Laserfiche WebLink
City of Santa Ana <br />Understanding of Need <br />The City of Santa Ana's Public Works Agency is seeking experienced professional consultants to retain on as. <br />needed or on-call basis for various general engineering design and related supporting services involving public <br />facilities and Infrastructure needs. Additionally, the City's RFP contains two'tasks' to be addressed by selecting <br />either Option A, Option B or both A and B by providing representational scopes of work, schedule and fee. Be- <br />low Is our outline that demonstrates the understanding of the work to be provided. <br />Scope of Work <br />Per the RFP, the following is a representation of how Wilidan defines the scope for Water Resources projects <br />(Option A) and General Engineering design other than Water Resources (Option B). For Tasks that are largely <br />similar, such as Project Management, the scope has been combined for Option A and B as noted In following <br />Task headers, <br />Task 1 — Project Management -- Option A and Option ,B <br />Wllldan understands effective project management is a no- ® Task 1 Deliverables <br />oeseity to maintain project control. Because of this, Wllldan . Meeting schedules, attendance, rosters, <br />approaches each project with a Project Management Plan matrix, meeting agendas and minutes <br />(PMP). The PMP ldsntifles the project team, stakeholders, . Detailed project schedule <br />scope, potential project challenges, and establishes a QA(QC . Monthly project reports <br />plan, project tasks, deliverables, and milestones, The PMP <br />establishes regular meetings with City staff, utility companies and other participating agenoles, as required, to <br />discuss work progress, schedule, and related issues to exchange information, discuss and resolve Issues, and to <br />maintain progress of the project The PMP Is the overarching resource that ensures effective communication <br />and complete project control. In addition, Wllldan will dedicate a Project Manager to manage the performance of <br />the project Including, but not Ilmlted to, facilitating coordination between the design team, the City of Santa Ana, <br />utility companies, and other stakeholders directly affected by the proposed project. The Project Manager will su- <br />pervise, coordinate, monitor and review the project design for conformance with City standards, policies, and pro- <br />cedures and will be responsible for; <br />Maintaining continuous communication with City Project Manager, Including meetings to review the prelimi- <br />nary design and project status at 80-, 60-, and 100 -percent completion. <br />Providing monthly project status report, or as specified in the PMP. <br />overseeing project delivery targeting proposed schedule end minimizing project budget. <br />Wllldan will facilitate a pro -design meeting with City representatives to review the project In detail. Wiliden will <br />determine requirements and procedures for design, ongoing review, and coordination. In consultation with City <br />representatives, Wilidan will determine relevant Issues specific to the project, design standards, and funding Ilm• <br />Its. Progress meetings will be held monthly or more frequently If needed, with City staff, permitting agencies and <br />utility companies as needsd. <br />Task 2 — Agency and Utility Coordination — Option A and Option 6 <br />Subtask 2,01— Conditions Review, Option Ar Wllldan will review available well data to be provided by the <br />City of South Gate, including well completion and testing reports, well geophysical logs, well Inspection videos, <br />i hydraulic efficiency tests, water quality tests, and other pertinent information. Wllldan will use the Information pro. <br />vided by the City to prepare an assessment summary letter including discussion of the risks and benefits associ- <br />ated with alternative rehabilitation procedures. The summary letter will also identify if any additional testing is re- <br />quired prior to, or during well rehabilitation to fill data gaps or provide essential information. <br />Subtask 2.02 — Agency and Utility Coordination. Option A AND <br />Option B., Willdan will request utility atlases from utility companies Task l Ass Deliverables <br />known too operate and/or maintain facilities within theproject areas for v Well Assessment Summary Letter <br />4 p Meeting agendas and minutes <br />reference in the Improvement plans. Wilidan will conduct a utility 1nVes- . Utility notification letters <br />tigation to Identify utilities that will be impacted and will research prior • Utility matrix <br />rights to clearly Identify parties responsible for relocation of the affected <br />utilities. Wilidan will coordinate the utility improvements with the Identified utility companies, Including the Impacts <br />i to high-hazard/high-pressure facilities, <br />Perth$ City's Request for Proposal, coordination with utility companies will Include: <br />Prepare initial request for utility information such as atlas sheets, mapping, or as -built plans and develop utll- <br />I,. ! Itybase map based upon information received from utility companies. <br />Proposal for On -Call 21 <br />camprahanslve, innovative, Trusted, RFP No. 17.083 <br />