City of Santa Ana
<br />Vanessa Muftoz, PE, TE, PTOE
<br />Traffic Engineering Task Leader
<br />Profile Summary
<br />Education: BS, Civil Engineering, California Polytechnic State University, Pomona
<br />1 Registration; Professional Traffic Operations Engineer
<br />Civil Engineer, California, No. 87688
<br />i Traffic Engineer, California, No. 2341
<br />Affiliations: City Traffic Engineers
<br />American Public Works Association
<br />Institute of Transportation Engineers
<br />Experlence: 18 Years
<br />Ms. Vanessa Mufloz Is an accomplished engineer with experience in multi -discipline and multi -agency traf-
<br />fic and transportation projects, She has supervised completion of over 1,000 projects, for a variety of large.
<br />to small-scale projects and has designed over 500 signalized intersections for client cities, outside agen-
<br />oles, and Caltrans. She Is responsible for analysis, coordination, and preparation of plans, specifications,
<br />and estimate for traffic signals, signing, striping, traffic control, flashing beacons, street lighting, Intercon-
<br />nect, parking lots, street widening and resurfacing projects.
<br />Ms. Muftoz has secured funding through the Safe Routes to School and Highway Safety Improvement Pro.
<br />gram (HSIP) grants and has managed projects that Include federal funds such as SRTS, HSIP, ARRA,
<br />$TIP., and STPL. She is extremely familiar with the Local Assistance Procedures Manual, has coordinated
<br />approvals of NEPA/CEQA, and understands procedures for allocation of construction funds and Issuance of
<br />the E-76 form.
<br />Relevant Project Experience
<br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Califor-
<br />nia. Project Manager/ Traffic Engineering Task Leader responsible for overall project management and
<br />oversight In addition to oversight of all traffic engineering services and preparing necessary reports, plans,
<br />specifications, end estimates documentation. Performance of these responsibilities requires expertise and
<br />knowledge In traffic signal design, traffic Impact analysis, street lighting, traffic signal Intra-communloatlon,
<br />and pedestrian safety, and vehicular Ingress/egress safety. Willdan provided ci I and traffic engineering de.
<br />.sign and other appurtenant services for safety improvements at the main gate entrance. Improvements in-
<br />vo[ved road widening, guardhouse relocation and reconstruction; grading to accommodate the roadway wid-
<br />ening and landscaping; Installing upgraded lighting, ADA-compilant curbs and ramps, and retaining and
<br />monument walls; widening the right -turn pocket and Installing a median; and Installing street striping and
<br />signage within Caltrans' right-of-way,
<br />1 Firestone Boulevard Capacity Enhancement, City of South Gate, California, Traffic Engineering Task
<br />Leader responsible for providing and overseeing all traffic engineering services required for the corridor im-
<br />provements from Alameda Street to Hunt Avenue. Performance of these responsibilities required expertise
<br />and knowledge in traffic signal design, traffic impact analysis, street lighting, and traffic signal intra-eommu-
<br />nicatlon. The Improvements Involved roadway widening from four to six lanes; pavement rehabilitation; land-
<br />scape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach recon-
<br />struction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monument; bus shelter
<br />and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, and
<br />drainage engineering; landscape architecture, survey and right-of-way engineering; and utility relocation.
<br />Proposal for On•Cal]Bngnsering, 1s
<br />4gr Comprehensive, Innovative, Trusted. RPP No, x.7.083
<br />
|