Laserfiche WebLink
City of Santa Ana <br />Vanessa Muftoz, PE, TE, PTOE <br />Traffic Engineering Task Leader <br />Profile Summary <br />Education: BS, Civil Engineering, California Polytechnic State University, Pomona <br />1 Registration; Professional Traffic Operations Engineer <br />Civil Engineer, California, No. 87688 <br />i Traffic Engineer, California, No. 2341 <br />Affiliations: City Traffic Engineers <br />American Public Works Association <br />Institute of Transportation Engineers <br />Experlence: 18 Years <br />Ms. Vanessa Mufloz Is an accomplished engineer with experience in multi -discipline and multi -agency traf- <br />fic and transportation projects, She has supervised completion of over 1,000 projects, for a variety of large. <br />to small-scale projects and has designed over 500 signalized intersections for client cities, outside agen- <br />oles, and Caltrans. She Is responsible for analysis, coordination, and preparation of plans, specifications, <br />and estimate for traffic signals, signing, striping, traffic control, flashing beacons, street lighting, Intercon- <br />nect, parking lots, street widening and resurfacing projects. <br />Ms. Muftoz has secured funding through the Safe Routes to School and Highway Safety Improvement Pro. <br />gram (HSIP) grants and has managed projects that Include federal funds such as SRTS, HSIP, ARRA, <br />$TIP., and STPL. She is extremely familiar with the Local Assistance Procedures Manual, has coordinated <br />approvals of NEPA/CEQA, and understands procedures for allocation of construction funds and Issuance of <br />the E-76 form. <br />Relevant Project Experience <br />Emerald Bay Main Gate Safety Improvements, Emerald Bay Service District, Laguna Beach, Califor- <br />nia. Project Manager/ Traffic Engineering Task Leader responsible for overall project management and <br />oversight In addition to oversight of all traffic engineering services and preparing necessary reports, plans, <br />specifications, end estimates documentation. Performance of these responsibilities requires expertise and <br />knowledge In traffic signal design, traffic Impact analysis, street lighting, traffic signal Intra-communloatlon, <br />and pedestrian safety, and vehicular Ingress/egress safety. Willdan provided ci I and traffic engineering de. <br />.sign and other appurtenant services for safety improvements at the main gate entrance. Improvements in- <br />vo[ved road widening, guardhouse relocation and reconstruction; grading to accommodate the roadway wid- <br />ening and landscaping; Installing upgraded lighting, ADA-compilant curbs and ramps, and retaining and <br />monument walls; widening the right -turn pocket and Installing a median; and Installing street striping and <br />signage within Caltrans' right-of-way, <br />1 Firestone Boulevard Capacity Enhancement, City of South Gate, California, Traffic Engineering Task <br />Leader responsible for providing and overseeing all traffic engineering services required for the corridor im- <br />provements from Alameda Street to Hunt Avenue. Performance of these responsibilities required expertise <br />and knowledge in traffic signal design, traffic impact analysis, street lighting, and traffic signal intra-eommu- <br />nicatlon. The Improvements Involved roadway widening from four to six lanes; pavement rehabilitation; land- <br />scape and hardscape medians; median lighting; sidewalk, curb and gutter, and driveway approach recon- <br />struction; ADA -compliant ramps; parkway trees; artistic elements, corridor entrance monument; bus shelter <br />and bus turnouts; and traffic signal modifications. Services provided included civil, traffic, pavement, and <br />drainage engineering; landscape architecture, survey and right-of-way engineering; and utility relocation. <br />Proposal for On•Cal]Bngnsering, 1s <br />4gr Comprehensive, Innovative, Trusted. RPP No, x.7.083 <br />