City of Santa Ana <br />Orange Line Extension <br />Las Angeles Metropolitan Transit Authority/ Client Contact: Scott McConnell, Project Manager <br />Brutoco Engineers and Constructors, Inc. (213) 922-7257 <br />One Gateway Plaza Project Pates: 2010 to 2012 <br />Los Angeles, CA 90012 Project Teem: Tyrone Peter, David Knell, Johnny <br />Ghazal John Hidal o Vaness M ri <br />The design -build MOL extension between Chats- <br />Mohsen Rahlmian, 9Ro. ss Khlabaani,u 021 <br />Ray <br />worth and Canoga Stations in the San Fernando Val- <br />Wellington, Michael Bustos, Kenneth <br />ley along Canoga Avenue is a dedicated roadway <br />Krieger, Randy Shadowen, Bemardo <br />consisting of two 14 -foot travel lanes. At stations, the <br />Reyes, Susana Barrlentos, Bryan Ngu. <br />busway lane widens to provide passing lanes for <br />yen, Sheila McCracken, Robert Burch, <br />buses. The 28 -foot wide roadway is within the Metro <br />Chris Stone, Edward Cox, Christopher <br />right-of-way and is 100 feet wide in most locations — <br />Kelley, Ryan Moore <br />providing adequate room for landscaping as well as space for <br />fences, privacy walls, drainage facilities, and a bikeway/pedes- <br />trian path adjacent to the busway. <br />The busway was designed for future conversion to Ilght-rail <br />transit service. A Class I bikeway that includes a pedestrian <br />path was designed and constructed within the Metro right-of- <br />way from the terminus of the existing MOL bikeway/pedestrian <br />path at Canoga Avenue, north to Lassen Street and along Las- <br />sen Street to connect within the existing bike path on the east <br />side of the existing Browns Creek drainage channel. Street and <br />pedestrian crossings were improved on nine streets where the <br />busway intersects the crossing street. A bus parking lot was <br />constructed on -the Metro=owned.property_at,Marilla..Street_and.. <br />Owensmouth Avenue. Park-and-ride facilities were included at <br />three stations, providing approximately 1,074 additional park- <br />ing spaces. Design -build solutions and design creativity re- <br />duced MTA's construction estimate and saved over $61 million <br />In construction costs. <br />Emerald Bay Main Gate Safety Improvements <br />Emerald Bay Service District Client Contact., Michael Dunbar, General Manager <br />600 Emerald Bay (949) 494.8572 <br />Laguna Beach, CA 92651 Project Dates: 2015 to 2017 <br />Willdan is providing civil and traffic engineering de. Project Team: Tyrone Peter, David Knell, Johnny <br />sign and other appurtenant services for safety im- Ghazal, Gary Gordon, Vanessa Munoz, Mohsen Rehim- <br />provements connected with the community's main Ian, Ross Khiabani, Ray Wellington, Michael Bustos, <br />gate entrance. The improvements involve widening Kenneth Krieger, Randy Shadowen, Bernardo Reyes, <br />Shamrock Road 25 feet, reconstructing the entrance Susana Barrlentos, Sheila McCracken, Robert Burch, Ed. <br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan <br />Ing location; grading Shamrock Road and the adja• Moore <br />cent slope to accommodate the roadway widening and <br />desired landscaping; installing upgraded lighting; In- +;} <br />stalling ADA -compliant curbs, ramps and retaining/mon- <br />ument walls; widening the right -turn pocket and in- <br />stalling a 175 -foot -long raised median at the intersec- <br />tion of Pacific Coast Highway and Shamrock Road; mit- <br />igating soil with 20018 -inch diameter drilled displace-' <br />ment columns, and installing street striping and signage <br />within Caltrans' right-of-way. The project required processing Caltrans encroachment permit and County of <br />Orange general grading permit packages. Widening Shamrock Road provides an additional lane in each <br />E;; Vi Proposal for On -Call Engineering, <br />t Comprehensive. Innovative. Trusted. <br />RFP No. 17.083 <br />ry <br />n„ <br />2,� <br />Measure R Project. Officials Celebrate Completion or Meta <br />Orange Line E%tenslon to Chatsworth Ahead of Schedule. <br />Under Budget <br />.. ..wW W,.�..Mw..usw.u.+W1,Y.NdF._........... ...-.. <br />`mow �:•.�...r:.,�;.~.M�.�.:w. <br />1.ITry1 <br />Y I.W.ML'�.._T�IS�iC1•�1.'�1.1LL11�L.� <br />Mwrm.n,m W,unu�vm .µ..n <br />N�;rrrw.;.n <br />Emerald Bay Service District Client Contact., Michael Dunbar, General Manager <br />600 Emerald Bay (949) 494.8572 <br />Laguna Beach, CA 92651 Project Dates: 2015 to 2017 <br />Willdan is providing civil and traffic engineering de. Project Team: Tyrone Peter, David Knell, Johnny <br />sign and other appurtenant services for safety im- Ghazal, Gary Gordon, Vanessa Munoz, Mohsen Rehim- <br />provements connected with the community's main Ian, Ross Khiabani, Ray Wellington, Michael Bustos, <br />gate entrance. The improvements involve widening Kenneth Krieger, Randy Shadowen, Bernardo Reyes, <br />Shamrock Road 25 feet, reconstructing the entrance Susana Barrlentos, Sheila McCracken, Robert Burch, Ed. <br />guardhouse approximately 40 feet north of the exist- ward Cox, Christopher Kelley, Kevin Custado, Ryan <br />Ing location; grading Shamrock Road and the adja• Moore <br />cent slope to accommodate the roadway widening and <br />desired landscaping; installing upgraded lighting; In- +;} <br />stalling ADA -compliant curbs, ramps and retaining/mon- <br />ument walls; widening the right -turn pocket and in- <br />stalling a 175 -foot -long raised median at the intersec- <br />tion of Pacific Coast Highway and Shamrock Road; mit- <br />igating soil with 20018 -inch diameter drilled displace-' <br />ment columns, and installing street striping and signage <br />within Caltrans' right-of-way. The project required processing Caltrans encroachment permit and County of <br />Orange general grading permit packages. Widening Shamrock Road provides an additional lane in each <br />E;; Vi Proposal for On -Call Engineering, <br />t Comprehensive. Innovative. Trusted. <br />RFP No. 17.083 <br />ry <br />n„ <br />2,� <br />