Laserfiche WebLink
City of Santa Ana <br />Relevant Project Experience <br />Wilidan has chosen the following representative summaries for completed projects that exemplify Willden's <br />extensive expertise and relation to the Scope of Work detailed In the RFP. <br />Firestone Boulevard Capacity Enhancement <br />City of South Gate <br />8650 California Avenue <br />South Gate, CA 90280 <br />Wilidan is providing civil and traffic engineering de- <br />sign and other appurtenant services for street im- <br />provements from Alameda Street to Hunt Avenue <br />funded through Metro and local funds. The project Is <br />a complete rehabilitation of roadway improvements <br />that involve widening the street from four to six; reha- <br />bllltating street pavement sections, including local- <br />ized removal and replacement of failed roadway; m - <br />stalling landscaped and hardscapad medians, Includ. <br />Ing drought -resistance plants, irrigation system, and lighting <br />system; reconstructing deficient sidewalk, curb, gutter, <br />driveway approaches, and ADA -noncompliant curb ramps; <br />planting street parkway trees without irrigation, green <br />streets technologies, and complete streets <br />Client contact: Arturo Cervantes, Public Works Direc. <br />tor <br />(323) 553-9512 <br />Project Dates: 2015 to 2017 (design completed; con. <br />struction ongoing) <br />Project Team: Tyrone Peter, David Knell, John Hi- <br />dalgo, Vanessa Munoz, Mohsen Rahimian, Salvador <br />Lopez, Alexis Escobar, Ross Khlabanl, Ray Wellington, <br />Michael Bustos, Kenneth Krieger, Randy Shadowen, Ber. <br />nardo Reyes, Susana Barrientos, Bryan Nguyen, Sheila <br />McCracken, Robert Burch, Chris Stone, Edward Cox, <br />Christopher Kelley, Kevin Custado, Nicolle Spann, Robert <br />Sun, Elroy Kiepke, Ryan Moore <br />Artistic elements and gateway corridor entrance are In- <br />cluded In the design. Other improvements Include bus shel- <br />ters and bus turnouts; tratfic signal modifications with bat- <br />tery backup, pedestrian countdown heads, and upgrades to LED where possible. Signals will be synchro- <br />nized to reduce traffic congestion and Improve bus speeds. <br />Los Alamitos Boulevard Median improvements <br />City of Los Alamitos <br />$191.Katella Avenue <br />Los Alamitos, CA 90720 <br />Wilidan provided civil and traffic engineering and <br />other appurtenant services for street improvements <br />between Cerritos Avenue and Katella Avenue. As <br />one of three Improvement segments, the project In- <br />volves raised medians with landscaping and Irriga- <br />tion, hardware, decorative street lights, electrical re- <br />ceptacles for seasonal tree lighting, tree uplights and <br />monument signs. Median Improvements were opti- <br />mized through traffic analysis and vehicle turning <br />movement modeling. <br />Crosswalks at four signalized Intersections will be re- <br />moved and replaced with integral colored concrete. A <br />storm drain on Serpentine Drive will be modified. Por• <br />tions of the project limits will receive a 12 -inch -thick <br />full -depth asphalt concrete over 8 -inch -thick com- <br />pacted subgrade. Wilidan assisted the city with public outreach to gamer input through town hall meetings, <br />open houses, and public hearings. <br />client <br />Steven Mendoza, Community Development <br />Contact: <br />Director <br />(562) 431-3535 extension 300 <br />Project <br />2015 to 2017 (design completed; construc. <br />Dates: <br />tion ongoing) <br />Project <br />Tyrone Peter, David Knell, John Hidalgo, <br />Team: <br />Mohsen Rahimian, Michael Bustos, Randy <br />Shadowen, Bernardo Reyes, Susana Bar- <br />nentosBryan Nguyen, Sheila McCracken, <br />Robert Burch, Chris Stone, Edward Cox, <br />Kevin Custado, Elroy Kiepke <br />Proposal for On Call Engineering, 25 <br />"� ComPrenonaive. Innovative. Tn�sted. RFP No. 17-083 <br />