My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TETRA TECH, INC.
Clerk
>
Contracts / Agreements
>
T
>
TETRA TECH, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 12:50:42 PM
Creation date
7/17/2018 3:57:32 PM
Metadata
Fields
Template:
Contracts
Company Name
TETRA TECH, INC.
Contract #
A-2018-160-02
Agency
PUBLIC WORKS
Council Approval Date
6/19/2018
Expiration Date
6/18/2021
Insurance Exp Date
10/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON -CALL ENGINEERING SEFlVIOES <br />W.19f Rumoos-- OpIm A <br />Task A: 100% Construction Document (PS&E) Submittal -Tatra Tech will prepare the 1 b0% <br />PS&E's in accordance with the approved Basis of Design Report, compile In a matrix format all <br />60% comments received, and address and incorporate comments per the matrix. Two (2) hard <br />copies of full size plan sets, four (4) hard copies of half-size plan sets and one electronic pdf <br />copy will be submitted to the City for review. <br />Task 10: Final Construction Document (PS&E) Submittal - Tetra Tech will prepare the final <br />PS&E's ready for bidding, compile In a matrix format all 100% comments received, and address <br />and incorporate comments per the matrix. Two (2) hard copies of full size plan sets, four (4) <br />hard copies of half-size plan sets and one electronic pdf copy will be submitted to the City for <br />review, <br />Task 11: Ridding and Construction Phase Services - Throughout the bidding and <br />construction process, Tetra Tech will assist the City in the following Items: <br />• Attehd the pre�oonstructlon meeting and construction kick-off meeting. - <br />• Assist in responding to questions raised during the bidding process; <br />• Prepare at maximum two (2) addendums. <br />+ Respond in writing to contractor's questions (HFIs) during construction, We have assumed a <br />total of fifteen (15), of which live (5) will require design sketches or exhibits, <br />Attend site visits to clarify design issues. Assumed eight (8) hours for site visits and <br />construction meetings. <br />• Assist the City with start-up of the well, We have assumed eight (8) hours. <br />• Review shop drawings. We have assumed twenty (20) shop drawings. <br />• Evaluate and respond to contractor's requests for change orders, Assumed three (3), <br />Task 12: Record Drawings Preparation - Tetra Tech will prepare record drawings based on <br />the final as -built drawings provided by the contractor and/or City. We will submit one (1) full size <br />hard Copy of the Record Drawings along with one (1) electronic copy in MicroStation format. <br />Additional Work (OPTIONAL): <br />1. Modifications to Well Flushing Wiping <br />2. Adding Sodium 1-lypochlorite Facilities <br />3. Well Operation Modifications (directly into distribution system) <br />4. Site Specific Traffic Control Plans <br />5, PLC Panel Design and Strategies <br />6, Field Monitoring of the Well Rehabilitation Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.