lopez has more than 18 years of planning experience that spans all aspects of planning, in. j
<br />7
<br />cluding current, advance, and environmental planning, as well as active transportation planning and housing
<br />and community development. He Is highly experienced at managing multl-disclpilnary teams in the develop-
<br />ment of policy and long-range planning documents for public agencies.
<br />Relevant Project Experlonoe
<br />�.,.
<br />Firestone Boulevard Capacity Enhancement, City of South Gate, Californla, Environmental Compli-
<br />ance Task Leader responsible for providing and overseeing all environmental services required for the corri-
<br />dor Improvements from Alameda Street to Hunt Avenue. Performance of these responsibilities requires ex-
<br />L
<br />pertise and knowledge In City and County standards, policies, and procedures; general plan practices; and
<br />NEPA/CEQA conformance. The improvements involved roadway widening from four to six lanes; pavement
<br />i
<br />rehabilitation; landscape and hardscaps medians; median lighting; sidewalk, curb and gutter, and driveway 1
<br />approach reconstruction; ADA -compliant ramps; parkway trees; artistio elements, corridor entrance monu-
<br />ment; bus shelter and bus turnouts; and traffic signal modifications. Services provided included civil, traffio, r'
<br />pavement, and drainage engineering; landscape architecture, survey and right-of-way engineering; and util-
<br />hy relocation.
<br />Garfield Avenue Corridor Improvements, City of Paramount, California. Environmental Compliance
<br />"
<br />Task Leader responsible for providing and overseeing all environmental services required for street im-
<br />modate a third lane In each direction; street resurfacing; two concrete intersections; concrete sidewalk, curb r1
<br />and gutter, and driveway approach reconstruction; catch basin construction; streetscape Improvements for L,
<br />raised landscaped medians and modifications to existing medians; two entry monument signs; and traffic
<br />signal modifications at nine locations along the Garfield Avenue corridor. Services Included civil, traffic, and ,
<br />drainage engineering; survey and mapping; utility relocation; landscape architecture; and pavement man-
<br />agement
<br />Lakewood Boulevard Regional Corridor Capacity Enhancement, City of Lakewood. Environmental
<br />Compliance Task Leader responsible for providing and overseeing all environmental services required for j
<br />complete streettgreen street Improvements between the north City limits and Del Amo Boulevard, Perfor-
<br />mance of these responsibilities requires expertise and knowledge in City and County standards, policies,
<br />and procedures; general pian practices; NEPA/CEQA conformanoe; complete streets; sustainabliity plan-
<br />ning; and low -impact development standards, Improvements involved street widening and median Improve- `
<br />msnts; Class II bike lanes in bath directions; turn lanes; landscape planting and Irrigation; overhead distribu-
<br />tion and transmission power undergrounding; sidewalk, curb and gutter, and driveway approach reoonstruc- I
<br />tion; street resurfacing; catch basin construction; storm water quality Improvements to comply with Green
<br />Streets policy; bike lookers, bus shelter, and traffic signal modifications. Services provided'Include civil, traf.
<br />filo, pavement, dralnags, and geotechnical engineering; landscape architecture, survey and right-of-way en-
<br />ginsering, and utility coordination and relocation. w a
<br />,,J
<br />v�1
<br />6:a
<br />Proposei for Ori Call Engineering, r'
<br />41W Comprehensive. Umovativa, Trusted. RFP No. 17.069
<br />l.f
<br />
|