My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC.
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 12:50:42 PM
Creation date
7/17/2018 3:57:32 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2018-160-02
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON -CALL ENGINEERING SERVICES jI <br />WRIq, 805qurcns—Opllnr,A�`t8 <br />PROJECT ORGANIZATIONAL CHART <br />Tom Epperson, PE <br />Mark Hush, PE <br />Mike Tsol, PE Victor Ramhrez,.PE, SE Mazen Kassar, PE <br />Kyle:Rohn, PC Epic Yuen, PE, SE Nloole Han, PE <br />Erin G'abaflero .? <br />CE'WEI.R <br />Paulo Fell <br />GEOTECHNICAL <br />Leighton <br />Consulting <br />SCADA LOCAL/STATE HEALTII. <br />Astrid Fleischer, PE Cory Heggtveit <br />HYUROGECLOGY SURVEY TRAFFIC CONTROL. POTHOWNG <br />Richard Slade Metz Surveying PIVK Cardno, <br />&Associates Associates Saf r Dig, <br />GBelow <br />Mr. Victor Ramirez, PE, SE, will be the Project Manager for Structural Engineering. <br />Mr. Ramirez has more than 28 years of experience in structural engineering design and <br />construction support services with an emphasis in the design of water storage/water <br />containment and water conveyance related structures. This includes: reservoirs, <br />water/wastewater treatment plants, booster pump stations, well facilities, flow control facilities, <br />pressure reducing stations and pipelines. Mr. Ramirez also has experience working with the City <br />and the City Building Department since he worked on the John Garther Reservoir improvements, <br />Well No, 32 Rehabilitation Study, and San Lorenzo Sewer Lift Station. <br />Mr. Mazen Kassar, PE, will be the Project Manager for Electrical and Controls. Mr. Kassar has <br />more than 24 years of experience in electrical engineering design and construction <br />management. His background Includes designing medium and low voltage power distribution as <br />well as instrumentation and control systems for a wide variety of projects. He is also very <br />familiar with the City since he worked on the SA-3, $A-4 and SA-5 Flow Control Facilities, the <br />Crooke Reservoir Pump Station, and Well No, 24 Electrical upgrades. <br />Subconsultants <br />In order to provide all the services we feel will be needed for this project, Tetra Tech has added <br />the following subconsultants to our project team; <br />City of Santa Ana 5 - TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.