City of Santa Ana
<br />Orange Line Extension
<br />Las Angeles Metropolitan Transit Authority/ Client Contact: Scott McConnell, Project Manager
<br />Brutoco Engineers and Constructors, Inc. (213) 922-7257
<br />One Gateway Plaza Project Pates: 2010 to 2012
<br />Los Angeles, CA 90012 Project Teem: Tyrone Peter, David Knell, Johnny
<br />Ghazal John Hidal o Vaness M ri
<br />The design -build MOL extension between Chats-
<br />Mohsen Rahlmian, 9Ro. ss Khlabaani,u 021
<br />Ray
<br />worth and Canoga Stations in the San Fernando Val-
<br />Wellington, Michael Bustos, Kenneth
<br />ley along Canoga Avenue is a dedicated roadway
<br />Krieger, Randy Shadowen, Bemardo
<br />consisting of two 14 -foot travel lanes. At stations, the
<br />Reyes, Susana Barrlentos, Bryan Ngu.
<br />busway lane widens to provide passing lanes for
<br />yen, Sheila McCracken, Robert Burch,
<br />buses. The 28 -foot wide roadway is within the Metro
<br />Chris Stone, Edward Cox, Christopher
<br />right-of-way and is 100 feet wide in most locations —
<br />Kelley, Ryan Moore
<br />providing adequate room for landscaping as well as space for
<br />fences, privacy walls, drainage facilities, and a bikeway/pedes-
<br />trian path adjacent to the busway.
<br />The busway was designed for future conversion to Ilght-rail
<br />transit service. A Class I bikeway that includes a pedestrian
<br />path was designed and constructed within the Metro right-of-
<br />way from the terminus of the existing MOL bikeway/pedestrian
<br />path at Canoga Avenue, north to Lassen Street and along Las-
<br />sen Street to connect within the existing bike path on the east
<br />side of the existing Browns Creek drainage channel. Street and
<br />pedestrian crossings were improved on nine streets where the
<br />busway intersects the crossing street. A bus parking lot was
<br />constructed on -the Metro=owned.property_at,Marilla..Street_and..
<br />Owensmouth Avenue. Park-and-ride facilities were included at
<br />three stations, providing approximately 1,074 additional park-
<br />ing spaces. Design -build solutions and design creativity re-
<br />duced MTA's construction estimate and saved over $61 million
<br />In construction costs.
<br />Emerald Bay Main Gate Safety Improvements
<br />Emerald Bay Service District Client Contact., Michael Dunbar, General Manager
<br />600 Emerald Bay (949) 494.8572
<br />Laguna Beach, CA 92651 Project Dates: 2015 to 2017
<br />Willdan is providing civil and traffic engineering de. Project Team: Tyrone Peter, David Knell, Johnny
<br />sign and other appurtenant services for safety im- Ghazal, Gary Gordon, Vanessa Munoz, Mohsen Rehim-
<br />provements connected with the community's main Ian, Ross Khiabani, Ray Wellington, Michael Bustos,
<br />gate entrance. The improvements involve widening Kenneth Krieger, Randy Shadowen, Bernardo Reyes,
<br />Shamrock Road 25 feet, reconstructing the entrance Susana Barrlentos, Sheila McCracken, Robert Burch, Ed.
<br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan
<br />Ing location; grading Shamrock Road and the adja• Moore
<br />cent slope to accommodate the roadway widening and
<br />desired landscaping; installing upgraded lighting; In- +;}
<br />stalling ADA -compliant curbs, ramps and retaining/mon-
<br />ument walls; widening the right -turn pocket and in-
<br />stalling a 175 -foot -long raised median at the intersec-
<br />tion of Pacific Coast Highway and Shamrock Road; mit-
<br />igating soil with 20018 -inch diameter drilled displace-'
<br />ment columns, and installing street striping and signage
<br />within Caltrans' right-of-way. The project required processing Caltrans encroachment permit and County of
<br />Orange general grading permit packages. Widening Shamrock Road provides an additional lane in each
<br />E;; Vi Proposal for On -Call Engineering,
<br />t Comprehensive. Innovative. Trusted.
<br />RFP No. 17.083
<br />ry
<br />n„
<br />2,�
<br />Measure R Project. Officials Celebrate Completion or Meta
<br />Orange Line E%tenslon to Chatsworth Ahead of Schedule.
<br />Under Budget
<br />.. ..wW W,.�..Mw..usw.u.+W1,Y.NdF._........... ...-..
<br />`mow �:•.�...r:.,�;.~.M�.�.:w.
<br />1.ITry1
<br />Y I.W.ML'�.._T�IS�iC1•�1.'�1.1LL11�L.�
<br />Mwrm.n,m W,unu�vm .µ..n
<br />N�;rrrw.;.n
<br />Emerald Bay Service District Client Contact., Michael Dunbar, General Manager
<br />600 Emerald Bay (949) 494.8572
<br />Laguna Beach, CA 92651 Project Dates: 2015 to 2017
<br />Willdan is providing civil and traffic engineering de. Project Team: Tyrone Peter, David Knell, Johnny
<br />sign and other appurtenant services for safety im- Ghazal, Gary Gordon, Vanessa Munoz, Mohsen Rehim-
<br />provements connected with the community's main Ian, Ross Khiabani, Ray Wellington, Michael Bustos,
<br />gate entrance. The improvements involve widening Kenneth Krieger, Randy Shadowen, Bernardo Reyes,
<br />Shamrock Road 25 feet, reconstructing the entrance Susana Barrlentos, Sheila McCracken, Robert Burch, Ed.
<br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan
<br />Ing location; grading Shamrock Road and the adja• Moore
<br />cent slope to accommodate the roadway widening and
<br />desired landscaping; installing upgraded lighting; In- +;}
<br />stalling ADA -compliant curbs, ramps and retaining/mon-
<br />ument walls; widening the right -turn pocket and in-
<br />stalling a 175 -foot -long raised median at the intersec-
<br />tion of Pacific Coast Highway and Shamrock Road; mit-
<br />igating soil with 20018 -inch diameter drilled displace-'
<br />ment columns, and installing street striping and signage
<br />within Caltrans' right-of-way. The project required processing Caltrans encroachment permit and County of
<br />Orange general grading permit packages. Widening Shamrock Road provides an additional lane in each
<br />E;; Vi Proposal for On -Call Engineering,
<br />t Comprehensive. Innovative. Trusted.
<br />RFP No. 17.083
<br />ry
<br />n„
<br />2,�
<br />
|